P-PRCP-100882877 · JUBILEE METALS LIMITED
PRC plan P-PRCP-100882877 for JUBILEE METALS LIMITED (EPML00950913), minerals. Current schedule final milestone 2053-12-10; 10 rehabilitation and improvement areas. 1 applications, including information requests and replies.
- Environmental authority
- EPML00950913
- Holders
- JUBILEE METALS LIMITED
- Tenures
- ML5248
- Plan versions
- P-PRCP-100882877 (effective 2025-12-10)
- Current schedule final milestone
- 2053-12-10
- Areas in current schedule
- 10 · 80 ha
Schedule versions
| Version | Effective | Final milestone | Areas | Document |
|---|---|---|---|---|
| 1 (current) | 2025-12-10 | 2053-12-10 | 10 | Schedule PDF |
Rehabilitation and improvement areas
From the current schedule's tables. Land use categories are keyword groupings; the schedule's wording is shown beneath.
| Area | Activities | Hectares | Post-mining land use | First milestone | Page |
|---|---|---|---|---|---|
| RA1rehabilitation | Content WRD and Historic Sediment Dam | 7.8 | GrazingLow intensity grazing on native vegetation | Rehabilitation of RA1 commenced prior to PRCP transition | 17 |
| RA2rehabilitation | Content Hardstand, Historic Laydown Area North, Historic other mining disturbance and Historic Laydown Area South | 3.8 | GrazingLow intensity grazing on native vegetation | 10/12/2031 | 18 |
| RA3rehabilitation | Golden Butterfly and Iguana WRDs and backfilled pit (including the Golden Butterfly North Pit to be backfilled) | 37.6 | GrazingLow intensity grazing on native vegetation | 10/12/2030 | 19 |
| RA4rehabilitation | In-pit tailings storage facilities: Content Pit and Lady Isabella Pit | 4.4 | GrazingLow intensity grazing on native vegetation | 10/12/2030 | 20 |
| RA5rehabilitation | Sediment Basin, Mine infrastructure area (MIA) Sediment Basin and PAF Sump | 1 | GrazingLow intensity grazing on native vegetation | 10/12/2032 | 21 |
| RA6rehabilitation | Bombay Pit (2.4 ha) and Bombay set back area (0.7 ha) | 3.1 | Water, diversions and flood landformsWater Storage | 10/12/2030 | 22 |
| RA7rehabilitation | Roads and tracks | 10.3 | GrazingLow intensity grazing on native vegetation | 10/12/2034 | 23 |
| RA8rehabilitation | Topsoil and Subsoil Stockpile area | 6.2 | GrazingLow intensity grazing on native vegetation | 10/12/2034 | 24 |
| RA9rehabilitation | MIA | 5.8 | GrazingLow intensity grazing on native vegetation | 10/12/2033 | 25 |
| IA1improvement | Iguana Pit (9.8 ha) and setback (1.4 ha) | NUMA or voidResidual Void | 10/12/2030 | 35 |
Application A-PRCP-NEW-100882868
- Plan effective
- 2025-12-10
- Register
- Application record
9 documents on the register
- A-PRCP-NEW-100882868_ApplicationDocuments Other
- A-PRCP-NEW-100882868_ApplicationDocuments_Attachment_01 Other
- A-PRCP-NEW-100882868_ApplicationDocuments_Attachment_02 Other
- A-PRCP-NEW-100882868_ApplicationDocuments_Attachment_03 Other
- A-PRCP-NEW-100882868_InformationResponse Information response
- A-PRCP-NEW-100882868_InformationResponse_Attachment_01 Response attachment
- A-PRCP-NEW-100882868_InformationResponse_Attachment_02 Response attachment
- A-PRCP-NEW-100882868_InformationResponse_Attachment_03 Response attachment
- A-PRCP-NEW-100882868_InformationResponse_Attachment_04 Response attachment
Replies to requests not published on the register: 1
Request, as quoted by the applicant(proposed PRC plan and/or PRCP Guideline) Rehabilitation Planning Part 1 Section 5 of the proposed PRC plan The PRC plan contained limited information regarding: water quality of the water which will be released; dilution factors and factor of safety (FoS) for each NUMA. In accordance with section 126C and 126D of the EP Act and further detailed in section 6.3.2 of the PRCP Guideline, the PRC plan must provide information regarding how Non-Use Management Areas (NUMAs) will be managed in way that achieves best practice management, minimises risks to the environment and ensures that there are no environmental impacts beyond the tenure boundary. Provide an updated PRC plan with an assessment of each possible spill/over topping event, identified via modelling, including: analysis of the water quality with and without dilution, potential environmental impact from the event, mitigation measures and, area to be affected by the spill or overtopping event. 2 Section 2.4.8.1 Mining Pits, Section 7.1.7.7 Water Balance Assessment (2020), Appendix G RGS Summary Report on Goldsim Modelling and Appendix H Croydon Gold Mine Water Pit void water balance modelling suggested overtopping of Content Pit could occur. Proposed mitigation strategies include transfer of water from Content to Golden Butterfly Pits and extending the abandonment bund of Content Pit to reduce surface water inflow. No information on the effectiveness of this bund on Content Pit inflow was presented within th
Applicant repliedPage 3 of 10 • ESR/2016/3447 • Version 4.00 • Last reviewed: 09 JUN 2021 Queensland Government