Queensland Mining Approvals IndexMining Capital Funds

Data as at 14 September 2026 · from the Queensland EP Act public register

Coal environmental authority

EPVX00960413 · BOARDWALK DINGO PTY LIMITED

Coal environmental authority EPVX00960413 (BOARDWALK DINGO PTY LIMITED), Granted. 16 conditions indexed. No PRC plan.

Status
Granted
Holders
BOARDWALK DINGO PTY LIMITED; Independent Coal Pty Limited
PRC plan
None
How it was read
Numbered conditions (OCR)
Register
Register record · Instrument PDF

Conditions

16 numbered conditions read from the current instrument. Page numbers link into the register PDF.

  1. A1-1

    For exploration activities the environmental authority holder must comply with each of the standard environmental conditions contained in the Code of Environmental Compliance for Exploration and Mineral Development Projects, except Condition 13, which is replaced by Schedule B conditions.

    page 2OCR text
  2. A1-2

    The holder of the environmental authority must not carry out exploration activities within a category A or B Environmentally Sensitive Area.

    page 2OCR text
  3. A1-3

    The holder of the environmental authority must install temporary visual markers on the boundary of the ERE to ensure that exploration activities are not carried out within the environmentally sensitive area. END OF CONDITIONS FOR SCHEDULE A Schedule B —Activities within Buffer of Endangered Regional Ecosystem Drilling or seismic grid

    page 2OCR text
  4. B1-1

    . Spacing of gridlines within the ERE buffer may only be undertaken at no less than 500 m apart.

    page 2OCR text
  5. B1-2

    . Spacing of gridlines may be reduced to 250 m at no more than three specified prospects within the ERE buffer. Drill sites

    page 2OCR text
  6. B2-1

    - |The operational area of the drill site within the ERE buffer must not exceed 1000 m?.

    page 2OCR text
  7. B2-2

    ’ Drill holes within the ERE buffer are limited to 100-200 mm in diameter.

    page 2OCR text
  8. B2-3

    The construction of sumps within the ERE buffer must not exceed 10 m?.

    page 2OCR text
  9. B2-4

    Topsoil stripping within the ERE buffer is limited to the sump area of 10 m’.

    page 2OCR textLand and soil
  10. B2-5

    The environmental holder must minimise disturbance within the ERE buffer and avoid clearing @ Queensland Government www.derm.qid.gov.au ecoaccess environmental licences and permits Permit Permit number: MIN200438106 mature trees. Tracks

    page 2OCR text
  11. B3-1

    Existing access and fence fine tracks must be used. Any new tracks are to be constructed by linking natural cleared or disturbed areas.

    page 3OCR text
  12. B3-2

    Tracks are not to be constructed greater than 4 metres in width.

    page 3OCR text
  13. B3-3

    Track construction involving blade clearing of established ground cover vegetation and/or clearing of mature trees is prevented or minimised. Temporary disturbance to waterways

    page 3OCR textBiodiversity
  14. B4-1

    The authority holder will ensure that the construction of new crossings over watercourse within the , ERE buffer is to be avoided and only permitted when no reasonable alternative is available.

    page 3OCR textSurface water
  15. B4-2

    In accordance to the Water Act 2000, the holder of this environmental authority is permitted to destroy vegetation, excavate and fill watercourses to establish temporary crossings when there is no flow. Works shall remain in place for no longer than 4 weeks. ; Other land disturbance (B5-1 ) ° Exploration within the ERE buffer must not involve costeaning or bulk sampling activities.

    page 3OCR textSurface water, Biodiversity
  16. B5-2

    Exploration camps must not be established within the ERE buffer. END OF CONDITIONS FOR SCHEDULE B Schedule C - Definitions “authority” means environmental authority (mining activities) under the Environmental Protection Act 1994. “environmental authority holder” means the holder of this environmental authority. “ERE” means Endangered Regional Ecosystem. “land” in the “land schedule” of this document means land excluding waters and the atmosphere. “watercourse” means a river, creek or stream in which water flows permanently or intermittently in a visibly defined channel (natural, artificial or artificially improved) with: (a) continuous bed and banks; (b) an extended period of flow for some months after rain ceases, and (c) an adequacy of flow that sustains basic ecological processes and maintains biodiversity. “waters” includes river, stream, lake, lagoon, pond, swamp, wetland, unconfined surface water, bed and bank of any waters, dams, non-tidal or tidal waters (including the sea) or any part-thereof. ~ END OF CONDITIONS @© queensiand Government www.derm.gld.gov.au

    page 3OCR textSurface water, Regulated structures