Queensland Mining Approvals IndexMining Capital Funds

Data as at 14 September 2026 · from the Queensland EP Act public register

Coal progressive rehabilitation and closure plan

P-PRCP-100837276 · Vulcan South Coal Mine

PRC plan P-PRCP-100837276 for Vulcan South Coal Mine (P-EA-100265081), coal. Current schedule final milestone 2041-12-10; 10 rehabilitation and improvement areas. 1 applications, including information requests and replies.

Environmental authority
P-EA-100265081
Holders
Queensland Coking Coal Pty Ltd; QLD COAL AUST NO.1 PTY LTD
Tenures
ML700073
Plan versions
P-PRCP-100837276 (effective 2025-09-19)
Current schedule final milestone
2041-12-10
Areas in current schedule
10 · 1,406 ha

Schedule versions

VersionEffectiveFinal milestoneAreasDocument
12025-09-192037-12-1010Schedule PDF
2 (current)2025-09-192041-12-1010Schedule PDF

Rehabilitation and improvement areas

From the current schedule's tables. Land use categories are keyword groupings; the schedule's wording is shown beneath.

AreaActivitiesHectaresPost-mining land useFirst milestonePage
RA1rehabilitationNorth and South Ex-Pit Waste Rock Dump100.6 haNative ecosystemNative Ecosystem (RE11.4.8, 11.5.3 and 11.10.3)1-Aug-2610
RA2rehabilitationMain Ex-pit Waste Rock Dump91.1 haGrazingLow-intensity cattle grazing1-Aug-2711
RA3rehabilitationReinstated Watercourses46.1Native ecosystemNative ecosystems – riparian (RE11.3.25)1-Aug-3412
RA4rehabilitationNorth and South In-pit Dumps135.4 haNative ecosystemNative ecosystems (RE11.4.8, 11.5.3 and 11.10.3)1-Aug-2513
RA5rehabilitationMain In-pit Waste Rock Dump264.7 haGrazingLow-intensity cattle grazing1-Aug-2614
RA6rehabilitationPreviously wooded infrastructure areas (infrastructure, haul roads, offices, stockpiles, train load- out, rail loop CHPP, MIA and magazine)437.7Native ecosystemNative ecosystems (RE11.9.2, 11.5.9, 11.5.3, 11.10.1, 11.10.3, and 11.4.8)1-Aug-3215
RA7rehabilitationPreviously cleared infrastructure areas (haul roads)77.8 haGrazingLow-intensity cattle grazing1-Aug-3516
RA8rehabilitationWater management infrastructure in previously wooded areas14.1 haNative ecosystemNative ecosystems - non-riparian (RE11.9.2, 11.5.9, 11.5.3, 11.10.1, 11.10.3 and 11.4.8)1-Aug-3217
RA9rehabilitationWater management infrastructure in previously cleared areas10.1 haGrazingLow-intensity cattle grazing1-Aug-3218
RA10rehabilitationHighwall Mining Area (bench, dams, ex-pit WRD)228.0 haNative ecosystemNative ecosystems - non-riparian (RE11.10.1 and 11.10.3)1-Aug-2519

Application A-PRCP-AMD-100931550

Plan effective
2025-09-19
Register
Application record