Minerals environmental authority EPSL00068513 (Tangawa Gold Pty Ltd), Granted. 9 conditions indexed. No PRC plan.
- Status
- Granted
- Holders
- Tangawa Gold Pty Ltd
- Tenures
- ML10321
- PRC plan
- None
- How it was read
- Numbered conditions (OCR)
- Register
- Register record · Instrument PDF
Conditions
9 numbered conditions read from the current instrument. Page numbers link into the register PDF.
- G1
The environmental authority does not take effect until the grant of the tenure to the environmental authority holder, or until each environmental authority holder has become a holder, under the Mineral Resources Act 1989, of each of relevant mining tenements. he U / Permit Environmental authority EPSLO0068513
- G2
The conditions of this environmental authority are in force until a surrender of the authority is accepted pursuant to the Environmental Protection Act 1994. The conditions apply unless an amendment is approved pursuant to the Environmental Protection Act 1994.
- G3
Financial assurance The environmental authority holder is to give the administering authority a financial assurance in the amount and form and at a time required by the administering authority.
- G4
For mining activities on the mining lease (ML) the environmental authority holder must comply with each of the Standard Environmental Conditions contained in the Code of Environmental Compliance for Mining Lease Projects, January 2007.
- G5
For mining activities on the exploration permit for minerals (EPM), with the exception of any variations, the conditions of approval for this environmental authority include the standard conditions contained within the attached document entitled: Eligibility Criteria and Standard Conditions for Exploration and Agency interest: Water
- WA1
=ML10321 is located within Restricted Area 48, which is described as "Blue Valley Dam Site Burdekin and Bowen Rivers", under the Mineral Resources Act 1989. The following additional conditions, WA2 to WA(10, have been included in this environmental authority as recommended by SunWater. WA2_ The environmental authority holder is required to seek comments from SunWater on rehabilitation of the relevant mining tenement prior to submitting a surrender application to the administering authority. WA3_ Nochemicals whatsoever are to be used in connection with the processing of materials within the bed and banks of the Burdekin River (the River).
- WA4
All waste, oil and grease are to be removed from site. Two hundred litres is the maximum volume of fuel allowed to be stored on site at any time. The fuel is to be contained within a secure vessel. A suitable container will be installed at all times to prevent any possible spillage within the bed and banks of the River.
- WA5
No materials are to be extracted from the River's main low flow section located on the far right hand side of the River's bed.
- WA6
Extraction of materials is restricted to river wash only. No materials are to be disturbed or taken from the River's banks. All excavations made shall have a batter flatter than one on three. WA7_ The bed of the watercourse shall be left with an even longitudinal grade, smooth and free from holes and ridges. WA8_ The campsite location should be such that no domestic or industrial waste can enter the River. All rubbish is to be disposed of by authorised rubbish dumps. WAQY All toilet facilities are to be located at least 400m away from the river and shall be adequate to prevent any overflow or non-treated effluent entering the River. Permit Environmental authority EPSLO0068513 WA 10 All requirements for relevant licences and authorisations under the Water Act 2000 are to be approved prior to any mining being undertaken. These relate to construction of dams, watercourse alterations and extractions of water from the River. Agency interest: Land (variation conditions)