Queensland Mining Approvals IndexMining Capital Funds

Data as at 14 September 2026 · from the Queensland EP Act public register

Minerals environmental authority

EPSL00065813 · Tangawa Gold Pty Ltd

Minerals environmental authority EPSL00065813 (Tangawa Gold Pty Ltd), Granted. 12 conditions indexed. No PRC plan.

Status
Granted
Holders
Tangawa Gold Pty Ltd
Tenures
ML10024; ML10189
PRC plan
None
How it was read
Numbered conditions (OCR)
Register
Register record · Instrument PDF

Conditions

12 numbered conditions read from the current instrument. Page numbers link into the register PDF.

  1. A1

    The conditions of this environmental authority are in force until a surrender of the authority is accepted pursuant to the Environmental Protection Act 1994. The conditions apply unless an amendment i is approved pursuant to the Environmental Protection Act 1994.

    page 2OCR text
  2. A2

    The environmental authority holder is to give the administering authority a financial assurance in the amount and form and at a time required by the administering authority.

    page 2OCR text
  3. A3

    The environmental authority holder must comply with each of the Standard Environmental Conditions contained in the Code of Environmental Compliance for Mining Lease Projects dated January 2001." Schedule B — Additional Conditions' (B1} The environmental authority holder must ensure that any person employed or contracted is made aware of, understands and complies with conditions B2 to B10.

    page 2OCR text
  4. B2

    The requirements of this environmental authority, during the currency of the Mining Leases, shall continue until the site has been inspected by an officer of State Water Projects and any works may be directed are completed to the satisfaction of State Water Projects and the environmental authority holder has been notified in writing.

    page 2OCR textMonitoring and reporting
  5. B3

    No chemicals whatsoever are to be used in connection with the processing of materials within the bed and banks of the Burdekin River (the River).

    page 2OCR text
  6. B4

    All waste, oil and grease are to be removed from site. Two hundred litres is the maximum volume of fuel allowed to be stored on site at any time. The fuel is to be contained within a secure vessel. A suitable container will be installed at all times to prevent any possible spillage within the bed and banks of the River.

    page 2OCR textWaste
  7. B5

    No materials are to be extracted from the River's main low flow section located on the far right hand side of the River’s bed.

    page 2OCR text
  8. B6

    €xtraction of materials is restricted to river wash only. No materials are to be disturbed or taken from the River's banks. All excavations made shall have a batter flatter than one on three.

    page 2OCR text
  9. B7

    The bed of the watercourse shail be left with an even longitudinal grade, smooth and free from holes and ridges.

    page 2OCR textSurface water
  10. B8

    The campsite location should be such that no domestic or industrial waste can enter the River. All rubbish is to be disposed of by authorised rubbish dumps.

    page 2OCR textWaste
  11. B9

    Ail toilet facilities are to be located at least 400m away from the river and shall be adequate to prevent any overflow or non-treated effluent entering the River.

    page 2OCR text
  12. B10

    All requirements for relevant licences and authorisations under the Water Resources Act are to be approved prior fo any mining being undertaken. These relate to construction of dams, watercourse alterations and extractions of water from the River. " Schedule B reflects the conditions imposed as conditions of Mining Lease 10024 by State Water Projects, Department of Natural Resources. END OF ENVIRONMENTAL AUTHORITY “2 01/01 Page 2/of 2

    page 2OCR textSurface water, Regulated structures