Queensland Mining Approvals IndexMining Capital Funds

Data as at 14 September 2026 · from the Queensland EP Act public register

Coal environmental authority

EPVX00311613 · Energy A Pty Ltd

Coal environmental authority EPVX00311613 (Energy A Pty Ltd), Granted. 13 conditions indexed. No PRC plan.

Status
Granted
Holders
Energy A Pty Ltd
PRC plan
None
How it was read
Numbered conditions (OCR)
Register
Register record · Instrument PDF

Conditions

13 numbered conditions read from the current instrument. Page numbers link into the register PDF.

  1. B2-4

    All new tracks are to be recorded with GPS and records kept of their location and made available to regulatory authorised on request.

    page 3OCR textMonitoring and reporting
  2. B2-5

    All tracks, including water course crossings, must be commissioned and operated in accordance with the Code of Practice for Native Forest Timber Production.

    page 3OCR text
  3. B2-6

    Rehabilitation of all new tracks is only to be conducted after liaison with the appropriate QLD Parks and Wildlife officers.

    page 3OCR textRehabilitation
  4. B2-7

    All new tracks are to be constructed with minimal top soil disturbance and clearing for tracks is limited to surface vegetation removal where practical. Other Land Disturbance

    page 3OCR textLand and soil, Biodiversity
  5. B3-1

    Activities must not include seismic lines, costeaning or bulk sampling.

    page 3OCR text
  6. B3-2

    All equipment such as earthmoving and drilling equipment must be used in a manner which prevents the spread of weeds, minimises unnecessary disturbance of topsoil and ground cover vegetation.

    page 3OCR textLand and soil, Biodiversity
  7. B4-3

    Prior to entering the Cudmore Resource Reserve all vehicles, machinery and equipment must be - washed down in accordance with the latest Department of Natural Resources and Water (NRW) Queensland checklist for clean down procedures. .

    page 3OCR text
  8. B4-4

    Campsites must not be established within the Resource Reserve.

    page 3OCR text
  9. B4-5

    All waste must be removed and disposed offsite.

    page 3OCR textWaste
  10. B4-6

    Burning of vegetation is not permitted.

    page 3OCR textBiodiversity
  11. B4-7

    Sediment controls barriers installed on the tenure should be made of non-organic material to prevent the spread of weeds. Rehabilitation & Reporting

    page 3OCR textRehabilitation, Land and soil, Monitoring and reporting
  12. B5-1

    Rehabilitation of areas disturbed within the Cudmore Resource Reserve must be completed as soon as practicable but no longer than 3 months after completion of the disturbance activity.

    page 3OCR textRehabilitation
  13. B5-2

    The environmental authority holder must revegetate disturbed areas of the Cudmore Resource Reserve with native plant species endemic to the area that will promote the same vegetation type and density of cover to that of the surrounding undisturbed areas in the Cudmore Resource Reserve. END OF CONDITIONS FOR SCHEDULE B pte ecoacceSs environmenial licences and permits Permit Permit number: MIN200620007 Schedule C -— Definitions “authority” means environmental authority (mining activities) under the Environmental Protection Act 1994. “environmental authority holder” means the holder of this environmental authority. “and” in the “land schedule” of this document means land excluding waters and the atmosphere. END OF CONDITIONS WAU

    page 3OCR textBiodiversity