Data as at 14 September 2026 · from the Queensland EP Act public register
EPVX03977316 · PEMBROKE OLIVE DOWNS PTY LTD
Minerals environmental authority EPVX03977316 (PEMBROKE OLIVE DOWNS PTY LTD), Granted. 5 conditions indexed. No PRC plan.
- Status
- Granted
- Holders
- PEMBROKE OLIVE DOWNS PTY LTD
- PRC plan
- None
- How it was read
- Numbered conditions (OCR)
- Register
- Register record · Instrument PDF
Conditions
5 numbered conditions read from the current instrument. Page numbers link into the register PDF.
- B2
Exploration The holder of the environmental authority is authorised to drill no more than seven (7) drill holes within the 500m buffer zone of Category B Environmentally Sensitive Areas.
- B3
Tracks constructed within the 500m buffer zone of Category B Environmentally Sensitive Areas: (a) must be less than 5 metres in width, including shoulder width and (b) must be more than 250m apart.
- B4
Tracks within the 500m buffer zone of Category B Environmentally Sensitive Areas must not be used when soil is saturated or otherwise prone to displacement or erosion by vehicle movement.
- B5
Campsites The holder of the environmental authority is not authorised to establish camps within Category B Environmentally Sensitive Areas or within the 500m buffer zone of Category B Environmentally Sensitive Areas.
- B6
Significant residual impacts to prescribed environmental matters are not authorised under this environmental authority or the Environmental Offsets Act 2014. (~~ Permit Environmental authority Definitions Words and phrases used throughout this license are defined below except where identified in the Environmental Protection Act 1994 or subordinate legislation. Where a word or term is not defined, the ordinary English meaning applies, and regard should be given to the Macquarie Dictionary. ‘Prescribed environmental matters’ has the meaning in section 10 of the Environmental Offsets Act 2014, limited to the Matters of State Environmental Significant listed in Schedule 2 of the Environmental Offsets Regulation 2014. ‘Significant residual impact’ has the meaning in Section 8 of the Environmental Offsets Act 1994. END OF PERMIT Attachments Eligibility criteria and standard conditions for exploration and mineral development projects—{ESR/201 6/1985) Cow