Queensland Mining Approvals IndexMining Capital Funds

Data as at 14 September 2026 · from the Queensland EP Act public register

Coal progressive rehabilitation and closure plan

PRCP-EPML00716913 · RIBFIELD PTY. LTD.

PRC plan PRCP-EPML00716913-V1 for RIBFIELD PTY. LTD. (EPML00716913), coal. Current schedule final milestone 2053-12-10; 12 rehabilitation and improvement areas.

Environmental authority
EPML00716913
Holders
RIBFIELD PTY. LTD.; MIDDLEMOUNT COAL PTY LTD
Tenures
ML700014; ML700027; ML70379; ML70417
Plan versions
PRCP-EPML00716913-V1 (effective 2023-10-04)
Current schedule final milestone
2053-12-10
Areas in current schedule
12 · 2,785 ha

Schedule versions

VersionEffectiveFinal milestoneAreasDocument
1 (current)2023-10-042053-12-1012Schedule PDF

Rehabilitation and improvement areas

From the current schedule's tables. Land use categories are keyword groupings; the schedule's wording is shown beneath.

AreaActivitiesHectaresPost-mining land useFirst milestonePage
RA1rehabilitationWaste Rock Emplacement (slope <16%)752Native ecosystemNative Ecosystem (RE 11.5.3) (with non-native grasses)10/12/20236
RA2rehabilitationWaste Rock Emplacement – Existing Rehabilitation (slopes ≤330)52Native ecosystemNative Ecosystem (RE11.5.3) (with non-native grasses)10/12/20237
RA3rehabilitationWaste Rock Emplacement (Flat/Undulating)1209Native ecosystemNative Ecosystem (RE11.5.3)10/12/20238
RA4rehabilitationTailings Storage Facility23Native ecosystemNative Ecosystem (RE11.7.2)Commencement of first milestone:9
RA5rehabilitationInfrastructure Area382Native ecosystemNative Ecosystem (RE11.5.9)10/12/202310
RA6rehabilitationWater Management Infrastructure (Mine Water Dams)57Native ecosystemNative Ecosystem 11.3.27 (Retained Water Management Infrastructure)10/12/204411
RA7rehabilitationWater Management Infrastructure (Sediment Dams)23Native ecosystemNative Ecosystem 11.3.27 (Retained Water Management Infrastructure)10/12/204412
RA8rehabilitationWater Diversions58Native ecosystemNative Ecosystem (RE11.3.25) (with non-native grasses)10/12/202313
RA9rehabilitationWaste Rock Emplacement - Existing Rehabilitation (slope <16%)78Native ecosystemNative Ecosystem (RE11.5.3) (with non-native grasses)10/12/202314
RA10rehabilitationWaste Rock Emplacement - Existing Rehabilitation (Flat/Undulating)151Native ecosystemNative Ecosystem (11.5.3) (with non-native grasses)10/12/202315
IA1improvementNorthern VoidNUMA or voidFinal Residual Void204423
IA2improvementSouthern VoidNUMA or voidFinal Residual Void204424