Data as at 14 September 2026 · from the Queensland EP Act public register
EPML04041216 · CAPRICORN STONE PRODUCTS PTY LTD
Minerals environmental authority EPML04041216 (CAPRICORN STONE PRODUCTS PTY LTD), Granted. 64 conditions indexed. Holds PRC plan PRCP-EPML04041216-V1.
- Status
- Granted
- Holders
- CAPRICORN STONE PRODUCTS PTY LTD
- Tenures
- ML100349; ML7341; ML80102
- PRC plan
- PRCP-EPML04041216-V1 · effective 2023-02-28
- How it was read
- Numbered conditions, partial, plus page text
- Register
- Register record · Instrument PDF
Conditions
64 numbered conditions read from the current instrument. Page numbers link into the register PDF.
- A1
Conditions contained in Part 1 -- Mining Activities of this environmental authority only apply to the mining activities conducted on ML7341, ML80102 and ML100349.
- A2
This environmental authority authorises environmental harm referred to in the conditions. Where there is no condition or this environmental authority is silent on a matter, the lack of a condition or silence does not authorise environmental harm.
- A3
In carrying out the relevant activity authorised by this environmental authority, the holder of this environmental authority must comply with the approved site plans (Figure 1 -- Approved site plans) and must not exceed the area of disturbance specified in Table A1 -- Areas of disturbance on site (in ha).
- A4
The holder of this environmental authority must: a) install all measures, plant and equipment necessary to ensure compliance with the conditions of this environmental authority; b) maintain such measures, plant and equipment in a proper and efficient condition; c) operate such measures, plant and equipment in a proper and efficient manner; and d) Ensure all instruments and devices used for the measurement or monitoring of any parameter under any condition of this environmental authority are properly calibrated. Table A1- Areas of disturbance on site (in ha) Domain Description Disturbance Domain Approximate Area (ha) 55.3 Total area of allotments under EA 31.4 16.8 Domains Active mining 1.7 0.6 Processing, set-down 50.5 Stormwater management Buildings, structures, fuel/oil store Total area of disturbance Permit Environmental authority - EPML04041216
- A5
Monitoring Except where specified by another condition of this environmental authority, all monitoring records or reports required by this environmental authority must be kept for a period of not less than five (5) years.
- A9
Risk management The holder of this environmental authority must develop and implement a risk management system for relevant activities which mirrors the content requirement of the Standard for Risk Management (IS031000:2009), or the latest edition of an Australian standard for risk management, to the extent relevant to environmental management, within ninety (90) business days of the environmental authority effective date.
- A10
Notification of emergencies, incidents and exceptions The holder of this environmental authority must notify the administering authority by written notification within twenty-four (24) hours, after becoming aware of any emergency, monitoring result or incident which results in the release of contaminants not in accordance, or reasonably expected to be not in accordance with, the conditions of this environmental authority.
- A11
Within ten (10) business days following the initial notification of an emergency or incident, or receipt of monitoring results, whichever is the latter, further written advice must be provided to the administering authority, including the following: a) results and interpretation of any samples taken and analysed; b) outcomes of actions taken at the time to prevent or minimise unlawful environmental harm; and c) proposed actions to prevent a recurrence of the emergency or incident.
- A12
Complaints The holder of this environmental authority must record all environmental complaints received about the relevant activities including: a) name, address and contact number for of the complainant; b) time and date of complaint; c) reasons for the complaint; d) investigations undertaken; e) conclusions formed; f) actions taken to resolve the complaint; g) any abatement measures implemented; and h) the person responsible for resolving the complaint.
- A13
The holder of this environmental authority must, when requested by the administering authority, undertake relevant specified monitoring within a reasonable timeframe nominated or agreed to by the administering authority to investigate any complaint of environmental harm. The results of the investigation (including an analysis and interpretation of the monitoring results) and abatement measures, where implemented, must be provided to the administering authority within ten (10) business days of completion of the investigation, or no later than 10 business days after the end of the timeframe nominated by the administering authority to undertake the investigation. Permit Environmental authority - EPML04041216
- A14
Third-party reporting The holder of this environmental authority must: a) within one (1) year of the commencement of this environmental authority, obtain from an appropriately qualified person a report on compliance with the conditions of this environmental authority; b) obtain further such reports at regular intervals, not exceeding three-yearly intervals, from the completion of the report referred to above; and c) provide each report to the administering authority within ninety (90) days of its completion.
- A15
Amendments to standards, policies or guidelines Where a condition of this environmental authority requires compliance with a standard, policy or guideline published externally to this environmental authority and the standard is amended or changed subsequent to the issue of this environmental authority, the holder of this environmental authority must: a) comply with the amended or changed standard, policy or guideline within two years of the amendment or change being made, unless a different period is specified in the amended standard or relevant legislation; and b) until compliance with the amended or changed standard, policy or guideline is achieved, continue to remain in compliance with the corresponding provision that was current immediately prior to the relevant amendment or change.
- A16
Scale and intensity of activity .The activity must be conducted in accordance with the following limits of scale and intensity: (a) the quantity of material mined under Schedule 3, ERA 20 must not exceed 1,000,000 tonnes in any one (1) year; and (b) the quantity of material extracted under Schedule 2, ERA 16 must not exceed 1,000,000 tonnes in any one (1) year; and (c) the combined quantity of material mined under Schedule 3, ERA 20 and extracted under Schedule 2, ERA 16 must not exceed 1,350,000 tonnes in any one (1) year. Permit Environmental authority - EPML04041216 Schedule B - Air Condition Condition number
- C1
Chemicals and flammable or combustible liquids All explosives, hazardous chemicals, corrosive substances, toxic substances, gases, dangerous goods and flammable and combustible liquids, including petroleum products, must be stored and handled in accordance with the current Australian standard.
- C2
The environmental authority holder must minimise the potential for contamination of land and waters by diverting uncontaminated stormwater around contaminated areas and facilities used for the storage of chemicals and flammable or combustible liquids.
- C6
Contaminated Land Before applying for surrender of a mining lease, the holder must (if applicable) provide to the administering authority a site investigation report under the Act, in relation to any part of the mining lease which has been used for notifiable activities or which the holder is aware is likely to be contaminated land, and also carry out any further work that is required as a result of that report to ensure that the land is suitable for its final land use.
- C7
The environmental authority holder must minimise the potential for contamination of land by hazardous contaminants.
- C8
Impacts to Prescribed Environmental Matters Significant residual impacts to prescribed environmental matters are not authorised under this environmental authority or the Environmental Offsets Act 2014 unless the impact(s) is specified in Table C1 - Significant residual impacts to prescribed environmental matters. Table C1- Significant residual impacts to prescribed environmental matters Prescribed Environmental Location of Impact Maximum Extent of Impact Matter Regulated vegetation within N/A 0 ha (buffer applied; no defined distance of disturbance permitted) watercourse (MSES - riparian) C9 Records demonstrating that no significant residual impact has occurred to any prescribed environmental matter(s) must: (a) be completed by an appropriately qualified person; and (b) kept for the life of the environmental authority. Permit Environmental authority - EPML04041216 Schedule D - Noise Condition Condition number
- D1
Noise limits The holder of this environmental authority must ensure that noise generated by the mining activities does not cause the criteria in Table D1 -- Noise Limits to be exceeded at a sensitive place or commercial place. Table D1 - Noise Limits Monday to Saturday Sundays and Public Holidays Noise level 7am to 6pm to 10pm 9am to 6pm to 10pm to dB(A) 6pm 10pm to 7am 6pm 10pm 9am measured as: Noise Measured at the nearest sensitive place LAeq, adj, 15 CV = 50 AV CV = 45 CV = 40 CV = 45 CV = 40 CV = 35 AV mins =5 AV = 5 AV = 0 =0 AV = 5 AV = 5 LA1, adj, 15 CV = 55 CV = 50 CV = 45 CV = 50 CV = 45 AV CV = 40 AV mins AV = 10 AV = 10 AV = 10 AV = 5 = 10 =5 Noise Measured at the nearest commercial place LAeq, adj, 15 CV = 55 AV CV = 50 CV = 45 CV = 50 CV = 45 AV CV = 40 mins = 10 AV = 10 AV = 5 AV = 10 = 10 AV = 5 Table D1 - Noise limits notes: 1 CV = Critical Value 2 AV = Adjustment Value 3 To calculate noise limits in Table D1: i. If bg (CV - AV): Noise limit = bg + AV ii. If (CV - AV) < bg CV: Noise limit = CV iii. If bg > CV: Noise limit = bg + 0 4 In the event that measured bg (LA90, adj, 15 mins) is less than 30 dB(A), then 30 dB(A) can be substituted for the measured background level 5 bg = background noise level (LA90, adj, 15 mins) measured over 3-5 days at the nearest sensitive receptor 6 If the project is unable to meet the noise limits as calculated above alternative limits may be calculated using the processes outlined in the "Planning for Noise Control" guideline. Permit Environmental authority - EPML04041216
- D2
Monitoring and reporting Noise monitoring and recording must include the following descriptor characteristics and matters: a) LAN, T (where N equals the statistical levels of 1, 10 and 90 and T = 15 mins); b) background noise LA90; c) the level and frequency of occurrence of impulsive or tonal noise and any adjustment and penalties to statistical levels; d) atmospheric conditions including temperature, relative humidity and wind speed and directions; e) effects due to any extraneous factors such as traffic noise; f) location, date and time of monitoring; and g) if the complaint concerns low frequency noise, Max LpLlN,T and one third octave band measurements in dB(LlN) for centre frequencies in the 10 -- 200 1-IZ range.
- D3
Restrictions The environmental authority holder is not permitted to undertake explosive blasting on the site. Permit Environmental authority - EPML04041216 Schedule E - Groundwater Condition Condition number
- G1
Stormwater and water sediment controls An Erosion and Sediment Control Plan (ESCP) must be developed by a Certified Professional in Erosion and Sediment Control' and implemented by the environmental authority holder. The ESCP must be submitted to the administering authority by 9 November 2016. Note: For all stages of the mining activities on the site, the ESCP must minimise erosion and the release of sediment to receiving waters and contamination of stormwater.
- G2
The stormwater runoff from disturbed areas, generated by (up to and including) a 24 hour storm event with an average recurrence interval of 1 in 5 years must be retained on site or managed to remove contaminants before release.
- G3
The method of water sampling required by this environmental authority must comply with that set out in the latest edition of the administering authority's Water Quality Sampling Manual.
- G4
Contaminants released from site Contaminants released from site must not exceed the limits defined in Table G3 - Contaminant release point and receiving waters limits when released from the points prescribed in Table G1 -- Release points for contaminants released from site. Note: A figure depicting release point locations is to be provided with the ESCP submitted in accordance with condition G1.
- G5
Contaminants released to receiving waters Contaminants released to receiving waters must not exceed the limits defined in Table G3 Contaminant release points and receiving waters limits when monitored at the points prescribed in Table G2 -- Receiving waters monitoring points.
- G6
During a release event parameters specified in Table G3 - Contaminated water release point and receiving waters limits must be monitored at the locations and frequencies specified in Table G1 -- Release points for contaminant released from site and Table G2 - Receiving waters monitoring points, and illustrated in Figure 2 - Release points and monitoring points. Note: A figure depicting monitoring point locations is to be provided with the ESCP submitted in accordance with condition G1. Permit Environmental authority - EPML04041216
- G7
If any parameter monitored at the locations specified in Table G1 -- Release points for contaminants released from site and Table G2 - Receiving waters monitoring points exceed the limits specified in Table G3 - Contaminant release points and receiving waters limits, the environmental authority holder must compare the downstream monitoring results to the upstream monitoring results, and: 1. If the downstream monitoring result is less than or equal to the upstream monitoring result and the receiving water limit, then no action is to be taken; 2. If the downstream monitoring result is greater than the receiving water limit, complete an investigation into the exceedances and the potential for environmental harm and provide a written report to the administering authority within 28 days of receiving the result, including: a) monitoring data required by conditions G1 and G2; b) details of the investigations into environmental harm; c) recommendations to prevent the exceedance of release limits and/or receiving waters limits; and d) actions taken to prevent environmental harm. Table G1 -- Release points for contaminants released from site. Release Longitude TBA Latitude Contaminated water Monitoring Monitoring point frequency point (RP) TBA source and location At release
- MP11
150.349131 -23.506091 200m upstream of the RP4 Within 2 hours confluence with unnamed of a release, creek and upstream of all then daily during influences.1 a release Downstream compliance monitoring points
- MP21
150.3498951 -23.5032841 130m downstream of RP4 Within 2 hours
- MP41
150.3464021 -23.4959261 confluence with unnamed of a release, creek.1 then daily during
- MP61
150.346131 90m downstream of RP2 a release confluence with unnamed creek.1 -23.490711 150m downstream of RP1 confluence with unnamed creek.1 Control monitoring points
- MP31
150.3468651 -23.4969731 15m downstream of RP2 Within 2 hours
- MP51
150.346051 -23.49261 confluence with unnamed of a release, creek.1 then daily during 120m downstream of RP1 a confluence with unnamed release creek.1 Table G2 -- Receiving waters monitoring points notes: 1. Release point locations and details must be provided with the ESCP which must be submitted to the administering authority in accordance with condition G1. Table G3 -- Contaminant release points and receiving waters limits Monitoring Parameter Release point limit Receiving waters limits Suspended solids (TSS) mg/L 504 851 Electrical conductivity (EC) -S/cm 2501,5 4451,2 pH 6.5 - 8.51 6.5 - 8.51
- H1
Conditions contained in Part 2 -- Extractive Activities of this environmental authority only apply to the extractive activities conducted on the approved land.
- H2
Scale and intensity of activity The activity must be conducted in accordance with the following limits of scale and intensity: (a) the quantity of material mined under Schedule 3, ERA 20 must not exceed 1,000,000 tonnes in any one (1) year; and (b) the quantity of material extracted under Schedule 2, ERA 16 must not exceed 1,000,000 tonnes in any one (1) year; and (c) the combined quantity of material mined under Schedule 3, ERA 20 and extracted under Schedule 2, ERA 16 must not exceed 1,350,000 tonnes in any one (1) year.
- H4
Approved plans The environmental authority is approved in accordance with the plan in Figure 1 - Approved site plans.
- H6
Prevent and/or minimise likelihood of environmental harm A person carrying out an environmentally relevant activity (ERA) to which this approval relates, must take all reasonable and practicable measures to prevent and/or to minimise the likelihood of environmental harm being caused.
- H7
A copy of this environmental authority must be kept in a location readily accessible to personnel carrying out the activity.
- H8
Record keeping The operator of an ERA authorised by this environmental authority must record, compile and keep all data required by this approval. These data must be made available to the administering authority upon request.
- H9
All records required by this approval must be kept for a minimum of five (5) years.
- H10
Notification Any emergency, incident or event, which results in the release of contaminants not in accordance with, or reasonably expected to be in accordance with the conditions of this approval, must be reported by telephone to the administering authorities' Pollution Hotline2 or the district office located in the area where the release occurred. Any such release must be reported as soon as the holder of the environmental authority becomes aware of the emergency incident or event. 2At the time of issuing this permit the number for the Pollution Hotline was 1300 130 372. This number may change at any time in the future and should be checked prior to use. Permit Environmental authority - EPML04041216
- H11
Information to follow notification A written notice detailing the following information must be provided to the administering authority within seven (7) days of any advice provided in accordance with condition H10: a) The name of the operator, including their approval/registration number; b) The name and tele hone number of a designated contact person; c) The quantity and nature of the substance released; d) Vehicle and registration details; e) The names of person/s involved in the release and/or cleanup; f) The location and time of the release; g) The suspected cause of the release; h) A description of the effects of the release; i) Details of the area of impact; j) The results of any sampling performed in relation to the release; k) Actions taken to mitigate any environmental harm caused by the release and details of the success of these actions; and l) Proposed actions to prevent a recurrence of the release.
- H12
Alterations No change, replacement or operation of any plant or equipment is permitted if the change, replacement or operation of plant or equipment increases, or is likely to substantially increase the risk of environmental harm above that expressly provided by this environmental authority.
- H13
Spill Kits An appropriate spill kit must be kept on site.
- H14
Anyone operating under this environmental authority must be trained in the use of the spill kit. Permit Environmental authority - EPML04041216 Schedule I - Air Condition Condition number
- I1
Odour Nuisance The release of noxious or offensive odours or any other noxious or offensive airborne contaminants resulting from the activity must not cause a nuisance at any nuisance sensitive place.
- I2
Dust Nuisance The release of dust and/or particulate matter resulting from the activity must not cause an environmental nuisance at any nuisance sensitive place.
- I3
Dust suppression measure must be implemented and maintained on site to prevent the movement of dust created as a result of the activity past the site boundaries.
- I4
Dust emissions from stockpiles of material are to be controlled by reasonable and practicable methods such as the following; a) Water sprays; and b) Covers i.e. artificial covers such as tarpaulins or vegetation matter to prevent emissions.
- I5
Release of dust or particulate, exceeding the following levels, when measured at any nuisance sensitive place, is considered as an environmental nuisance: a) Dust deposition of 4.0 grams per square meter per month, when measured in accordance with Australian Standard AS 3580.10:2003 Methods of sampling and analysis of ambient air -- Determination of particulate matter -- Deposited matter -- Gravimetric method (or more recent edition); or b) A concentration of particulate matter with an aerodynamic diameter of less than 10 micrometres (PM10) suspended in the atmosphere of 50 micrograms per cubic metre over a 24 hour averaging period, at a nuisance sensitive place downwind of the site, when monitored in accordance with Australian Standard AS 3580 9.6 'Ambient Air -- Particulate Matter -- Determination of suspended particulate PM10 high volume sampler with size -- selective inlet -- gravimetric method'; or an alternative method of monitoring
- I6
When requested by the administering authority, dust and particulate monitoring must be undertaken within a reasonable timeframe nominated by the administering authority, to investigate any complaint of environmental nuisance caused by dust and/or particulate matter. The results of the monitoring must be notified to the administering authority within seven (7) days following completion of the monitoring. Monitoring must be carried out at a place(s) relevant to the potentially affected nuisance sensitive place and at upwind control sites and must include: a) For a complaint alleging dust nuisance, dust deposition; b) For a complaint alleging adverse health effects caused by dust, the concentration per cubic metre of particulate matter with an aerodynamic diameter of less than 10 micrometres (-m) (PM10) suspended in the atmosphere over a 24hr averaging time. Permit Environmental authority - EPML04041216 Schedule J - Land Condition Condition number
- J1
Topsoil can be removed from site and utilised elsewhere.
- J2
Protecting land from contaminants Activities on site must be conducted in a way that prevents any potential or actual release of contaminants to land.
- J3
There are to be no fuels or oils stored on site for use with the extractive activity. Extraction equipment must only be refuelled by transporting fuel on site. Schedule K - Water Condition Condition number
- K1
Erosion protection measures and sediment control measures must be implemented and maintained to minimise: a) Erosion of soils in areas disturbed by the activity; and b) The release of sediment to any waters. Erosion protection and sediment control measures may include: a) Suitable banks; b) Structures; and c) Diversion drains.
- K2
All waters flowing over disturbed areas including but not limited to the extraction area and storage areas, must be diverted to an onsite sediment basin.
- K3
Sediment basins must be constructed and maintained: a) So as to minimise the likelihood of any release of contaminants or wastes through the bed or banks of the structure to any waters (including groundwater); b) So that a freeboard of not less than 0.5 meters is maintained at all times, except in the event of exceptional weather conditions where the maintenance of such is impossible.
- K4
Contaminants must not be directly or indirectly released to any waters, including groundwater, or the bed or banks of any waters.
- K5
Stormwater management Suitable banks and/or diversion drains must be installed and maintained so that all stormwater originating from land up-gradient of disturbed areas, including extraction and storage areas is diverted away from entering these areas and any ponds or other structures used for the storage or treatment of contaminants.
- K6
Contaminants other than settled/treated stormwater runoff water must not be released to surface waters or the bed or banks of any watercourse. Permit Environmental authority - EPML04041216 Schedule L - Noise Condition Condition number
- N1
All waste (not including overburden) generated in carrying out the activity must be disposed of at a facility that can lawfully accept that waste. No waste is to be disposed of on site.
- N2
Waste, including vegetation matter, must not be burnt on site.
- N3
Any spillage of wastes, contaminants or other materials must be cleaned up as quickly as practicable. Such spillages must not be cleaned up by hosing, sweeping or otherwise releasing such wastes, contaminants or material to any waters. END OF PART 2 Permit Environmental authority - EPML04041216 Definitions Words and phrases used throughout this environmental authority are defined below. Where a definition for a term used in this environmental authority is not provided within this environmental authority but is provided in the Environmental Protection Act 1994 or subordinate legislation, the definition in the EP Act or subordinate legislation must be used. 'activity' means an environmentally relevant activity or associated auxiliary activity to which this approval relates. 'Administering Authority' is the agency that administers the environmental authority provisions under the Environmental Protection Act 1994. 'appropriately qualified person' means a person who has professional qualifications, training, skills or experience relevant to the nominated subject matter and can give authoritative assessment, advice and analysis on performance relating to the subject matter using the relevant protocols, standards, methods or literature. `background', with reference to the water schedule means the average of samples taken prior to the commencement of mining from the same waterway that the current sample has been taken. 'blasting' means the use of explosive materials to fracture: a) rock, coal and other minerals for later recovery, or b) structural components or other items to facilitate removal from a site or for reuse. 'bund' means: a) an earth mound or similar structure (e.g. a concrete block wall), whether impervious or not, constructed to contain spilled material (e.g. petrol, diesel, oil, etc.); or b) a structure to prevent or reduce soil erosion. 'certified', with respect to watercourse diversions, means assessed and approved by a suitably qualified and experienced person. In relation to 'as constructed' drawings and specifications, the certification must be by the suitably qualified person who supervised the construction of the watercourse diversion, or reestablishment of the watercourse. 'certification', 'certifying' or 'certified' by an appropriately qualified and experienced person in relation to a design plan or an annual report regarding dams/structures, means that a statutory declaration has been made by that person and, when taken together with any attached or appended documents referenced in that declaration, all of the following aspects are addressed and are sufficient to allow an independent audit at any time: a) exactly what is being certified and the precise nature of that certification b) the relevant legislative, regulatory and technical criteria on which the certification has been based c) the relevant data and facts on which the certification has been based, the source of that material, and the efforts made to obtain all relevant data and facts
Instrument text by page (numbering incomplete)
Numbering in this instrument has gaps, so its full text is also shown page by page.
- Page 1
Permit Environmental Protection Act 1994 Environmental authority - EPML04041216 This environmental authority is issued by the administering authority under Chapter 5 of the Environmental Protection Act 1994. Environmental authority number: EPML04041216 Environmental authority takes effect on the date that your related tenure is granted. This is the take effect date. The first annual fee is payable within 20 business days of the take effect date. The anniversary date of this environmental authority is the same day each year as the take effect date. The payment of the annual fee will be due each year on this day. An annual return will be due each year on 01 April. Transfers of this environmental authority are not authorised. Environmental authority holder(s) Name(s) Registered address CAPRICORN STONE PRODUCTS PTY LTD 227 Power Station Road STANWELL QLD 4702 Environmentally relevant activity and location details Environmentally relevant activity/activities Location(s) Schedule 3, 20: Clay pit mining, dimension stone ML7341 mining or mining gemstones (including the material ML80102 from which gemstones are extracted) (b) more than ML100349 100,000t but not more than 1,000,000t in a year Lot 1 on LIV40877 Schedule 2, 16: Extraction and Screening 2: Lot 179 on LN2465 Extracting, other than by dredging, in a year, the Lot 184 on LIV40877 following quantity of material (b) more than 100,000t Lot 2 on LIV40877 but not more than 1,000,000t Lot 252 on SP275125 Lot 3 on LIV40877 Schedule 2, 16: Extraction and Screening 3: Lot 4 on LIV40877 Screening, in a year, the following quantity of material Lot 5 on LIV40877 (b) more than 100,000t but not more than 1,000,000t Lot 6 on LIV40877 Lot 159 on LN2465
- Page 2
Permit Environmental authority - EPML04041216 Additional information for applicants Environmentally relevant activities The description of any environmentally relevant activity (ERA) for which an environmental authority (EA) is issued is a restatement of the ERA as defined by legislation at the time the EA is issued. Where there is any inconsistency between that description of an ERA and the conditions stated by an EA as to the scale, intensity or manner of carrying out an ERA, the conditions prevail to the extent of the inconsistency. An EA authorises the carrying out of an ERA and does not authorise any environmental harm unless a condition stated by the EA specifically authorises environmental harm. A person carrying out an ERA must also be a registered suitable operator under the Environmental Protection Act 1994 (EP Act). Mobile and temporary activities If you operate a mobile and temporary environmentally relevant activity (ERA), other than regulated waste transport, you are required to maintain a work diary. You must: - keep the work diary records for 2 years after the last entry; - inform the administering authority within 7 days of the work diary being lost or stolen; - record the information required in the work diary for each location within 1 day of leaving the location. Contaminated land It is a requirement of the EP Act that an owner or occupier of land give written notice to the administering authority if they become aware of the following: - the presence of, or happening of an event involving, a hazardous contaminant on the land that is causing, or is reasonably likely to cause, serious or material environmental harm (notice must be given within 24 hours); or - if the land is contaminated land - a change in the condition of the land that is causing, or is reasonably likely to cause, serious or material environmental harm (notice must be given within 24 hours); or - a notifiable activity (as defined in Schedule 3) having been carried out, or is being carried out, on the land (notice must be given within 20 business days). For further information, including the form for giving written notice, refer to the Queensland Government website www.qld.gov.au, using the search term `duty to notify'. Take effect Please note that, in accordance with section 200 of the EP Act, an EA has effect: a) if the authority is for a prescribed ERA and it states that it takes effect on the day nominated by the holder of the authority in a written notice given to the administering authority - on the nominated day; or b) if the authority states a day or an event for it to take effect - on the stated day or when the stated event happens; or c) otherwise - on the day the authority is issued. However, if the EA is authorising an activity that requires an additional authorisation (a relevant tenure for a resource activity, a development permit under the Planning Act 2016 or an SDA Approval under the State Development and Public Works Organisation Act 1971), this EA will not take effect until the additional authorisation has taken effect. If this EA takes effect when the additional authorisation takes effect, you must provide the administering authority written notice within 5 business days of receiving notification of the related additional authorisation taking effect. The anniversary day of this environmental authority is the same day each year as the effective date. The payment of the annual fee will be due each year on this day. An annual return will be due each year on 01 April.
- Page 3
Permit Environmental authority - EPML04041216 If you have incorrectly claimed that an additional authorisation is not required, carrying out the ERA without the additional authorisation is not legal and could result in your prosecution for providing false or misleading information or operating without a valid environmental authority. Signature 23/01/2026 Sarah de Vries Date Innovation Enquiries: Delegate of the administering authority Minerals Business Centre Environmental Protection Act 1994 PO Box 7230 CAIRNS QLD 4870 Phone: 07 4222 5352 Email: ESCairns@detsi.qld.gov.au
- Page 4
Permit Environmental authority - EPML04041216 Obligations under the Environmental Protection Act 1994 In addition to the requirements found in the conditions of this environmental authority, the holder must also meet their obligations under the EP Act, and the regulations made under the EP Act. For example, the holder must comply with the following provisions of the Act: - general environmental duty (section 319) - duty to notify environmental harm (section 320-320G) - offence of causing serious or material environmental harm (sections 437-439) - offence of causing environmental nuisance (section 440) - offence of depositing prescribed water contaminants in waters and related matters (section 440ZG) - offence to place contaminant where environmental harm or nuisance may be caused (section 443). Other permits required This permit only provides an approval under the Environmental Protection Act 1994. In order to lawfully operate you may also require permits / approvals from your local government authority, other business units within the department, and other State and Federal Government agencies prior to commencing any activity at the site. For example, this may include permits / approvals with your local Council (for planning approval), the Department of Transport and Main Roads (to access State controlled roads), the Department of Natural Resources and Mines, Manufacturing, and Regional and Rural Development (to clear vegetation), and the Department of Primary Industries (to clear marine plants or to obtain a quarry material allocation). Obligations under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) Matters of national environmental significance (MNES) are regulated under the Commonwealth EPBC Act rather than under state legislation. You may need to submit a referral if your project potentially impacts any matters protected under the EPBC Act. For more information on self-assessments, and referral and assessment processes please visit the Department of Climate Change, Energy, the Environment and Water webpage, https://www.dcceew.gov.au/environment/epbc/advice. Obligations under the Mining and Quarrying Safety and Health Act 1999 If you are operating a quarry, other than a sand and gravel quarry where there is no crushing capability, you will be required to comply with the Mining and Quarrying Safety and Health Act 1999. For more information on your obligations under this legislation contact Mine Safety and Health at https://www.nrmmrrd.qld.gov.au/, or phone 13 QGOV (13 74 68) or your local Mines Inspectorate Office. Development Approval This permit is not a development approval under the Planning Act 2016. The conditions of this environmental authority are separate, and in addition to, any conditions that may be on the development approval. If a copy of this environmental authority is attached to a development approval, it is for information only, and may not be current. Please contact the the environmental authority relating to this site. Obligations under the Aboriginal Cultural Heritage Act 2003 and Torres Strait Islander Cultural Heritage Act 2003 (the Cultural Heritage Acts) The Cultural Heritage Acts require anyone who carries out a land-use activity to exercise a duty of care. This `duty of care' means land users must take all reasonable and practicable measures to ensure their activity does not harm Aboriginal or Torres Strait Islander cultural heritage, and applies to any activity where Aboriginal or Torres Strait Islander cultural heritage is located. For more information on your obligations under this legislation, please visit the Department of Women, Aboriginal and Torres Strait Islander Partnerships and Multiculturalism webpage at, https://www.dwatsipm.qld.gov.au/.
- Page 5
Permit Environmental authority - EPML04041216 Conditions of environmental authority The environmentally relevant activities conducted at the location as described above must be conducted in accordance with the following site specific conditions of approval. This environmental authority consists of the following Schedules: - Part 1 - Mining Activities: o Schedule A - General; o Schedule B - Air o Schedule C - Land o Schedule D - Noise o Schedule E - Groundwater o Schedule F - Waste o Schedule G - Water - Part 2 - Extractive and Screening Activities o Schedule H - General o Schedule I - Air o Schedule J - Land o Schedule K - Water o Schedule L - Noise o Schedule M - Social o Schedule N - Waste - Definitions - Attachments
- Page 6
Permit Environmental authority - EPML04041216 Part 1 - Mining Activities Schedule A - General Condition Condition number A1 Conditions contained in Part 1 -- Mining Activities of this environmental authority only apply to the mining activities conducted on ML7341, ML80102 and ML100349. A2 This environmental authority authorises environmental harm referred to in the conditions. Where there is no condition or this environmental authority is silent on a matter, the lack of a condition or silence does not authorise environmental harm. A3 In carrying out the relevant activity authorised by this environmental authority, the holder of this environmental authority must comply with the approved site plans (Figure 1 -- Approved site plans) and must not exceed the area of disturbance specified in Table A1 -- Areas of disturbance on site (in ha). A4 The holder of this environmental authority must: a) install all measures, plant and equipment necessary to ensure compliance with the conditions of this environmental authority; b) maintain such measures, plant and equipment in a proper and efficient condition; c) operate such measures, plant and equipment in a proper and efficient manner; and d) Ensure all instruments and devices used for the measurement or monitoring of any parameter under any condition of this environmental authority are properly calibrated. Table A1- Areas of disturbance on site (in ha) Domain Description Disturbance Domain Approximate Area (ha) 55.3 Total area of allotments under EA 31.4 16.8 Domains Active mining 1.7 0.6 Processing, set-down 50.5 Stormwater management Buildings, structures, fuel/oil store Total area of disturbance
- Page 7
Permit Environmental authority - EPML04041216 A5 Monitoring Except where specified by another condition of this environmental authority, all monitoring records or reports required by this environmental authority must be kept for a period of not less than five (5) years. A9 Risk management The holder of this environmental authority must develop and implement a risk management system for relevant activities which mirrors the content requirement of the Standard for Risk Management (IS031000:2009), or the latest edition of an Australian standard for risk management, to the extent relevant to environmental management, within ninety (90) business days of the environmental authority effective date. A10 Notification of emergencies, incidents and exceptions The holder of this environmental authority must notify the administering authority by written notification within twenty-four (24) hours, after becoming aware of any emergency, monitoring result or incident which results in the release of contaminants not in accordance, or reasonably expected to be not in accordance with, the conditions of this environmental authority. A11 Within ten (10) business days following the initial notification of an emergency or incident, or receipt of monitoring results, whichever is the latter, further written advice must be provided to the administering authority, including the following: a) results and interpretation of any samples taken and analysed; b) outcomes of actions taken at the time to prevent or minimise unlawful environmental harm; and c) proposed actions to prevent a recurrence of the emergency or incident. A12 Complaints The holder of this environmental authority must record all environmental complaints received about the relevant activities including: a) name, address and contact number for of the complainant; b) time and date of complaint; c) reasons for the complaint; d) investigations undertaken; e) conclusions formed; f) actions taken to resolve the complaint; g) any abatement measures implemented; and h) the person responsible for resolving the complaint. A13 The holder of this environmental authority must, when requested by the administering authority, undertake relevant specified monitoring within a reasonable timeframe nominated or agreed to by the administering authority to investigate any complaint of environmental harm. The results of the investigation (including an analysis and interpretation of the monitoring results) and abatement measures, where implemented, must be provided to the administering authority within ten (10) business days of completion of the investigation, or no later than 10 business days after the end of the timeframe nominated by the administering authority to undertake the investigation.
- Page 8
Permit Environmental authority - EPML04041216 A14 Third-party reporting The holder of this environmental authority must: a) within one (1) year of the commencement of this environmental authority, obtain from an appropriately qualified person a report on compliance with the conditions of this environmental authority; b) obtain further such reports at regular intervals, not exceeding three-yearly intervals, from the completion of the report referred to above; and c) provide each report to the administering authority within ninety (90) days of its completion. A15 Amendments to standards, policies or guidelines Where a condition of this environmental authority requires compliance with a standard, policy or guideline published externally to this environmental authority and the standard is amended or changed subsequent to the issue of this environmental authority, the holder of this environmental authority must: a) comply with the amended or changed standard, policy or guideline within two years of the amendment or change being made, unless a different period is specified in the amended standard or relevant legislation; and b) until compliance with the amended or changed standard, policy or guideline is achieved, continue to remain in compliance with the corresponding provision that was current immediately prior to the relevant amendment or change. A16 Scale and intensity of activity .The activity must be conducted in accordance with the following limits of scale and intensity: (a) the quantity of material mined under Schedule 3, ERA 20 must not exceed 1,000,000 tonnes in any one (1) year; and (b) the quantity of material extracted under Schedule 2, ERA 16 must not exceed 1,000,000 tonnes in any one (1) year; and (c) the combined quantity of material mined under Schedule 3, ERA 20 and extracted under Schedule 2, ERA 16 must not exceed 1,350,000 tonnes in any one (1) year.
- Page 9
Permit Environmental authority - EPML04041216 Schedule B - Air Condition Condition number B1 Dust and particulate matter monitoring The EA holder must ensure that the dust and particulate matter emissions generated by the relevant activities do not cause exceedances of the following levels when measured at any sensitive or commercial place: a) Dust deposition of 120 milligrams per square metre per day, averaged over one month, when monitored in accordance with the most recent version of Australian Standard AS3580.10.1 Methods for sampling and analysis of ambient air--Determination of particulate matter--Deposited matter -- Gravimetric method. b) A concentration of particulate matter with an aerodynamic diameter of less than 10 micrometres (PM 10) suspended in the atmosphere of 50 micrograms per cubic metre over a 24-hour averaging time, for no more than five exceedances recorded each year, when monitored in accordance with the most recent version of either: 1. Australian Standard AS3580.9.6 Methods for sampling and analysis of ambient air-- Determination of suspended particulate matter--PM10 high volume sampler with size selective inlet -- Gravimetric method, or 2. Australian Standard AS3580.9.9 Methods for sampling and analysis of ambient air-- Determination of suspended particulate matter--PM 10 low volume sampler-- Gravimetric method. c) A concentration of particulate matter suspended in the atmosphere of 90 micrograms per cubic metre over a 1 year averaging time, when monitored in accordance with the most recent version of AS/NZS3580.9.3:2003 Methods for sampling and analysis of ambient air--Determination of suspended particulate matter--Total suspended particulate matter (TSP)--High volume sampler gravimetric method. B2 The environmental authority holder must implement a dust management plan that ensures all reasonable and feasible avoidance and mitigation measures are employed so that dust and particulate emissions generated by the relevant activities do not migrate beyond the boundaries of mining leases ML7341, ML80102 & ML100349.
- Page 10
Permit Environmental authority - EPML04041216 Schedule C - Land Condition Condition number C1 Chemicals and flammable or combustible liquids All explosives, hazardous chemicals, corrosive substances, toxic substances, gases, dangerous goods and flammable and combustible liquids, including petroleum products, must be stored and handled in accordance with the current Australian standard. C2 The environmental authority holder must minimise the potential for contamination of land and waters by diverting uncontaminated stormwater around contaminated areas and facilities used for the storage of chemicals and flammable or combustible liquids. C6 Contaminated Land Before applying for surrender of a mining lease, the holder must (if applicable) provide to the administering authority a site investigation report under the Act, in relation to any part of the mining lease which has been used for notifiable activities or which the holder is aware is likely to be contaminated land, and also carry out any further work that is required as a result of that report to ensure that the land is suitable for its final land use. C7 The environmental authority holder must minimise the potential for contamination of land by hazardous contaminants. C8 Impacts to Prescribed Environmental Matters Significant residual impacts to prescribed environmental matters are not authorised under this environmental authority or the Environmental Offsets Act 2014 unless the impact(s) is specified in Table C1 - Significant residual impacts to prescribed environmental matters. Table C1- Significant residual impacts to prescribed environmental matters Prescribed Environmental Location of Impact Maximum Extent of Impact Matter Regulated vegetation within N/A 0 ha (buffer applied; no defined distance of disturbance permitted) watercourse (MSES - riparian) C9 Records demonstrating that no significant residual impact has occurred to any prescribed environmental matter(s) must: (a) be completed by an appropriately qualified person; and (b) kept for the life of the environmental authority.
- Page 11
Permit Environmental authority - EPML04041216 Schedule D - Noise Condition Condition number D1 Noise limits The holder of this environmental authority must ensure that noise generated by the mining activities does not cause the criteria in Table D1 -- Noise Limits to be exceeded at a sensitive place or commercial place. Table D1 - Noise Limits Monday to Saturday Sundays and Public Holidays Noise level 7am to 6pm to 10pm 9am to 6pm to 10pm to dB(A) 6pm 10pm to 7am 6pm 10pm 9am measured as: Noise Measured at the nearest sensitive place LAeq, adj, 15 CV = 50 AV CV = 45 CV = 40 CV = 45 CV = 40 CV = 35 AV mins =5 AV = 5 AV = 0 =0 AV = 5 AV = 5 LA1, adj, 15 CV = 55 CV = 50 CV = 45 CV = 50 CV = 45 AV CV = 40 AV mins AV = 10 AV = 10 AV = 10 AV = 5 = 10 =5 Noise Measured at the nearest commercial place LAeq, adj, 15 CV = 55 AV CV = 50 CV = 45 CV = 50 CV = 45 AV CV = 40 mins = 10 AV = 10 AV = 5 AV = 10 = 10 AV = 5 Table D1 - Noise limits notes: 1 CV = Critical Value 2 AV = Adjustment Value 3 To calculate noise limits in Table D1: i. If bg (CV - AV): Noise limit = bg + AV ii. If (CV - AV) < bg CV: Noise limit = CV iii. If bg > CV: Noise limit = bg + 0 4 In the event that measured bg (LA90, adj, 15 mins) is less than 30 dB(A), then 30 dB(A) can be substituted for the measured background level 5 bg = background noise level (LA90, adj, 15 mins) measured over 3-5 days at the nearest sensitive receptor 6 If the project is unable to meet the noise limits as calculated above alternative limits may be calculated using the processes outlined in the "Planning for Noise Control" guideline.
- Page 12
Permit Environmental authority - EPML04041216 D2 Monitoring and reporting Noise monitoring and recording must include the following descriptor characteristics and matters: a) LAN, T (where N equals the statistical levels of 1, 10 and 90 and T = 15 mins); b) background noise LA90; c) the level and frequency of occurrence of impulsive or tonal noise and any adjustment and penalties to statistical levels; d) atmospheric conditions including temperature, relative humidity and wind speed and directions; e) effects due to any extraneous factors such as traffic noise; f) location, date and time of monitoring; and g) if the complaint concerns low frequency noise, Max LpLlN,T and one third octave band measurements in dB(LlN) for centre frequencies in the 10 -- 200 1-IZ range. D3 Restrictions The environmental authority holder is not permitted to undertake explosive blasting on the site.
- Page 13
Permit Environmental authority - EPML04041216 Schedule E - Groundwater Condition Condition number E1 No Release to groundwaters The holder of this environmental authority must not release contaminants to groundwater. E2 The environmental authority holder must develop a Groundwater Management Plan (GMP) sufficient to prevent any impacts to groundwater. Schedule F - Waste Condition Condition number F1 Waste All waste generated in carrying out the activities permitted on this environmental authority must be reused, recycled or lawfully disposed of offsite.
- Page 14
Permit Environmental authority - EPML04041216 Schedule G - Water Condition Condition number G1 Stormwater and water sediment controls An Erosion and Sediment Control Plan (ESCP) must be developed by a Certified Professional in Erosion and Sediment Control' and implemented by the environmental authority holder. The ESCP must be submitted to the administering authority by 9 November 2016. Note: For all stages of the mining activities on the site, the ESCP must minimise erosion and the release of sediment to receiving waters and contamination of stormwater. G2 The stormwater runoff from disturbed areas, generated by (up to and including) a 24 hour storm event with an average recurrence interval of 1 in 5 years must be retained on site or managed to remove contaminants before release. G3 The method of water sampling required by this environmental authority must comply with that set out in the latest edition of the administering authority's Water Quality Sampling Manual. G4 Contaminants released from site Contaminants released from site must not exceed the limits defined in Table G3 - Contaminant release point and receiving waters limits when released from the points prescribed in Table G1 -- Release points for contaminants released from site. Note: A figure depicting release point locations is to be provided with the ESCP submitted in accordance with condition G1. G5 Contaminants released to receiving waters Contaminants released to receiving waters must not exceed the limits defined in Table G3 Contaminant release points and receiving waters limits when monitored at the points prescribed in Table G2 -- Receiving waters monitoring points. G6 During a release event parameters specified in Table G3 - Contaminated water release point and receiving waters limits must be monitored at the locations and frequencies specified in Table G1 -- Release points for contaminant released from site and Table G2 - Receiving waters monitoring points, and illustrated in Figure 2 - Release points and monitoring points. Note: A figure depicting monitoring point locations is to be provided with the ESCP submitted in accordance with condition G1.
- Page 15
Permit Environmental authority - EPML04041216 G7 If any parameter monitored at the locations specified in Table G1 -- Release points for contaminants released from site and Table G2 - Receiving waters monitoring points exceed the limits specified in Table G3 - Contaminant release points and receiving waters limits, the environmental authority holder must compare the downstream monitoring results to the upstream monitoring results, and: 1. If the downstream monitoring result is less than or equal to the upstream monitoring result and the receiving water limit, then no action is to be taken; 2. If the downstream monitoring result is greater than the receiving water limit, complete an investigation into the exceedances and the potential for environmental harm and provide a written report to the administering authority within 28 days of receiving the result, including: a) monitoring data required by conditions G1 and G2; b) details of the investigations into environmental harm; c) recommendations to prevent the exceedance of release limits and/or receiving waters limits; and d) actions taken to prevent environmental harm. Table G1 -- Release points for contaminants released from site. Release Longitude TBA Latitude Contaminated water Monitoring Monitoring point frequency point (RP) TBA source and location At release RP11 150.3410091 -23.5005921 Detention basin1 point during release event RP21 150.344261 -23.498641 Detention basin1 At release Within 2 RP31 150.347361 -23.500251 Stormwater dam1 point hours of a during release then daily event during a release At release point during release event At release RP41 150.348951 -23.504741 Stormwater dam1 point during release event Table G1 -- Release points for contaminants released from site notes: 1. Release point locations and details must be provided with the ESCP which must be submitted to the administering authority in accordance with condition G1.
- Page 16
Permit Environmental authority - EPML04041216 Table G2 -- Receiving waters monitoring points. Monitoring points Longitude Latitude Receiving waters location Monitoring description frequency Upstream reference monitoring points MP11 150.349131 -23.506091 200m upstream of the RP4 Within 2 hours confluence with unnamed of a release, creek and upstream of all then daily during influences.1 a release Downstream compliance monitoring points MP21 150.3498951 -23.5032841 130m downstream of RP4 Within 2 hours MP41 150.3464021 -23.4959261 confluence with unnamed of a release, creek.1 then daily during MP61 150.346131 90m downstream of RP2 a release confluence with unnamed creek.1 -23.490711 150m downstream of RP1 confluence with unnamed creek.1 Control monitoring points MP31 150.3468651 -23.4969731 15m downstream of RP2 Within 2 hours MP51 150.346051 -23.49261 confluence with unnamed of a release, creek.1 then daily during 120m downstream of RP1 a confluence with unnamed release creek.1 Table G2 -- Receiving waters monitoring points notes: 1. Release point locations and details must be provided with the ESCP which must be submitted to the administering authority in accordance with condition G1. Table G3 -- Contaminant release points and receiving waters limits Monitoring Parameter Release point limit Receiving waters limits Suspended solids (TSS) mg/L 504 851 Electrical conductivity (EC) -S/cm 2501,5 4451,2 pH 6.5 - 8.51 6.5 - 8.51 TBA3 TBA3 TBA3 Table G3 -- Contaminant release points and receiving waters limits notes: 1. Based on values for aquatic ecosystem protection, moderately disturbed ecosystems, derived from the Fitzroy River Sub- basin fresh waters, Table 2, Environmental Protection (Water) Policy 2009, Fitzroy River Sub-basin Environmental Values and Water Quality Objectives Basin No. 130 (part), including all waters of the Fitzroy River Sub-basin September 2011. 2. Base flow electrical conductivity value from the Fitzroy River Sub-basin fresh waters, Table 2, Environmental Protection (Water) Policy 2009, Fitzroy River Sub-basin Environmental Values and Water Quality Objectives Basin No. 130 (part), including all waters of the Fitzroy River Sub-basin September 2011.
- Page 17
Permit Environmental authority - EPML04041216 3. Any other water quality parameters that have the potential to exceed the receiving water quality objectives must be provided to the administering authority within 3 months of the environmental authority effective date. The parameters must be based on monitoring data of water storages that release to the receiving environment. 4. Based on values derived from the Best Practice Erosion and Sediment Control (BPESC) document. 5. High flow electrical conductivity value from the Fitzroy River Sub-basin fresh waters, Table 2, Environmental Protection (Water) Policy 2009, Fitzroy River Sub-basin Environmental Values and Water Quality Objectives Basin No. 130 (part), includes all waters of the Fitzroy River Sub-basin September 2011. END OF PART 1
- Page 18
Permit Environmental authority - EPML04041216 Part 2 - Extractive and Screening Activities Schedule H - General Condition Condition number H1 Conditions contained in Part 2 -- Extractive Activities of this environmental authority only apply to the extractive activities conducted on the approved land. H2 Scale and intensity of activity The activity must be conducted in accordance with the following limits of scale and intensity: (a) the quantity of material mined under Schedule 3, ERA 20 must not exceed 1,000,000 tonnes in any one (1) year; and (b) the quantity of material extracted under Schedule 2, ERA 16 must not exceed 1,000,000 tonnes in any one (1) year; and (c) the combined quantity of material mined under Schedule 3, ERA 20 and extracted under Schedule 2, ERA 16 must not exceed 1,350,000 tonnes in any one (1) year. H4 Approved plans The environmental authority is approved in accordance with the plan in Figure 1 - Approved site plans. H6 Prevent and/or minimise likelihood of environmental harm A person carrying out an environmentally relevant activity (ERA) to which this approval relates, must take all reasonable and practicable measures to prevent and/or to minimise the likelihood of environmental harm being caused. H7 A copy of this environmental authority must be kept in a location readily accessible to personnel carrying out the activity. H8 Record keeping The operator of an ERA authorised by this environmental authority must record, compile and keep all data required by this approval. These data must be made available to the administering authority upon request. H9 All records required by this approval must be kept for a minimum of five (5) years. H10 Notification Any emergency, incident or event, which results in the release of contaminants not in accordance with, or reasonably expected to be in accordance with the conditions of this approval, must be reported by telephone to the administering authorities' Pollution Hotline2 or the district office located in the area where the release occurred. Any such release must be reported as soon as the holder of the environmental authority becomes aware of the emergency incident or event. 2At the time of issuing this permit the number for the Pollution Hotline was 1300 130 372. This number may change at any time in the future and should be checked prior to use.
- Page 19
Permit Environmental authority - EPML04041216 H11 Information to follow notification A written notice detailing the following information must be provided to the administering authority within seven (7) days of any advice provided in accordance with condition H10: a) The name of the operator, including their approval/registration number; b) The name and tele hone number of a designated contact person; c) The quantity and nature of the substance released; d) Vehicle and registration details; e) The names of person/s involved in the release and/or cleanup; f) The location and time of the release; g) The suspected cause of the release; h) A description of the effects of the release; i) Details of the area of impact; j) The results of any sampling performed in relation to the release; k) Actions taken to mitigate any environmental harm caused by the release and details of the success of these actions; and l) Proposed actions to prevent a recurrence of the release. H12 Alterations No change, replacement or operation of any plant or equipment is permitted if the change, replacement or operation of plant or equipment increases, or is likely to substantially increase the risk of environmental harm above that expressly provided by this environmental authority. H13 Spill Kits An appropriate spill kit must be kept on site. H14 Anyone operating under this environmental authority must be trained in the use of the spill kit.
- Page 20
Permit Environmental authority - EPML04041216 Schedule I - Air Condition Condition number I1 Odour Nuisance The release of noxious or offensive odours or any other noxious or offensive airborne contaminants resulting from the activity must not cause a nuisance at any nuisance sensitive place. I2 Dust Nuisance The release of dust and/or particulate matter resulting from the activity must not cause an environmental nuisance at any nuisance sensitive place. I3 Dust suppression measure must be implemented and maintained on site to prevent the movement of dust created as a result of the activity past the site boundaries. I4 Dust emissions from stockpiles of material are to be controlled by reasonable and practicable methods such as the following; a) Water sprays; and b) Covers i.e. artificial covers such as tarpaulins or vegetation matter to prevent emissions. I5 Release of dust or particulate, exceeding the following levels, when measured at any nuisance sensitive place, is considered as an environmental nuisance: a) Dust deposition of 4.0 grams per square meter per month, when measured in accordance with Australian Standard AS 3580.10:2003 Methods of sampling and analysis of ambient air -- Determination of particulate matter -- Deposited matter -- Gravimetric method (or more recent edition); or b) A concentration of particulate matter with an aerodynamic diameter of less than 10 micrometres (PM10) suspended in the atmosphere of 50 micrograms per cubic metre over a 24 hour averaging period, at a nuisance sensitive place downwind of the site, when monitored in accordance with Australian Standard AS 3580 9.6 'Ambient Air -- Particulate Matter -- Determination of suspended particulate PM10 high volume sampler with size -- selective inlet -- gravimetric method'; or an alternative method of monitoring PM10 that may be permitted by the Air Quality Sampling Manual as published periodically by the administering authority. I6 When requested by the administering authority, dust and particulate monitoring must be undertaken within a reasonable timeframe nominated by the administering authority, to investigate any complaint of environmental nuisance caused by dust and/or particulate matter. The results of the monitoring must be notified to the administering authority within seven (7) days following completion of the monitoring. Monitoring must be carried out at a place(s) relevant to the potentially affected nuisance sensitive place and at upwind control sites and must include: a) For a complaint alleging dust nuisance, dust deposition; b) For a complaint alleging adverse health effects caused by dust, the concentration per cubic metre of particulate matter with an aerodynamic diameter of less than 10 micrometres (-m) (PM10) suspended in the atmosphere over a 24hr averaging time.
- Page 21
Permit Environmental authority - EPML04041216 Schedule J - Land Condition Condition number J1 Topsoil can be removed from site and utilised elsewhere. J2 Protecting land from contaminants Activities on site must be conducted in a way that prevents any potential or actual release of contaminants to land. J3 There are to be no fuels or oils stored on site for use with the extractive activity. Extraction equipment must only be refuelled by transporting fuel on site. Schedule K - Water Condition Condition number K1 Erosion protection measures and sediment control measures must be implemented and maintained to minimise: a) Erosion of soils in areas disturbed by the activity; and b) The release of sediment to any waters. Erosion protection and sediment control measures may include: a) Suitable banks; b) Structures; and c) Diversion drains. K2 All waters flowing over disturbed areas including but not limited to the extraction area and storage areas, must be diverted to an onsite sediment basin. K3 Sediment basins must be constructed and maintained: a) So as to minimise the likelihood of any release of contaminants or wastes through the bed or banks of the structure to any waters (including groundwater); b) So that a freeboard of not less than 0.5 meters is maintained at all times, except in the event of exceptional weather conditions where the maintenance of such is impossible. K4 Contaminants must not be directly or indirectly released to any waters, including groundwater, or the bed or banks of any waters. K5 Stormwater management Suitable banks and/or diversion drains must be installed and maintained so that all stormwater originating from land up-gradient of disturbed areas, including extraction and storage areas is diverted away from entering these areas and any ponds or other structures used for the storage or treatment of contaminants. K6 Contaminants other than settled/treated stormwater runoff water must not be released to surface waters or the bed or banks of any watercourse.
- Page 22
Permit Environmental authority - EPML04041216 Schedule L - Noise Condition Condition number L1 Nuisance Noise resulting from the activity must not cause an environmental nuisance at any sensitive place. L2 Noise from the activity must not result in levels greater than those specified in Table L1 -- Noise Limits at any noise sensitive place or commercial place. Table L1 - Noise Limits Monday to Saturday Sundays and Public Holidays Noise level 7am to 6pm to 10pm 9am to 6pm to 10pm to dB(A) 6pm 10pm to 7am 6pm 10pm 9am measured as: Noise Measured at the nearest sensitive place LAeq, adj, 15 CV = 50 AV CV = 45 CV = 40 CV = 45 CV = 40 CV = 35 AV mins =5 AV = 5 AV = 0 =0 AV = 5 AV = 5 LA1, adj, 15 CV = 55 CV = 50 CV = 45 CV = 50 CV = 45 AV CV = 40 AV mins AV = 10 AV = 10 AV = 10 AV = 5 = 10 =5 Noise Measured at the nearest commercial place LAeq, adj, 15 CV = 55 AV CV = 50 CV = 45 CV = 50 CV = 45 AV CV = 40 mins = 10 AV = 10 AV = 5 AV = 10 = 10 AV = 5 Table D1 - Noise limits notes: 7 CV = Critical Value 8 AV = Adjustment Value 9 To calculate noise limits in Table D1: iv. If bg (CV - AV): Noise limit = bg + AV v. If (CV - AV) < bg CV: Noise limit = CV vi. If bg > CV: Noise limit = bg + 0 10 In the event that measured bg (LA90, adj, 15 mins) is less than 30 dB(A), then 30 dB(A) can be substituted for the measured background level 11 bg = background noise level (LA90, adj, 15 mins) measured over 3-5 days at the nearest sensitive receptor 12 If the project is unable to meet the noise limits as calculated above alternative limits may be calculated using the processes outlined in the "Planning for Noise Control" guideline.
- Page 23
L2A Permit Environmental authority - EPML04041216 Monitoring and reporting Noise monitoring and recording must include the following descriptor characteristics and matters: a) LAN, T (where N equals the statistical levels of 1, 10 and 90 and T = 15 mins); b) background noise LA90; h) the level and frequency of occurrence of impulsive or tonal noise and any adjustment and penalties to statistical levels; i) atmospheric conditions including temperature, relative humidity and wind speed and directions; j) effects due to any extraneous factors such as traffic noise; k) location, date and time of monitoring; and l) if the complaint concerns low frequency noise, Max LpLlN,T and one third octave band measurements in dB(LlN) for centre frequencies in the 10 -- 200 1-IZ range. L3 When requested by the administering authority, noise monitoring must be undertaken within a reasonable timeframe nominated by the administering authority, to investigate any complaint of environmental nuisance caused by noise. The results of the monitoring must be notified to the administering authority within seven (7) days following completion of the monitoring. L4 The method of measurement and reporting of noise levels in response to any noise monitoring conducted under this approval must be in accordance with the most recent edition of the administering authority's Noise Measurement Manual.
- Page 24
Permit Environmental authority - EPML04041216 Schedule M - Social Condition Condition number M1 Complaint response The holder of the environmental authority must record the following details for all complaints received and provide this information to the administering authority on request: a) Time, date, name and contact details of the complainant; b) The allegation made by the complainant; c) Details of communications with the complainant; d) Any investigations undertaken; and e) Conclusions formed and any actions taken. M2 The holder of the environmental authority must attempt to make contact with any complainant within 24 hours of a complaint being received and initiate complaint resolution measures. Schedule N - Waste Condition Condition number N1 All waste (not including overburden) generated in carrying out the activity must be disposed of at a facility that can lawfully accept that waste. No waste is to be disposed of on site. N2 Waste, including vegetation matter, must not be burnt on site. N3 Any spillage of wastes, contaminants or other materials must be cleaned up as quickly as practicable. Such spillages must not be cleaned up by hosing, sweeping or otherwise releasing such wastes, contaminants or material to any waters. END OF PART 2
- Page 25
Permit Environmental authority - EPML04041216 Definitions Words and phrases used throughout this environmental authority are defined below. Where a definition for a term used in this environmental authority is not provided within this environmental authority but is provided in the Environmental Protection Act 1994 or subordinate legislation, the definition in the EP Act or subordinate legislation must be used. 'activity' means an environmentally relevant activity or associated auxiliary activity to which this approval relates. 'Administering Authority' is the agency that administers the environmental authority provisions under the Environmental Protection Act 1994. 'appropriately qualified person' means a person who has professional qualifications, training, skills or experience relevant to the nominated subject matter and can give authoritative assessment, advice and analysis on performance relating to the subject matter using the relevant protocols, standards, methods or literature. `background', with reference to the water schedule means the average of samples taken prior to the commencement of mining from the same waterway that the current sample has been taken. 'blasting' means the use of explosive materials to fracture: a) rock, coal and other minerals for later recovery, or b) structural components or other items to facilitate removal from a site or for reuse. 'bund' means: a) an earth mound or similar structure (e.g. a concrete block wall), whether impervious or not, constructed to contain spilled material (e.g. petrol, diesel, oil, etc.); or b) a structure to prevent or reduce soil erosion. 'certified', with respect to watercourse diversions, means assessed and approved by a suitably qualified and experienced person. In relation to 'as constructed' drawings and specifications, the certification must be by the suitably qualified person who supervised the construction of the watercourse diversion, or reestablishment of the watercourse. 'certification', 'certifying' or 'certified' by an appropriately qualified and experienced person in relation to a design plan or an annual report regarding dams/structures, means that a statutory declaration has been made by that person and, when taken together with any attached or appended documents referenced in that declaration, all of the following aspects are addressed and are sufficient to allow an independent audit at any time: a) exactly what is being certified and the precise nature of that certification b) the relevant legislative, regulatory and technical criteria on which the certification has been based c) the relevant data and facts on which the certification has been based, the source of that material, and the efforts made to obtain all relevant data and facts d) the reasoning on which the certification has been based using the relevant data and facts, and the relevant criteria. 'Certified Professional in Erosion and Sediment Control', a CPESC is a recognised specialist in soil erosion and sediment control. CPESCs have approved educational training, demonstrated expertise, experience in controlling erosion and sedimentation, and meet certification standards. 'Chemical' means: a) an agricultural chemical product or veterinary chemical product within the meaning of the Agricultural and Veterinary Chemicals Code Act 1994 (Commonwealth), or b) a dangerous good under the Australian Code for the Transport of Dangerous Goods by Road and Rail approved by the Australian Transport Council, or c) a lead hazardous substance within the meaning of the Workplace Health and Safety Regulation 1997, or d) a drug or poison in the Standard for the Uniform Scheduling of Drugs and Poisons prepared by the e) Australian Health Ministers' Advisory Council and published by the Commonwealth, or
- Page 26
Permit Environmental authority - EPML04041216 f) any substance used as, or intended for use as: i. a pesticide, insecticide, fungicide, herbicide, rodenticide, nematocide, miticide, fumigant or related product, or ii. a surface active agent, including, for example, soap or related detergent, or iii. a paint solvent, pigment, dye, printing ink, industrial polish, adhesive, sealant, food additive, bleach, sanitiser, disinfectant, or biocide, or iv. a fertiliser for agricultural, horticultural or garden use, or v. a substance used for, or intended for use for mineral processing or treatment of metal, pulp and paper, textile, timber, water or wastewater, or vi. manufacture of plastic or synthetic rubber. 'commercial place' means a workplace used as an office or for business or commercial purposes, which is not part of the mining activity and does not include employees' accommodation or public roads. 'contaminant', A contaminant can be-- a) a gas, liquid or solid; or b) an odour; or c) an organism (whether alive or dead), including a virus; or d) energy, including noise, heat, radioactivity and electromagnetic radiation; or e) a combination of contaminants. 'contamination', of the environment is the release (whether by act of omission) of a contaminant into the environment. 'deposit' means to drop, place or throw a contaminant in waters or onto a place or releases the contaminant or otherwise cause it to move into waters or onto a place. 'disturbance' of land includes: a) compacting, removing, covering, exposing or stockpiling of earth b) removal or destruction of vegetation or topsoil or both to an extent where the land has been made susceptible to erosion c) carrying out mining within a watercourse, waterway, wetland or lake d) the submersion of areas by tailings or hazardous contaminant storage and dam/structure walls e) temporary infrastructure, including any infrastructure (roads, tracks, bridges, culverts, dam/structures, bores, buildings, fixed machinery, hardstand areas, airstrips, helipads etc) which is to be removed after the mining activity has ceased f) releasing of contaminants into the soil, or underlying geological strata. However, the following areas are not included when calculating areas of 'disturbance': a) areas off lease (e.g. roads or tracks which provide access to the mining lease) b) areas previously disturbed which have achieved the rehabilitation outcomes c) by agreement with the administering authority, areas previously disturbed which have not achieved the rehabilitation objective(s) due to circumstances beyond the control of the mine operator (such as climatic conditions) d) areas under permanent infrastructure. Permanent infrastructure includes any infrastructure (roads, tracks, bridges, culverts, dam/structures, bores, buildings, fixed machinery, hardstand areas, airstrips, helipads etc) which is to be left by agreement with the landowner e) disturbance that pre-existed the grant of the tenure.
- Page 27
Permit Environmental authority - EPML04041216 'effective dust control system' means a method, process, procedure or course of action that if taken, will minimise the likelihood of environmental nuisance being caused. 'environmental authority', an environmental authority issued under section 195 that approves an environmentally relevant activity applied for in an application. 'environmental authority holder', means the holder of an environmental authority issued under section 195 that approves an environmentally relevant activity applied for in an application and any others works conducted by an entity on the approved leases under the environmental authority. 'environmental nuisance' as defined in section 15 of the EP Act. 'groundwater monitoring program', means the holder of the environmental authority must appropriately monitor the potential impacts to groundwater and develop a suitable plan or program that achieves this requirement. 'holder', for a mining tenement, means a holder of the tenement under the Mineral Resources Act 1989, and the holder of the associated environmental authority under the Environmental Protection Act 1994. 'infrastructure' means water storage dams, levees,, roads and tracks, buildings and other structures built for the purpose of the mining activity. 'land' in the 'land schedule' of this document means land excluding waters and the atmosphere, that is, the term has a different meaning from the term as defined in the Environmental Protection Act 1994. For the purposes of the Acts Interpretation Act 1954, it is expressly noted that the term 'land' in this environmental authority relates to physical land and not to interests in land. 'land use' --means the selected post mining use of the land, which is planned to occur after the cessation of mining operations. 'm' means metres. 'measures' includes any measures to prevent or minimise environmental impacts of the mining activity such as bunds, silt fences, diversion drains, capping, and containment systems. 'minimise' is to reduce to the smallest possible amount or degree. 'mining activities' is an activity that is an authorised activity for a mining tenement under the Mineral Resources Act 1989. For the purpose of this EA it refers to ERA 20(b) - Dimension stone mining, involving mining a quantity of material of at least 100,000t but not more than 1,000,000t in a year. 'non-polluting' means having no adverse impacts upon the receiving environment. 'offensive' means causing offence or displeasure; is disagreeable to the sense; disgusting; nauseous or repulsive. 'protected area' means -- a protected area under the Nature Conservation Act 1992, or a) a marine park under the Marine Parks Act 1992, or b) a World Heritage Area. 'receiving environment' in relation to an activity that causes or may cause environmental harm, means the part of the environment to which the harm is, or may be, caused. The receiving environment includes (but is not limited to): c) a watercourse d) groundwater 'receiving waters' means the waters into which this environmental authority authorises releases of mine affected water. 'rehabilitation' the process of reshaping and revegetating land to restore it to a stable landform. 'release' of a contaminant includes: a) to deposit, discharge, emit or disturb the contaminant; and b) to cause or allow the contaminant to be deposited, discharge, emitted or disturbed; and c) to allow the contaminant to escape; and
- Page 28
Permit Environmental authority - EPML04041216 d) to fail to prevent the contaminant from escaping. 'revegetation' is the re-establishment of vegetation1 of a species and density of cover similar to surrounding undisturbed areas or the landform that existed before mining activities on soil surfaces associated with the construction or rehabilitation of a watercourse diversion. Note 1: Not including a species declared under the Land Protection (Pest and Stock Route Management) Regulation 2003 as a category class 1 pest, category class 2 pest or category class 3 pest. 'self-sustaining' means not requiring on-going intervention and maintenance to maintain functional riverine processes and characteristics 'sensitive place' means: a) a dwelling, residential allotment, mobile home or caravan park, residential marina or other residential premises, or b) a motel, hotel or hostel, or c) an educational institution, or d) a medical centre or hospital, or e) a protected area under the Nature Conservation Act 1992, the Marine Parks Act 1992 or a World f) Heritage Area, or g) a public park or gardens. Note: The definition of 'sensitive place' and 'commercial place' is based on Schedule 1 of EPP Noise. That is, a sensitive place is inside or outside on a dwelling, library and educational institution, childcare or kindergarten, school or playground, hospital, surgery or other medical institution, commercial & retail activity, protected area or an area identified under a conservation plan under Nature Conservation Act 1992 as a critical habitat or an area of major interest, marine park under Marine Parks Act 2004, park or garden that is outside of the mining lease and open to the public for the use other than for sport or organised entertainment. A commercial place is inside or outside a commercial or retail activity. A mining camp (i.e., accommodation and ancillary facilities for mine employees or contractors or both, associated with the mine the subject of the environmental authority) is not a sensitive place for that mine or mining project, whether or not the mining camp is located within a mining tenement that is part of the mining project the subject of the environmental authority. For example, the mining camp might be located on neighbouring land owned or leased by the same company as one of the holders of the environmental authority for the mining project, or a related company. Accommodation for mine employees or contractors is a sensitive place if the land is held by a mining company or related company, and if occupation is restricted to the employees, contractors and their families for the particular mine or mines which are held by the same company or a related company. For example, a township (occupied by the mine employees, contractors and their families for multiple mines that are held by different companies) would be a sensitive place, even if part or all of the township is constructed on land owned by one or more of the companies. 'static screens' means any rock screen, rock separator, aggregate separator or similar devices that do not utilise any mechanical screening methods. 'suitably qualified and experienced person' means a person who is a Registered Professional Engineer of Queensland under the provisions of the Professional Engineers Act 2002, who has an appropriate level of expertise in the structures, geomechanics, hydrology, hydraulics and environmental impact of watercourse diversions. 1 An appropriate level of expertise includes: - demonstrable competency, experience and expertise in: o investigation, design or construction of watercourses diversions o operation and maintenance of watercourse diversions o geomechanics with particular emphasis on channel equilibrium, geology and geochemistry o hydrology with particular reference to flooding, estimation of extreme storms, water management or meteorology o hydraulics with particular reference to sediment transport and deposition and erosion control hydrogeology with particular reference to seepage and groundwater
- Page 29
Permit Environmental authority - EPML04041216 o solute transport processes and monitoring thereof, or - sufficient knowledge and experience to certify that where the suitably qualified and experienced person has relied on advice and information provided by other persons with relevant expertise*: o they consider it reasonable to rely on that advice and information o the expert providing the advice and information has knowledge, competency, suitable experience and demonstrated expertise in the matters related to watercourse diversions. Persons with relevant expertise include: - Geomorphologist: person who has demonstrated competency and relevant experience in stream geomorphology and watercourse diversions. - Geotechnical Expert: person who has demonstrated competency and relevant experience in geotechnical assessment of soil characteristics suitable for watercourse diversions. - Vegetation Expert: person who has demonstrated competency and relevant experience in the identification, role and function of vegetation with watercourses and adjoining floodplains, and has demonstrated competency and relevant experience in revegetation of watercourse diversions and adjoining floodplains. . - Groundwater Expert: person who has demonstrated competency and relevant experience in groundwater systems. - Surface Water Expert: person who has demonstrated competency and relevant experience in hydrology. - Engineer: person who is a Registered Professional Engineer of Queensland (RPEQ) under the provisions of the Professional Persons Act 2002 or has similar qualifications under a respected professional registration association, and has demonstrated competency and relevant experience in design and construction of watercourse diversions. - Soils Expert: person who has demonstrated competency and relevant experience in soil classification including the physical, chemical and hydrologic analysis of soil. 'the Act' means the Environmental Protection Act 1994. 'topsoil' means the surface layer of a soil profile, which is usually more fertile, darker in colour, better structured and supports greater biological activity than underlying layers. The surface layer may vary in depth depending on soil forming factors, including parent material, location and slope, but generally is not greater than about 300mm in depth from the natural surface. 'water' is defined under Schedule 4 of the Water Act 2000. 'watercourse' has the same meaning given in the Water Act 2000. 'water quality' means the chemical, physical and biological condition of water. 'waters' includes river, stream, lake, lagoon, pond, swamp, wetland, unconfined surface water, unconfined natural or artificial watercourse, bed and bank of any waters, dams, non-tidal or tidal waters (including the sea), storm water channel, storm water drain, and groundwater and any part thereof.
- Page 30
Permit Environmental authority - EPML04041216 Attachments Figure 1 - Approved site plans
- Page 31
Permit Environmental authority - EPML04041216 Figure 2 - Release points and monitoring points 1 All release and monitoring points are to be provided with the ESCP that must be submitted to the administering authority in accordance with condition H1. END OF ENVIRONMENTAL AUTHORITY