Queensland Mining Approvals IndexMining Capital Funds

Data as at 14 September 2026 · from the Queensland EP Act public register

Minerals environmental authority

EPPR00704013 · MORANBAH NORTH COAL PTY LTD

Minerals environmental authority EPPR00704013 (MORANBAH NORTH COAL PTY LTD), Granted. 77 conditions indexed. No PRC plan.

Status
Granted
Holders
MORANBAH NORTH COAL PTY LTD; JFEMA MORANBAH NORTH PTY LTD; MITSUI MORANBAH NORTH INVESTMENT PTY LTD; NS COAL (MORANBAH NORTH) PTY LTD; NS MORANBAH NORTH PTY LTD; SHINSHO MORANBAH COAL PTY LTD
PRC plan
None
How it was read
Numbered conditions
Register
Register record · Instrument PDF

Conditions

77 numbered conditions read from the current instrument. Page numbers link into the register PDF.

  1. A1

    This environmental authority does not authorised environmental harm unless a condition contained within the authority explicitly authorises that harm. Where there is no condition or the authority is silent on a matter, the lack of a condition or silence shall not be construed as authorising harm.

  2. A2

    Financial Assurance Provide financial assurance in the amount and form required by the administering authority prior to the commencement of activities proposed under this environmental authority.

  3. A3

    The financial assurance is to remain in force until the administering authority is satisfied that no claim on the assurance is likely. Note: Where progressive rehabilitation is completed and acceptable to the administering authority, progressive reductions to the amount of financial assurance will be applicable where rehabilitation has been completed in accordance with the acceptance criteria defined within this environmental authority.

    page 7Rehabilitation
  4. A4

    Activity Prior to the commencement of activities on MDL273, MDL274 and EPC552, the environmental authority holder must develop and implement a program to ensure that all employees and contractors on site are aware of and comply with the relevant requirements of this environmental authority.

  5. A5

    The environmental authority holder is authorised to carry out mining activities on MDL273,

  6. A6

    The environmental authority holder must comply with each of the Standard Environmental Conditions contained in the 'Code of Environmental Compliance for Exploration and Mineral conditions in this environmental authority.

  7. A7

    Mining activities undertaken must be consistent with the "Grosvenor Project EM Plan (Anglo Coal Grosvenor Pty Ltd)", dated February 2012. Permit Environmental authority EPPR00704013

  8. A8

    Activity Contaminants must not be released to the receiving environment unless authorised by this environmental authority.

  9. A9

    Monitoring, Reporting and Emergency Procedures The environmental authority holder must comply with each of the `Monitoring, Reporting and Emergency Response Procedures' Standard Environmental Conditions contained in the `Code of

    page 8Monitoring and reporting
  10. A10

    The environmental authority holder must notify the administering authority by written notification as soon as practicable but within 24 hours after becoming aware of any emergency or incident which results in the release of contaminants not in accordance, or reasonably expected to be not in accordance, with the conditions of this environmental authority.

    page 8Monitoring and reporting
  11. A11

    The notification in condition A14 must include, but not be limited to, the following: a) The environmental authority number and name of the holder; b) The name and telephone number of the designated contact person; c) The location of the emergency or incident; d) The date and time of the emergency or incident; e) The time the holder of the environmental authority became aware of the emergency or incident; f) Where known: i) the estimated quantity and type of substances involved in the emergency or incident; ii) the actual or potential cause of the emergency or incident; and iii) a description of the nature and effects of the emergency or incident including environmental risks, and any risks to public health or livestock; g) Any sampling conducted or proposed, relevant to the emergency or incident; and h) Immediate actions taken to prevent or mitigate any further environmental harm caused by the emergency or incident; and i) What notification of stakeholders who may be affected by the emergency or incident has occurred or is being undertaken.

    page 8Monitoring and reporting
  12. A12

    Within ten (10) business days following the initial notification of an emergency or incident, or receipt of monitoring results, whichever is the latter, further written advice must be provided to the administering authority, including the following: (a) Results and interpretation of any samples taken and analysed; (b) Outcomes of actions taken at the time to prevent or minimise unlawful environmental harm; and (c) Proposed actions to prevent a recurrence of the emergency or incident. Permit Environmental authority EPPR00704013

    page 8Monitoring and reporting
  13. A13

    The environmental authority holder must notify, in writing, the occupiers or registered owners of affected land and any other potentially impacted stakeholder as soon as reasonably practicable after becoming aware of any emergency or incident that has the potential to impact on environmental values or breaches any condition of this environmental authority concerning releases of contaminants to the environment.

    page 9Monitoring and reporting
  14. A14

    The notification in condition A13 must include the following: a) The location of the emergency or incident; b) The date and time of the emergency or incident; c) The estimated quantity and type of any substances involved in the emergency or incident; d) The potential impacts to environmental values caused by the emergency or incident; and e) Where there is potential impact on livestock or human health, precautionary measures that should be taken.

    page 9Monitoring and reporting
  15. A15

    Record, compile and keep for a minimum of five (5) years all monitoring results required by this environmental authority and make available for inspection all or any of these records upon request by the administering authority.

    page 9Monitoring and reporting
  16. A16

    Where monitoring is a requirement of this environmental authority, ensure that a competent person(s) conduct all monitoring. Schedule B: Air Condition Condition number

    page 9Monitoring and reporting
  17. E1

    Waste Management The environmental authority holder must comply with each of the 'Waste Management' Standard Environmental Conditions contained in the 'Code of Environmental Compliance for Exploration and condition E2 and E3 of this environmental authority.

    page 10Waste
  18. E2

    General waste must not be disposed of within MDL 273, MDL 274 and EPC 552.

    page 10Waste
  19. E3

    Regulated Waste must not be disposed of within MDL 273, MDL 274 and EPC 552. Schedule F: Land Condition Condition number

    page 10Waste
  20. F1

    The environmental authority holder is authorised to carry out mining activities on MDL 273, MDL 274 and EPC 552, within any Category B Environmentally Sensitive Area subject to conditions of this authority.

  21. F2

    The environmental authority holder must comply with each of the 'Land Disturbance' Standard Environmental Conditions contained in the 'Code of Environmental Compliance for Exploration and conditions F2 to F4 of this environmental authority.

  22. F3

    The operational area within the drill sites undertaken as part of the 2012 drill program, as identified in Attachment 1, must not exceed 1200m 2 for small diameter drill holes.

  23. F4

    The operational area within the drill sites undertaken as part of the 2012 drill program, as identified in Attachment 2, must not exceed 5600m2 for large diameter drill holes. Permit Environmental authority EPPR00704013

  24. F5

    Nature Conservation The environmental authority holder must comply with each of the 'Nature Conservation' Standard Environmental Conditions contained in the 'Code of Environmental Compliance for Exploration and conditions of this environmental authority.

  25. F6

    In carrying out activities on MDL 273, MDL274 and EPC 552 all reasonable and practicable measures must be taken to prevent or minimise the likelihood of environmental harm being caused to any Category B Environmentally Sensitive Area and the 500m buffer of any Category B Environmentally Sensitive Area.

  26. F7

    Clearing of habitat trees is not authorised except with the approval of the administering authority.

    page 11Biodiversity
  27. F8

    Clearing of mature trees is authorised except with the approval of the administering authority.

  28. F9

    Debris from clearing or felling of trees must not accumulate within two (2) metres of any retained tree.

  29. F10

    Burning of vegetation is not permitted.

    page 11Biodiversity
  30. F11

    When carrying out mining activities in any Category B Environmentally Sensitive Area the holder of this environmental authority must do so in accordance with conditions F12 to F57.

  31. F12

    Hazardous Contaminants The environmental authority holder must comply with each of the 'Hazardous Contaminants' Standard Environmental Conditions contained in the 'Code of Environmental Compliance for

    page 11Waste
  32. F13

    All explosives, hazardous chemicals, corrosive substances, toxic substances, gases and dangerous goods must be stored and handled in accordance with the current Australian Standard where such is applicable.

    page 11Waste
  33. F14

    Flammable and combustible liquids, including petroleum products, must be stored and handled in accordance with the latest edition of 'AS1940 - The storage and handling of flammable and combustible liquids'.

  34. F15

    The environmental authority holder must minimise the potential for contamination of land and waters by diverting stormwater around contaminated areas and facilities used for the storage of chemicals and flammable or combustible liquids.

    page 11Surface water
  35. F16

    Drilling, Excavating and Sampling The environmental authority holder must comply with each of the 'Drilling, Excavating and Sampling' Standard Environmental Conditions contained in the 'Code of Environmental Compliance

  36. F17

    The environmental authority holder is not authorised to undertake 'Drift Drilling' drill holes in a Category B Environmentally Sensitive Area. Permit Environmental authority EPPR00704013

  37. F18

    The environmental authority holder is authorised to undertake a maximum of seven (7) small diameter 'Drift Drilling' drill holes in areas outside of any Category B Environmentally Sensitive Areas and 500m buffer of any Category B Environmentally Sensitive Area.

  38. F19

    The environmental authority holder is authorised to undertake a maximum of frfteen (15) small diameter 'Drift Drilling' drill holes within the 500m buffer of any Category B Environmentally Sensitive Area.

  39. F20

    The environmental authority holder is not authorised to undertake 'Resource Drilling' drill holes in a Category B Environmentally Sensitive Area.

  40. F21

    The environmental authority holder is authorised to undertake a maximum of three (3) 'Resource Drilling' drill holes in areas outside of any Category B Environmentally Sensitive Areas and 500m buffer of any Category B Environmentally Sensitive Area.

  41. F22

    The environmental authority holder is authorised to undertake a maximum of five (5) 'Resource Drilling' drill holes within the 500m buffer of a Category B Environmentally Sensitive Area.

  42. F23

    Drill site intensity is limited to four sites per hectare within the 500m buffer of any Category B Environmentally Sensitive Area.

  43. F24

    The operational area within the drill site for smaller diameter holes (100 mm core), as identified in Attachment 1, must not exceed 1200m2.

  44. F25

    The operational area within the drill site for larger diameter holes (200mm core), as identified in Attachment 2, must not exceed 5600m2.

  45. F26

    Drill holes within any Category B Environmentally Sensitive Area are to be a maximum of 380mm diameter (200mm core).

  46. F27

    Drill holes within the 500m buffer of any Category B Environmentally Sensitive Area are to be a maximum of 380mm diameter (200mm core).

  47. F28

    The sumps for smaller diameter holes less than 125mm diameter within the 500m buffer of any Category B Environmentally Sensitive Area must not exceed 60m2.

  48. F29

    The sumps for larger diameter holes less than 380mm diameter within the 500m buffer of any Category B Environmentally Sensitive Area must not exceed 205 m2.

  49. F30

    Gridlines and Geophysical Surveys The environmental authority holder must comply with each of the 'Gridlines and Geophysical Surveys' Standard Environmental Conditions contained in the 'Code of Environmental Compliance for Exploration and Mineral Development Projects EM586 Permit Environmental authority EPPR00704013

  50. F31

    The environmental authority holder is not authorised to undertake 2D seismic survey tracks. Within any Category B Environmentally Sensitive Area.

  51. F32

    The environmental authority holder is not authorised to undertake 2D seismic survey tracks within the 500m buffer of any Category B Environmentally Sensitive Area.

  52. F33

    The environmental authority holder is not authorised to undertake 3D seismic survey tracks in any Category B Environmentally Sensitive Area.

  53. F34

    The environmental authority holder is authorised to undertake no more than 78 kilometres of 3D seismic survey tracks in total across MDL 273, MDL273 and EPC552.

  54. F35

    The environmental authority holder is authorised to undertake no more than 2.2 kilometres of 3D seismic survey tracks within the 500m buffer of any Category B Environmentally Sensitive Area.

  55. F36

    Spacing of 3D seismic gridlines within the 500m buffer of any Category B Environmentally Sensitive Area may only be undertaken at minimal intervals of 30m for receiver lines and 50 meters for source lines.

  56. F37

    Topsoil and Overburden Management The environmental authority holder must comply with each of the 'Topsoil and Overburden Management' Standard Environmental Conditions contained in the 'Code of Environmental Compliance for Exploration and Mineral Development Projects EM586

    page 13Land and soil
  57. F38

    Topsoil stripping within any Category B Environmentally Sensitive Area must not exceed the sump area of 60m2.

    page 13Land and soil
  58. F39

    Topsoil stripping within the 500m buffer of any Category B Environmentally Sensitive Area must not exceed an area of 625m2 (with dimensions no greater than 25m x 25m).

    page 13Land and soil
  59. F40

    Roads and Tracks The environmental authority holder must comply with each of the 'Roads and Tracks' Standard Environmental Conditions contained in the 'Code of Environmental Compliance for

  60. F41

    Any existing access and fence line tracks must be used.

  61. F42

    Any new tracks are to be constructed by linking naturally cleared or previously disturbed areas where practical.

  62. F43

    The construction of any new tracks must be recorded with a Global Positioning System (GPS) in GDA94 coordinate system and records kept of their location and made available to the administering authority upon request.

    page 13Monitoring and reporting
  63. F44

    Tracks are not to be constructed greater than 5m in width.

  64. F45

    Track construction involving blade clearing of established ground cover vegetation and/or clearing of mature trees is to be prevented or minimised.

    page 13Biodiversity
  65. F46

    Spacing of tracks must not be less than 250m. Permit Environmental authority EPPR00704013

  66. F47

    No clearing or disturbance for access to boreholes will take place in any Category B Environmentally Sensitive Area or within the 500m buffer of any Category B Environmentally Sensitive Area.

  67. F48

    Service, Maintenance and Storage Areas The environmental authority holder must comply with each of the 'Service, Maintenance and Storage Areas' Standard Environmental Conditions contained in the 'Code of Environmental Compliance for Exploration and Mineral Development Projects EM586

  68. F49

    Previous approved disturbance All outstanding rehabilitation on mining tenures MDL273, MDL274 and EPC552 must be rehabilitated in accordance with this environmental authority.

    page 14Rehabilitation
  69. F50

    All outstanding rehabilitation on mining tenures MDL 273 and EPC 552 under this environmental authority, including disturbance to any Category B Environmentally Sensitive Area or within the 500m buffer of any Category B Environmentally Sensitive Area must be rehabilitated within three months of the commencement of this environmental authority.

    page 14Rehabilitation
  70. F51

    All outstanding rehabilitation on mining tenures MDL 273 and EPC 552 previously approved under this environmental authority, including disturbance to any Category B Environmentally Sensitive Area or within the 500m buffer of any Category B Environmentally Sensitive Area must be rehabilitated within three months of the commencement of this environmental authority.

    page 14Rehabilitation
  71. F52

    All outstanding rehabilitation on mining tenures MDL 274 previously approved under this environmental authority must be rehabilitated within three months of the commencement of this environmental authority.

    page 14Rehabilitation
  72. F53

    The environmental authority holder must comply with each of the 'Rehabilitation'Standard Environmental Conditions contained in the 'Code of Environmental

    page 14Rehabilitation
  73. F54

    Rehabilitation of areas disturbed within any Category B Environmentally Sensitive Area or within the 500m buffer of any Category B Environmentally Sensitive Area must be completed as soon as practicable but no longer than 3 months after completion of the disturbance activity.

    page 14Rehabilitation
  74. F55

    The environmental authority holder must revegetate disturbed areas in any Category B Environmentally Sensitive Area or within the 500m buffer of any Category B Environmentally Sensitive Area with native plant species endemic to the area that will promote the same vegetation type and density of cover to that of the surrounding undisturbed areas in any Category B Environmentally Sensitive Area or within the 500m buffer of any Category B Environmentally Sensitive Area as per the "Grosvenor Project EM Plan (Anglo Coal Grosvenor Ply Ltd)", dated February 2012.

    page 14Biodiversity
  75. F56

    All land subject to mining activities must be rehabilitated to a non-polluting, safe, stable and self- sustaining landform and in accordance with Table 10 of the "Grosvenor Project EM Plan (Anglo Coal Grosvenor Pty Ltd)", dated February 2012. Permit Environmental authority EPPR00704013

    page 14Rehabilitation
  76. F57

    An annual report must be prepared each year and submitted with each annual return. The report must include details of exploration activities undertaken and details of new tracks and progressive rehabilitation works completed to demonstrate compliance with condi tions

    page 15Rehabilitation, Monitoring and reporting
  77. F49

    to F56. Permit Environmental authority EPPR00704013 Definitions Key terms and/or phrases used in this document are defined in this section. Where a term is not defined, the definition in the Environmental Protection Act 1994, its regulations or environmental protection policies must be used. If a word remains undefined it has its ordinary meaning. "Artesian bore" includes a shaft, well, gallery, spear or excavation, and any works co nstructed in connection with the shaft well, gallery, spear or excavation, that taps an aquifer and the water flows, or has flowed, naturally to the surface. "Authority" means environmental authority (mining activities) under the Environmental Protection Act 1994. "Borehole" means either an artesian bore or a subartesian bore. "Campsite" the area encompassing any dwelling, amenities (e.g. toilet block, power generator), sewage or general waste disposal facility and includes the office area and vehicle parki ng areas associated with a temporary or permanent mining camp. "Costeaning" the digging of a trench or pit across the seam or ore body for exposing, sampling and mapping of the ore body. "Density of cover" In reference to trees and/or shrubs, it means the number of trees or shrubs in a specified area (e.g. 50 trees per square kilometre). With reference to understory plant species (e.g. grasses and forbs), it means the percentage of surface area covered by a particular species. "Disturbed" any area that has had its natural state altered by the action or interference of carrying out an activity associated with the exploration project. "Drift Drilling" as defined in the Grosvenor Project EM Plan (Anglo Coal Grosvenor Pty Ltd) February 2012. "Endangered regional ecosystem" means a regional ecosystem identified as endangered in the database maintained by the administering authority called 'Regional ecosystem description database' containing regional ecosystem numbers and descriptions. "Environmental authority" means a licence or approval issued by the administrating authority under the Environmental Protection Act 1994. "Environmental authority holder" means the holder of this environmental authority. "Environmentally Sensitive Areas" refers to locations, however large or small, that have environmental values that contribute to maintaining biological diversity and integrity, have intrinsic or attributed scientific, historical or cultural heritage value, or are important in providing amenity, harmony or sense of community. Refer to Appendix A of Code of Environmental Compliance for Exploration and Mineral Development Projects. "Financial assurance" means a security deposit, either cash or a bank guarantee, that is held by the administrating authority to cover the potential: (a) costs to rehabilitate areas disturbed by mining activities; and (b) costs to restore property improvements disturbed by mining activities; and

    page 15Rehabilitation, Groundwater, Waste