Minerals environmental authority

EPML00879413 · NQM GOLD 2 PTY LTD

Minerals environmental authority EPML00879413 (NQM GOLD 2 PTY LTD), Granted. 160 conditions indexed. No PRC plan.

Status
Granted
Holders
NQM GOLD 2 PTY LTD
Tenures
ML10215; ML10246; ML10370; ML1575
PRC plan
None
How it was read
Numbered conditions, partial, plus page text
Register
Register record · Instrument PDF

Conditions

160 numbered conditions read from the current instrument. Page numbers link into the register PDF.

  1. A1

    This environmental authority authorises environmental harm referred to in the conditions. Where there is no condition or this environmental authority is silent on a matter, the lack of a condition or silence does not authorise environmental harm.

  2. A2

    Contaminants with the potential to cause environmental harm must not be released directly or indirectly to the receiving environment, except as permitted under the conditions of this environmental authority.

  3. A3

    The environmental authority holder must ensure that the activity is carried out in accordance with Table A1 and Schedule J - Figure 1 - Location of authorised disturbance: Dams; Figure 2 - Location of authorised disturbance: Waste rock dumps, landfills, irrigation areas and run of mine areas; Figure 3 - Location of authorised disturbance: Processing, voids, mining areas and ancillary infrastructure; and Figure 4 - Location of authorised disturbance: Powerlines-substations, seismic lines and topsoil stockpiles. Table A1 - Authorised disturbance (`Table A1') Mine Mine Feature Name Location Maximum Domain (MGA94, Zone 55) disturbance Central Peg Coordinates area (ha) Tailings 440890 7730335 43.00 Storage Facility (TSF1) 441491 7729611 17.60 Tailings Storage Facility 2 (TSF2) Sump 1 (TSF2) 441718 7730185 0.01 Sump 2 (TSF2) 441488 7729963 0.01 Scott Lode Pit 442769 7730189 21.09 Dams Stormwater dam 440567 7730716 7.66 Madigan's dam 441708 7729948 2.66 A Lode dam 443221 7730489 1.09 Sam's dam 443375 7730601 2.49 SL WRD Sump 441866 7731252 0.33 Nancy dam 443508 7728461 0.35 Permit OFFICIAL Environmental Authority EPML00879413 Mine Mine Feature Name Location Maximum Domain (MGA94, Zone 55) disturbance Central Peg Coordinates area (ha) Vera dam 444109 7727491 Raw Water Dam 1.32 Cave Seep Pit 440986 7729985 1.02 Scott Lode WRD 441169 7730623 0.10 441932 7730645 29.76 Cindy WRD Vera WRD 443476 7729183 8.38 Janet A/K PAF WRD 3.73

    page 6Surface water, Regulated structures, Waste, Land and soil
  4. A4

    The holder of this environmental authority must: a) Install all measures, plant and equipment necessary to ensure compliance with the conditions of this environmental authority; b) Maintain such measures, plant and equipment in a proper and efficient condition; c) Operate such measures, plant and equipment in a proper and efficient manner; and d) Ensure all instruments and devices used for the measurement or monitoring of any parameter under any condition of this environmental authority are properly calibrated. Monitoring

    page 9Monitoring and reporting
  5. A5

    All monitoring data, records and reports required by this environmental authority or related to environmental management of the activities must be: a) Carried out by an appropriately qualified person, periodically reviewed and updated as required to reflect operational or environmental changes; b) Kept for a period of not less than five (5) years; c) Provided to the administering authority in the specified format within 10 business days of a request; and d) Undertaken in accordance with the most recent version of any applicable standard or guideline for the activity.

    page 9Monitoring and reporting
  6. A6

    The following information must be recorded in relation to all monitoring required under a condition of this Permit OFFICIAL Environmental Authority EPML00879413 environmental authority: a) The date and time when the sample was taken; b) The location where the sample was taken; and c) Any other pertinent details of relevance to interpreting the sampling results (i.e. stream flow, wind conditions or any unusual observations such as odour or colouration).

    page 9Air, Monitoring and reporting
  7. A7

    The environmental authority holder must implement all reasonable measures necessary to conduct monitoring required under a condition of this environmental authority. Note: `Reasonable measures' could include establishing and maintaining safe all-weather access to a monitoring location by upgrading roads/tracks, use of suitable automated sampling devices, developing alternative routes or utilising alternative transport. Financial assurance

    page 10Monitoring and reporting
  8. A8

    Financial assurance must be lodged with the administering authority in the amount, the form and within the time required by the administering authority. Risk management

  9. A9

    The holder of this environmental authority must develop and implement a risk management system for mining activities which mirrors the content requirement of the Standard for Risk Management (ISO31000:2009), or the latest edition of an Australian standard for risk management, to the extent relevant to environmental management, by 22 December 2016. Notification of emergencies, incidents and exceptions

    page 10Monitoring and reporting
  10. A10

    The environmental authority holder must notify the administering authority within 24 hours of becoming aware of any emergency, incident, sample result or event which does or may contravene a condition of this environmental authority.

    page 10Monitoring and reporting
  11. A11

    Within 10 business days following the initial notification of an emergency, event or incident, or receipt of monitoring results, whichever is the latter, further written advice must be provided to the administering authority, including the following: a) Results and interpretation of any samples taken and analysed; b) Outcomes of actions taken at the time to prevent or minimise unlawful environmental harm; and c) Proposed actions to prevent a recurrence of the emergency or incident. Complaints

    page 10Monitoring and reporting
  12. A12

    The holder of this environmental authority must record all environmental complaints received about the mining activities including: a) Name, address and contact number of the complainant; b) Time and date of complaint; c) Reasons for the complaint; d) Investigations undertaken; e) Conclusions formed; f) Actions taken to resolve the complaint; g) Any abatement measures implemented; and h) Person responsible for resolving the complaint. Permit OFFICIAL Environmental Authority EPML00879413

    page 10Monitoring and reporting
  13. A13

    When requested by the administering authority, the environmental authority holder must undertake specified monitoring within the timeframe nominated by the administering authority, to investigate any complaint related to the activity. Third-party reporting

    page 11Monitoring and reporting
  14. A14

    The holder of this environmental authority must: a) By 30 June 2017, obtain from an appropriately qualified person a report on compliance with the conditions of this environmental authority; b) Obtain further such reports at regular intervals, not exceeding three (3) yearly intervals, from the completion of the report referred to above; and c) Provide each report to the administering authority within 90 days of its completion. Exploration

    page 11Monitoring and reporting
  15. A15

    All exploration activities carried out on the mining leases must comply with each of the standard conditions contained in the most recent version of the administering authority's Eligibility Criteria and Standard is a discrepancy between the ERA Standard and this environmental authority, the conditions of the environmental authority apply. END OF CONDITIONS FOR SCHEDULE A Permit OFFICIAL Environmental Authority EPML00879413 Schedule B - Air

  16. C1

    All waste generated as part of the mining activities must be disposed of in a lawful manner at an off-site facility, with the exception of: a) Waste rock and tailings, which must be characterised, handled and disposed of in accordance with condition C5 of this environmental authority; b) Timber pallets; c) General waste deposited in the active waste disposal trench; d) Tyres, subject to condition C3. e) Concrete and foundation material, demolished building materials including veranda's and demountables, scrap steel and geological waste (core trays and unwanted core). Note: The only waste authorised to be burnt on site is explosive boxes and untreated timber pallets, for fire training purposes, so long as the burning does not cause environmental harm.

    page 13Waste
  17. C2

    General waste must only be disposed of into the waste disposal trench of ML1575 and ML10215 and identified in Schedule J - Figure 2 - Location of authorised disturbance: Waste rock dumps, landfills, irrigation areas and run of mine areas.

    page 13Waste
  18. C3

    Subject to demonstrating to the administering authority that no other use higher in the waste management hierarchy can be practicably implemented, waste tyres generated from mining activities may be disposed of on site in non acid producing waste rock dumps or underground stopes.

    page 13Waste
  19. C4

    Regulated waste awaiting removal may be temporarily stored on site awaiting removal provided it is stored to ensure there is minimal risk of causing fire or contamination to land or waters.

    page 13Waste
  20. C5

    All waste rock and tailings must be: a) Geochemically characterised and disposed of in a manner that minimises the potential generation and/or release of contaminants to the receiving environment; b) Where the geochemical characteristics of waste rock is uncertain, this material must be treated as potentially acid forming, saline mine drainage or neutral mine drainage forming until demonstrated otherwise; and c) Details pertaining to meeting the requirements of this condition must be recorded and retained until this environmental authority is surrendered.

    page 13Waste
  21. C6

    WAD cyanide concentrations in the tailings surface liquor must not exceed 50mg/L.

    page 13Waste
  22. C7

    The environmental authority holder must immediately commence cyanide destruction if WAD cyanide concentrations in the tailings surface liquor exceed 50mg/L.

    page 13Waste
  23. C8

    Any seepage from the temporary PAF waste rock dump from Janet A and K Dump must be directed to Scott Lode Pit.

    page 13Waste
  24. C9

    Any seepage from the temporary PAF waste rock dump Venue/VNU must be directed to the Venue/VNU pits.

    page 13Waste
  25. C10

    All waste rock characterised as potentially acid forming from Janet A pit, within K dump, within Anne pits and within Scott Lode waste rock dump must be returned to Scott Lode Pit, Janet A pit and Venue/VNU pit once the pits become available for rehabilitation. Permit OFFICIAL Environmental Authority EPML00879413

    page 13Rehabilitation, Waste
  26. C11

    All waste rock characterised as potentially acid forming from Nancy, Nancy North, Janine East, Janine Northwest, Orchid, Venue/ VNU pits, Lynne underground workings, Janine North, Janine Extension, Starlight B and Sue pits must be returned to Venue/VNU pit at the completion of the mining of these pits.

    page 14Waste
  27. C12

    Within two years of completion of mining at Starlight B and Janine Northwest pits, the pits must be backfilled with non-acid producing material from the same lithology.

  28. C13

    Within six months of completion of mining at Anne pits, the pits must be backfilled with non-acid producing material from the same lithology. Sewage Treatment

  29. C14

    Effluent from the sewage treatment plant must comply with the release limits stated in Table C1. Table C1 - Treated sewage effluent contaminant release limits (`Table C1') Contaminant Unit Release Release Limit type Frequency limit1 limit A Maximum Monthly 5 day Biochemical mg/L L30ode Dam2 oxygen demand (BOD)1 mg/L 20 Total suspended solids 30 100 Maximum Monthly Nitrogen mg/L 30 30 Maximum Monthly Phosphorus mg/L 15 30 Maximum Monthly E-coli Organisms/100ml 1000 1000 Maximum Monthly pH pH units 6.0 - 9.0. 5.5 - 9.0 Range Monthly 1. Measured at the end of pipe 2. Measured at the end of pipe when released to the A Lode Dam 3. Based on at least 5 but no more than 10 consecutive samples

    page 14Regulated structures
  30. C15

    Sewage effluent may only be released to the following locations: a) Within the nominated irrigation area identified in Table A1 or the A Lode Dam; or b) Other land for the purpose of dust suppression and/or fire fighting; or c) Reused as part of the mining activities.

    page 14Regulated structures, Air
  31. C16

    The application of sewage effluent must be carried out in a manner such that: a) Vegetation is not damaged; b) There is no surface ponding of effluent; c) There is no run-off or over spray of effluent.

    page 14Biodiversity
  32. C17

    Sewage effluent releases must be monitored at the frequency and for the parameters specified in Table C1.

    page 14Monitoring and reporting
  33. C18

    The daily volume of sewage effluent release must be measured and documented.

  34. C19

    When circumstances prevent the irrigation or beneficial reuse of treated sewage effluent such as during or following rain events, measures must be taken to store or lawfully dispose of effluent.

  35. C20

    Sewage effluent must only be supplied to another person or organisation that has a written plan detailing how the user of the treated sewage effluent will comply with their general environmental duty whilst using the treated sewage effluent. Permit OFFICIAL Environmental Authority EPML00879413 END OF CONDITIONS FOR SCHEDULE C Permit OFFICIAL Environmental Authority EPML00879413 Schedule D - Noise Noise limits

    page 14Noise and vibration
  36. D1

    The holder of this environmental authority must ensure that noise generated by the mining activities does not cause the criteria in Table D1 to be exceeded at a sensitive place or commercial place. Table D1 - Noise limits (`Table D1') Noise level Monday to Sundays and Public Holidays DB(A) 9am to 6pm 6pm to 10pm 10pm to 9am measured as: (Leq,adj,T (T BG1 + 5 or (40dB) BG1 + 5 or (35dB) BG1 + 3 or (33dB) = 15 minutes to 1 hour) dB(A)* 1. Background (BG) noise level minimum based on "E3 guideline for Noise and from Extractive Industries" for night time and evening. Airblast overpressure nuisance

    page 16Noise and vibration
  37. D2

    The holder of this environmental authority must ensure that blasting does not cause the limits for peak particle velocity and air blast overpressure in Table D2 to be exceeded at a sensitive place or commercial place. Table D2 - Blasting noise limits (`Table D2') Blasting noise Sensitive or commercial blasting noise limits place limits limits Monday to Friday 7am to Monday to Friday 6pm to Monday to Friday Air blast 6pm 7am 6pm to 7am overpressure Saturday, Sunday and Public Saturday, Sunday and Saturday, Sunday Holidays 9am - 6pm Public Holidays 6pm - and Public Holidays Open Cut Pits and 9am 6pm - 9am Underground Workings Open Cut Pits Underground Workings 115 dB (Linear) Peak for nine No Blasting 115 dB (Linear) Peak (9) out of ten (10) consecutive for nine (9) out of ten blasts initiated and not greater (10) consecutive blasts than 120 bB (Linear) Peak at initiated and not any time greater than 120 bB (Linear) Peak at any time Ground vibration 5mm/second peak particle 5mm/second peak peak particle velocity for nine (9) out of ten particle velocity for nine velocity (10) consecutive blasts and not greater than 10 mm/second (9) out of ten (10) peak particle velocity at any No Blasting consecutive blasts and time not greater than 10 mm/second peak particle velocity at any time Monitoring and reporting

    page 16Noise and vibration, Monitoring and reporting
  38. D3

    Noise monitoring and recording must include the following descriptor characteristics and matters: Permit OFFICIAL Environmental Authority EPML00879413 a) L (where N equals the statistical levels of 1, 10 and 90 and T = 15 mins) AN,T b) background noise LA90 c) the level and frequency of occurrence of impulsive or tonal noise and any adjustment and penalties to statistical levels d) atmospheric conditions including temperature, relative humidity and wind speed and directions e) effects due to any extraneous factors such as traffic noise f) location, date and time of monitoring g) if the complaint concerns low frequency noise, Max LpLIN,T and one third octave band measurements in dB(LIN) for centre frequencies in the 10 - 200 Hz range. Note: Noise and blast monitoring as required by the administering authority in accordance with Schedule A - condition A13 END OF CONDITIONS FOR SCHEDULE D Permit OFFICIAL Environmental Authority EPML00879413 Schedule E - Water Contaminant Release to Waters

    page 16Noise and vibration, Monitoring and reporting
  39. E1

    Contaminants that will, or have the potential to cause environmental harm must not be released directly or indirectly to any waters except as permitted under the conditions of this environmental authority.

  40. E2

    The release of contaminants to waters must only occur from the authorised release points in Table E1 (Contaminant Release Points) and must be monitored at the locations and frequency specified in Table E1 (Contaminant Release Points) for each quality characteristics specified in Table E3 (Contaminant Release Limit and Trigger Levels). Table E1 (Contaminant Release Points) Release Easting Northing Contaminant Source and Location, Monitoring Frequency Point (GDA94 (GDA94 and Description of Release Point Point MGA Zone MGA Zone daily during RP 1 Stormwater Dam Dam release (the RP 2 55) 55) Cindy Dam Spillway first sample RP 3 440690 7730890 Madigans Dam Dam must be RP 4 Vera Sump Spillway taken within RP 5 443844 7728860 A Lode Dam Dam 2 hours of RP 6 Sam's Dam Spillway the RP 7 441635 7730140 Sump Below Scott Lode Waste Rock Dam discovery of RP 8 Dump Spillway the release) RP 9 444220 7727470 Tailings Storage Facility Dam RP 10 Scott Lode Pit Spillway RP 12 443248 7730532 Nancy Dam Dam Venue /VNU Pit Spillway 443470 7730550 Dam Spillway 441839 7731255 Dam Spillway 441131 7730243 Dam Spillway 442574 7730240 Dam Spillway 443460 7728480 Dam Spillway 443909 7727996 RP 14 444170 7727736 Oil Water Separator at Vera Workshop End of Pipe Oil Water Separator at Mill RP 15 441170 7729780 Maintenance workshop, release point End of Pipe is the irrigation area RP 17 442134 7730266 Janet A Pit Dam Spillway RP 18 444539 7727967 Orchid Pit Dam Spillway RP 191 442930 7728202 Janine East Pit Dam Spillway 1. In accordance with condition E52 and E53, the holder of the environmental authority must not release from RP19 until site specific release limits have been set.

    page 18Surface water, Regulated structures, Waste, Monitoring and reporting
  41. E3

    Releases to waters must be undertaken so as not to cause erosion of the bed and banks of the receiving waters, or cause a material build-up of sediment in such waters. Receiving Environment Monitoring Permit OFFICIAL Environmental Authority EPML00879413

    page 18Surface water, Land and soil, Monitoring and reporting
  42. E4

    The quality of the receiving waters must be monitored at the locations specified in Table E2 (Down Stream Monitoring Points and Reference Sites) for each quality characteristic and at the frequency stated in Table E3 (Contaminant Release Limit and Trigger Levels).

    page 19Surface water, Monitoring and reporting
  43. E5

    If quality characteristics of the release to waters exceed any of the trigger levels specified in Table E3 (Contaminant Release Limit and Trigger Levels) during a release event at the discharge points specified in Table E1 (Contaminant Release Points) or at the downstream monitoring sites specified in Table E2 (Down Stream Monitoring Points and Reference Sites), the environmental authority holder must compare the results of the impacted site to the data from reference monitoring sites and: (a) if the level of contaminants at the downstream site does not exceed the reference monitoring site data, then no action is to be taken; or (b) if the level of contaminants at the downstream site is greater than the reference monitoring site data, complete an investigation in accordance with the ANZECC & ARMCANZ 2000 methodology, into the potential for environmental harm and provide a written report to the administering authority within 3 months, outlining: (i) details of the investigations carried out; and (ii) actions taken to prevent environmental harm. Note: Where an exceedance of a trigger level has occurred and is being investigated, in accordance with E5 b (ii) of this condition, no further reporting is required for subsequent trigger events for that quality characteristic within the three month investigation period.

    page 19Surface water, Monitoring and reporting
  44. E6

    Release of contaminants to waters must not result in an exceedance of contaminant limits stated in Table E3 (Contaminant Release Limit and Trigger Levels) when measured at the monitoring points specified in Table

    page 19Monitoring and reporting
  45. E2

    (Down Stream Monitoring Points and Reference Sites) and authorised discharge points in Table E1 (Contaminant Release Limits) for each quality characteristic. Table E2 (Down Stream Monitoring Points and Reference Sites) Monitoring point Easting (GDA Northing (GDA Receiving waters Monitoring frequency (impacted sites) 94 MGA Zone 94 MGA Zone description daily during release (the first

    page 19Surface water, Monitoring and reporting
  46. WP2

    ^ 55) 55) Ephemeral stream sample must be taken within 2 WP3^ 444306 7730433 Ephemeral stream hours of the discovery of the

  47. WP13

    443534 7730448 Ephemeral stream release)

  48. WP15

    441766 7733124 Ephemeral stream

  49. WP16

    444737 7728844 Ephemeral stream

  50. WP18

    444060 7729620 Ephemeral stream

  51. WP19

    444694 7728269 Ephemeral stream

  52. WP27

    444629 7728053 Ephemeral stream WP28^ 444670 7729618 Ephemeral stream

  53. WP29

    440936 7731148 Ephemeral stream WP30^ 443875 7728646 Ephemeral stream

  54. WP31

    441923 7731465 Ephemeral stream 442201.9 7730299 NOTE: This does not apply to tailings dams ^ indicates sample point for WAD CN Receiving Waters - Reference Sites1 WP - C1 442490 7731468 Ephemeral stream Permit OFFICIAL Environmental Authority EPML00879413 Monitoring point Easting (GDA Northing (GDA Receiving waters Monitoring frequency (impacted sites) 94 MGA Zone 94 MGA Zone description WP - C2 55) 55) Ephemeral stream WP - C3 443829 7727370 Ephemeral stream WP - C4 Ephemeral stream 441134 7728112 442943 7730551 1. Reference sites must: (a) be from the same bio-geographic and climatic region; and (b) have similar geology, soil types and topography; and (c) contain a range of habitats similar to those at the test sites; and (d) have a similar flow regime; and (e) not be so close to the test sites that any disturbance at the test site also results in a change at the reference site Notes: a) The reference / upstream monitoring point should be within 1km the release point. b) The downstream point should not be greater than 500m from the release point. c) The data from reference monitoring points must not be used where they are affected by releases from other mines. Table E3 (Contaminant Release Limit and Trigger Levels) Quality / Contaminant Trigger Level for Contaminant Release Limit for all other Contaminant Characteristic all other Release Points in Release Points in Table E1 and Monitoring Release Table E1 and Monitoring Limit for Points in Table E2 Points in Table E2 RP197 6.0 (minimum) 5.0 (minimum) or 5th percentile1 of reference sites1, whichever is higher pH TBA7 7.5 (maximum) 9.0 (maximum) or 95th percentile1 of reference sites1, whichever is lower Electrical 435 (S/cm) 1000 (S/cm) or 95th percentile of reference, TBA7 Conductivity whichever is lower Cadmium 0.0002 (mg/L) 0.01 (mg/L) or 95th percentile1 of reference TBA7 sites1, whichever is lower Sulphate 80th percentile1 of the 1000 (mg/L) or 95th percentile1 of reference TBA7 reference1 sites1, whichever is lower Copper 0.0014 (mg/L) 1 (mg/L) or 95th percentile1 of reference sites1, TBA7 whichever is lower

    page 19Surface water, Regulated structures, Waste, Land and soil, Biodiversity, Monitoring and reporting
  55. E7

    The holder of this environmental authority must install, operate and maintain a stream flow gauging station to determine and record stream flows at the locations upstream of each release point as specified in Table E4 (Contaminant Release During Flow Events) for any receiving water into which a release occurs.

    page 21Surface water, Monitoring and reporting
  56. E8

    Notwithstanding any other condition of this environmental authority, the release of contaminants to waters must only take place during periods of natural flow events specified as minimum flow in Table E4 (Contaminant Release During Flow Events) for the contaminant release point(s) specified in Table E1 (Contaminant Release Points ). Table E4 (Contaminant Release During Flow Events) Receiving Release Gauging Easting Northing Minimum Flow in Flow Recording Water Point Station (GDA94 (GDA94 Frequency Description MGA MGA Zone Receiving Water Description Zone 55) 55) Continuous Required for a Release (minimum daily) 442300 7734180 Event 449427 7730394 MD2B - RP1 Area/ Depending on individual Molly Darling RP3 velocity/ flow catchment this minimum

    page 21Surface water
  57. E9

    At the time of release the water flow volume in the respective receiving water must be at least twenty (20) times the volume at which respective treated waste waters are released. Stream Sediment Contaminant Levels

    page 22Surface water, Waste, Land and soil
  58. E10

    Sediment quality of receiving waters and reference waters must be monitored twice a year (once at the end of the wet season and once at the end of the dry season) at the monitoring locations defined in Table e6 (Receiving stream sediment monitoring locations and frequency) and for the parameters defined in Table E5 (Stream sediment trigger and contaminant levels).

    page 22Surface water, Land and soil, Monitoring and reporting
  59. E11

    If quality characteristics of the release exceed any of the trigger levels specified in Table E5 (Stream sediment trigger and contaminant levels) during a release event, the environmental authority holder must compare the results of the impact site to the data from reference monitoring sites and: (a) if the level of contaminants at the downstream site does not exceed the reference monitoring site data, then no action is to be taken; and (b) if the level of contaminants at the downstream site is greater than the reference monitoring site data, complete an investigation in accordance with the ANZECC & ARMCANZ 2000 methodology, into the potential for environmental harm and provide a written report to the administering authority within 3 months, outlining: (i) details of the investigations carried out; and (ii) actions taken to prevent environmental harm. Note: Where an exceedance of a trigger level has occurred and is being investigated, in accordance with E11 b (ii) of this condition, no further reporting is required for subsequent trigger events for that quality characteristic within the three month investigation period.

    page 22Land and soil, Monitoring and reporting
  60. E12

    The release of contaminants to water must not result in an exceedance of sediment contaminant limits stated in Table E5 (Stream sediment trigger and contaminant levels) when measured at the monitoring points specified in Table E6 (Receiving stream sediment monitoring locations and frequency) for each quality characteristic. Permit OFFICIAL Environmental Authority EPML00879413

    page 22Land and soil, Monitoring and reporting
  61. E13

    All stream sediment sampling must be undertaken in accordance with AS 5667.12 Guidance on Sampling of Bottom Sediments of 1999. Table E5 - Stream sediment trigger and contaminant levels Parameter Unit Trigger Level Contaminant Limit Antimony mg/kg Reference value1 or 22, whichever is 253 or three times the reference value1, higher. whichever is higher Arsenic mg/kg Reference value1 or 202, whichever is 703 or three times the reference value1, higher. whichever is higher Barium mg/kg Reference value1 or 1094, whichever is 1534 or three times the reference value1, higher. whichever is higher Cadmium mg/kg Reference value1 or 1.53, whichever is 103 or three times the reference value2, higher. whichever is higher Copper mg/kg Reference1or 652, whichever is higher. 2703 or three times the reference value1, whichever is higher Lead mg/kg Reference value1 or 502 whichever is 2203 or three times the reference value1, higher. whichever is higher Mercury mg/kg Reference value1 or 0.152 whichever is 13 or twice the reference value1, whichever higher. is higher Nickel mg/kg Reference value1or 212, whichever is 523 or three times the reference value1, higher. whichever is higher. Silver mg/kg Reference value1 or 12, whichever is 3.73 or three times the reference value1, higher. whichever is higher Zinc mg/kg Reference value1 or 2002, whichever is 4103 or three times the reference value1, higher. whichever is higher. 1. Reference sites are defined in Table E6. 2. ANZECC (2000) Interim Sediment Quality Guidelines - low values based on total sediments 3. ANZECC (2000) Interim Sediment Quality Guidelines - high values based on total sediments 4. Values based on site specific parameters Table E6 - Receiving stream sediment monitoring locations and frequency Monitoring Point Easting Northing Monitoring Frequency (GDA 94 MGA (GDA 94 MGA Zone 55) Zone 55)

    page 23Land and soil, Monitoring and reporting
  62. WP13

    - RSS on creek line northern lease 441766 7733124 Twice Annually boundary (ML 1575)

  63. WP15

    - RSS on creek line eastern lease 444737 7728844 Twice Annually boundary (ML 1575)

  64. WP16

    - RSS on creek line eastern lease 444060 7729620 Twice Annually boundary (ML 1575)

  65. WP18

    - RSS on creek line south eastern 444694 7728269 Twice Annually lease boundary (ML 1575)

  66. WP30

    - on drainage line north of Scott 441923 7731465 Twice Annually Lode Waste Rock Dump

    page 23Waste
  67. WP2

    - RSS on creek line eastern lease 444306 7730433 Twice Annually boundary (ML 1575) WP - C1 reference site 442490 7731468 Twice Annually WP - C3 reference site 441134 7728112 Twice Annually Permit OFFICIAL Environmental Authority EPML00879413 Receiving Environment Monitoring Program (REMP)

    page 23Monitoring and reporting
  68. E14

    A REMP must be developed and implemented by 30 January 2013 to monitor and record the effects of the release of contaminants on the receiving environment periodically and whilst contaminants are being discharged from the site, with the aims of identifying and describing the extent of any adverse impacts to local environmental values, and monitoring any changes in the receiving water. A copy of the REMP must be provided to the administering authority prior to its implementation and due consideration given to any comments made on the REMP by the administering authority. For the purposes of the REMP, the receiving environment is the waters within 5 km downstream of any release point.

    page 24Surface water, Monitoring and reporting
  69. E15

    The REMP must address (but not necessarily be limited to) the following: a) Description of potentially affected receiving waters including key communities and reference water quality and sediment characteristics based on accurate and reliable monitoring data that takes into consideration any temporal variation (e.g. seasonality); and b) Description of applicable environmental values and water quality objectives to be achieved (i.e. as scheduled pursuant to the Environmental Protection (Water) Policy 2009); and c) Any relevant reports prepared by other governmental or professional research organisations that relate to the receiving environment within which the REMP is proposed; and d) Water and sediment quality targets within the receiving environment to be achieved, and clarification of contaminant concentrations or levels indicating adverse environmental impacts during the REMP. e) Monitoring for any potential adverse environmental impacts caused by the release; f) Monitoring of stream flow and hydrology; g) Monitoring of toxicants should consider the indicators specified in Table E3 to assess the extent of the compliance of concentrations with water quality objectives and/or the ANZECC 2000 guidelines for livestock drinking water guidelines; h) Monitoring of the parameters as a minimum those specified in Table E3 (in addition to dissolved oxygen saturation and temperature); i) Monitoring biological indicators (for macroinvertebrates in accordance with the administering authorities' monitoring and sampling manual (AusRivas methodology) and metals/metalloids in sediments (in accordance with ANZECC & ARMCANZ 2000, BATLEY and/or the most recent version of AS5667.1 Guidance on Sampling of Bottom Sediments) for permanent, semi-permanent water holes and water storages; j) The locations of monitoring points (including the locations specified in Table E2 which are reference/upstream and downstream impacted sites for each release point); k) The frequency or scheduling of sampling and analysis sufficient to determine water quality objectives and to derive site specific reference values within 2 years (depending on wet season flows) in accordance with the Queensland Water Quality Guidelines. For ephemeral streams, this should include periods of flow irrespective of mine or other discharges; l) Specify sampling and analysis methods and quality assurance and control; m) Any historical datasets to be relied upon; n) Description of the statistical basis on which conclusions are drawn; and o) Any spatial and temporal controls to exclude potential confounding factors. Permit OFFICIAL Environmental Authority EPML00879413

    page 24Surface water, Land and soil, Monitoring and reporting
  70. E16

    A report outlining the findings of the REMP, including all monitoring results and interpretations in accordance with conditions E15 must be prepared and submitted in writing to the administering authority by 1 May 2015 and thereafter every 12 months. This should include an assessment of reference water quality, any assimilative capacity for those contaminants monitored and the suitability of current discharge limits to protect downstream environment values. Monitoring of Water Storage Quality

    page 25Monitoring and reporting
  71. E17

    Water storages stated in Table E7 (Water Storage Monitoring) must be monitored for the water quality characteristics specified in Table E8 (Onsite Water Storage Contaminant Limits) at the monitoring locations and at the monitoring frequency specified in Table E7 (Water Storage Monitoring).

    page 25Monitoring and reporting
  72. E18

    In the event that waters storages defined in Table E7 (Water Storage Monitoring) exceed the contaminant limits defined in Table E8 (Onsite Water Storage Contaminant Limits), the holder of the environmental authority must implement measures to prevent access to waters by all livestock and minimise access by native fauna. Table E7 (Water Storage Monitoring) Water Storage Central Peg Central Peg Monitoring Frequency of Description Coordinates Coordinates Location Monitoring Stormwater Dam Easting Northing 440418; 7730687 Quarterly (GDA94 MGA (GDA94 MGA Zone 55) Zone 55) 440567 7730716 Madigans Dam 441708 7729948 444621; 7730090 Quarterly 444109 7727491 444164; 7727501 Quarterly Vera Dam 443221 7730489 443231, 7730449 Quarterly A Lode Dam 443375 7730601 443460; 7730576 Quarterly Sam's Dam Sump Below Scott 441866 7731252 441861; 7731241 Quarterly Lode Waste Rock 440986 7729985 440950; 7730025 445064 7726786 445067; 7726776 Quarterly Dump 445087 7727039 445071; 7727058 Quarterly Raw Water Dam Quarterly Turkeys nest Lynne Dam Table E8 (Onsite Water Storage Contaminant Limits) Parameter Unit Test Value Contaminant Limit pH pH unit Range Greater than 5.5, less than 93 EC -S/cm Maximum 59701 Sulphate mg/L Maximum 10001

    page 25Surface water, Regulated structures, Waste, Biodiversity, Monitoring and reporting
  73. E19

    Groundwater quality and level must be monitored at the locations and frequencies defined in Table E9 (Groundwater Monitoring Locations and Frequency) for parameters identified in Table E10 (Groundwater contaminant and trigger limits).

    page 26Groundwater, Monitoring and reporting
  74. E20

    Groundwaters from bores identified in Table E9 (Groundwater Monitoring Locations and Frequency), must not exceed any of the contaminant limits defined in Table E10 (Groundwater contaminant and trigger limits).

    page 26Groundwater, Monitoring and reporting
  75. E21

    The holder of this environmental authority must develop and submit a groundwater monitoring program to the administering authority within twelve (12) months from the date of issue of this environmental authority.

    page 26Groundwater, Monitoring and reporting
  76. E22

    The groundwater monitoring program required in Condition E21 must include: a) proposed groundwater monitoring bore locations; b) justification of the proposed groundwater monitoring locations, including, but not limited to; (i) providing a sufficient number of background/reference monitoring sites, that are unaffected by the mining activities authorised under this environmental authority to allow scientifically justifiable conclusions on the level of impact from the mining activities; (ii) base flow assessment of all water courses affected by mining activities; and (iii) sufficient number of monitoring bores to enable early detection of any potential groundwater contamination. c) monitoring of groundwater that includes sufficient number of monitoring bores which provides sufficient spatial coverage to enable scientifically justifiable conclusions in relation to potential environmental impacts from mining activities; d) monitoring of physical and chemical parameters, to enable scientifically justifiable conclusions in Permit OFFICIAL Environmental Authority EPML00879413 relation to potential environmental impacts from mining activities; e) the development of baseline groundwater information, including quality, groundwater flow direction and rate and hydraulic conductivity. In addition, consideration must be given to how these parameters may change during the life of the mining project. f) characterisation of the potential impacts to the local groundwater system arising from mining activities; g) representative groundwater samples for the aquifers being sampled; h) bore construction details; and i) include a conceptual groundwater model. j) monitoring of groundwater levels to detect any impacts from the activity.

    page 26Groundwater, Monitoring and reporting
  77. E23

    The groundwater monitoring program developed in accordance with Condition E21 must be independently certified by an appropriately qualified person as meeting the requirements of Condition E22 (above).

    page 27Groundwater, Monitoring and reporting
  78. E24

    The groundwater monitoring program developed in accordance with Condition E21 must be implemented.

    page 27Groundwater, Monitoring and reporting
  79. E25

    The groundwater monitoring program must be reviewed and updated by an appropriately qualified person by 1 May 2019, and every three years thereafter to ensure that proper and effective measures, practices or procedures are in place so that the mine is operated in accordance with the conditions of this environmental authority and that environmental harm to groundwaters is prevented or minimised.

    page 27Groundwater, Monitoring and reporting
  80. E26

    A report detailing the review in condition E25 must be provided to the administering authority within 30 days of the completion of the review. The report must comment on monitoring program design and recommended any necessary or desirable changes to monitoring locations, parameters, triggers and contaminant limits as contained in this environmental authority. Such recommendations should be provided with scientific justification.

    page 27Monitoring and reporting
  81. E27

    Groundwater monitoring bores must be constructed and operated in accordance with methods prescribed in the latest edition of the Agriculture and Resource Management Council of Australia and New Zealand manual titled Minimum Construction Requirements for Water Bores in Australia.

    page 27Groundwater, Monitoring and reporting
  82. E28

    Annual groundwater monitoring reports analysing groundwater chemistry and hydro-geological status of all groundwater bores and groundwater conditions must be prepared and provided on request.

    page 27Groundwater, Monitoring and reporting
  83. E29

    Groundwater levels must be monitored and groundwater level fluctuations in excess of 2m per year, (not resulting from the pumping of licensed bores) must be reported to the administering authority within 14 days following completion of monitoring. Permit OFFICIAL Environmental Authority EPML00879413 Table E9 - Groundwater monitoring locations and frequency Location Monitoring (MGA94 - Zone 55) Monitoring Surface Depth Screen(s) Frequency Point RL (m)1 (m) (m) Aquifer Standing Ground Easting Northing Water water Level Quality Reference Bores2 Tertiary Sediments and Molly Darling Sandstone 7D 441729.85 7732119.534 Sandstone 281.821 32.3 13-32.2 PW655

    page 27Groundwater, Land and soil, Monitoring and reporting
  84. MB19

    Sandstone 429576 7741047 (Britannia 330 84 60 - 84 Monthly2 Monthly2 Borefield) 441789.818 7733195.396 Andesite 270.705 71 56-68 Vera-Nancy Volcanics

  85. MB7

    445931 7726641 Volcanics TBA 40.0 28.0

  86. MB18

    444653 7728265 Andesite 283.522 64 58-64 Monthly2 56 Monthly2 124 44-56

  87. MB20

    441156.521 7728115.809 Sandstone 348.848 35 119.5 61-79 JA02A 441847.8 7730283 Volcanics 350.860 56 29-35 Every 12 65 hours

  88. MB23

    4 441408.251 7730908.766 Tertiary 301.313 Sediments Permit OFFICIAL Environmental Authority EPML00879413 Location Monitoring (MGA94 - Zone 55) Monitoring Surface Depth Screen(s) Frequency Point RL (m)1 (m) (m) Aquifer Standing Ground 20 19-20 Easting Northing 70 Water water Level Quality

    page 28Groundwater, Land and soil, Monitoring and reporting
  89. MB244

    440817.914 7729845.709 Tertiary 341.411 7728727.02 Sediments 289.82 JMB0026 444041.02 62-68 Tertiary 318.215 Sediments 294.189 Vera-Nancy Volcanics 336.73 324.123

    page 29Land and soil
  90. MB2

    442455.79 7730119.37 Pajingo 305.456 140 75-140 volcanics 285.582 MB4D SLP 443109.365 7730384.162 337.730 98 86-98 7730153.39 (minor 281.9

  91. MB5

    442222.95 7729954.865 quartz) 352.201 94 82-88

  92. MB14

    443275.206 7730035.223 Volcanics

  93. MB15

    442960.973 7728062.021 and Molly 311 92.5 80-92.5

  94. MB25

    444580.699 7730305.000 Darling 279.16 7728252.41 Sandstone 50 38.5-50 Quarterly Quarterly

  95. E30

    If quality characteristics of the groundwater monitoring exceed any of the trigger levels specified in Table E10 (Groundwater contaminant and trigger limits) the environmental authority holder must compare the results of the impact site to the data from reference monitoring sites and: (a) if the level of contaminants at the downstream site does not exceed the reference monitoring site data, then no action is to be taken; or (b) if the level of contaminants at the downstream site is greater than the reference monitoring site data, complete an investigation in accordance with the ANZECC & ARMCANZ 2000 methodology, into the potential for environmental harm and provide a written report to the administering authority within 3 months, outlining: (i) details of the investigations carried out; and (ii) actions taken to prevent environmental harm. Note: Where an exceedance of a trigger level has occurred and is being investigated, in accordance with E30 b (ii) of this condition, no further reporting is required for subsequent trigger events for that quality characteristic within the three month investigation period. Water General

    page 32Groundwater, Monitoring and reporting
  96. E31

    All determinations of water quality must be: a) performed by a person or body possessing appropriate experience and qualifications to perform the required measurements; b) made in accordance with methods prescribed in the latest edition of the administering authority's monitoring and sampling manual; c) collected from the monitoring locations identified within this environmental authority, within 12 hours of each other where possible; and d) carried out on representative samples. e) laboratory testing must be undertaken using a laboratory accredited (e.g. NATA) for the method of analysis being used. Water release events

    page 32Monitoring and reporting
  97. E32

    For any water release event the authority holder must notify the administering authority as soon as possible (no later than six (6) hours of having commenced releasing mine affected water to the receiving environment) and provide the following information: (a) release commencement date/time; (b) expected release cessation date/time; (c) release point/s; (d) release volume (estimated); (e) receiving water/s including the natural flow rate; and (f) any details (including available data) regarding likely impacts on the receiving water(s). (g) notification of persons who may be affected by the event has occurred/is being undertaken. Note: Notification to the administering authority must be addressed to the Manager and Project Manager of the local administering authority via phone, e-mail or facsimile. Permit OFFICIAL Environmental Authority EPML00879413

    page 32Surface water, Monitoring and reporting
  98. E33

    The authority holder must notify the administering authority as soon as possible (within twenty-four (24) hours) of the cessation of a water release event and then within 28 days provide the following information in writing: (a) release cessation date/time; (b) the reason for the release; (c) the location of the release; (d) natural flow volume in receiving water; (e) an estimate of the volume of water released; (f) all water quality monitoring results; (g) details regarding the compliance of the release with the conditions of this environmental authority (i.e. contamination limits); (h) any general observations; (i) all calculations; (j) any other matters pertinent to the water release event.

    page 33Surface water, Monitoring and reporting
  99. E34

    The release of contaminants directly or indirectly to waters: (a) must not produce any visible discolouration of receiving waters; nor (b) must not produce any slick or other visible or odorous evidence of oil, grease or petrochemicals nor contain visible floating oil, grease, scum, litter or other objectionable matter. Annual Water Monitoring Reporting

    page 33Surface water, Monitoring and reporting
  100. E35

    The following information must be recorded in relation to all water monitoring required under the conditions of this environmental authority and submitted to the administering authority on request: (a) the date on which the sample was taken; (b) the time at which the sample was taken; (c) the monitoring point at which the sample was taken; (d) the measured or estimated daily quantity of the contaminants released from all release points; (e) the release flow rate at the time of sampling for each release point; (f) the results of all monitoring and details of any exceedances with the conditions of this environmental authority; and (g) water quality monitoring data must be provided to the administering authority in the specified electronic format upon request. Permit OFFICIAL Environmental Authority EPML00879413 Water Management Plan

    page 33Surface water, Monitoring and reporting
  101. E36

    The holder of the environmental authority must implement a Water Management Plan that provides for the proper and effective management of the actual and potential environmental impacts resulting from the mining activity and to ensure compliance with the conditions of this environmental authority.

  102. E37

    The Water Management Plan must be developed in accordance with Administering Authority Guideline for Preparing a Water Management Plan 2009 or any updates that become available from time to time and must include at least the following components: (a) Contaminant Source Study; (b) Site Water Balance and Model; (c) Water Management System; (d) Saline and Metalliferous Drainage Prevention and Management Measures; (e) Acid Rock Drainage Prevention and Management Measures (if applicable); (f) Emergency and Contingency Planning; (g) Monitoring and Review.

    page 34Monitoring and reporting
  103. E38

    Each year the holder of the environmental authority must undertake a review of the Water Management Plan prior to the wet season (and no later than 1 November) and a further review following the wet season (i.e. by 1 May the following year) to ensure that proper and effective measures, practices or procedures are in place so that the mine is operated in accordance with the conditions of this environmental authority and that environmental harm is prevented or minimised.

  104. E39

    A copy of the Water Management Plan and/or a review of the Water Management Plan must be provided to the administering authority on request. Saline, acid rock and metalliferous drainage

  105. E40

    The holder of this environmental authority must ensure proper and effective measures are taken to avoid or otherwise minimise the generation and/or release of saline, acid rock and/or metalliferous drainage. Stormwater, Sediment and Erosion controls

    page 34Surface water, Land and soil
  106. E41

    An Erosion and Sediment Control Plan must be developed and certified by an appropriately qualified person and implemented for all stages of the mining activities on the site to prevent or minimise erosion and the release of sediment to receiving waters and the contamination of storm water.

    page 34Surface water, Land and soil
  107. E42

    The Erosion and Sediment Control Plan must be included in each subsequent Plans of Operations and provide for at least the following stormwater management functions: (a) Prevent or minimise the contamination of stormwater; (b) diverting uncontaminated stormwater run-off around areas disturbed by mining activities or where contaminants or wastes are stored or handled; (c) contaminated stormwater runoff, incident rainfall and leachate is collected; and treated, reused, or released in accordance with the conditions of this environmental authority; (d) roofing or minimising the size of areas where contaminants or wastes are stored or handled; (e) using alternate materials and or processes (such as dry absorbents) to clean up spills that will minimise the generation of contaminated waters, and; (f) erosion and sediment control structures are placed to minimise erosion of disturbed areas and prevent the contamination of any waters. Permit OFFICIAL Environmental Authority EPML00879413 (g) Procedures to ensure that erosion and sediment control structures are maintained and adequate storage is available in sediment dams in accordance with design criteria. (h) training of staff that will be responsible for maintenance and operations of sediment and erosion control structures.

    page 34Surface water, Regulated structures, Waste, Land and soil
  108. E43

    Erosion protection measures and sediment control measures must be implemented and maintained to minimise erosion and the release of sediment and contamination of storm water.

    page 35Land and soil
  109. E44

    The maintenance and cleaning of any vehicles, plant or equipment must not be carried out in areas from which contaminants can be released into any receiving waters.

    page 35Surface water
  110. E45

    Any spillage of wastes, contaminants or other materials must be cleaned up as quickly as practicable to minimise the release of wastes, contaminants or materials to any storm water drainage system or receiving waters. Water Reuse

    page 35Surface water, Waste
  111. E46

    Water at the mine site may be piped, trucked or transferred for the purpose of supplying livestock water to directly adjoining properties or a third party.

  112. E47

    Water used to supply livestock drinking in accordance with E46 must: (a) meet the quality limits specified in Schedule E - Table E8 (Onsite Water Storage Contaminant Limits); and (b) comply with all other conditions of this approval.

  113. E48

    Water to be used for livestock watering purposes under condition E46, must be contained within a storage facility (tank or dam) such that it is not directly or indirectly released to the receiving environment.

    page 35Regulated structures
  114. E49

    The volume and quality of water supplied under condition E46 must be monitored and recorded. The quality parameters must include at a minimum, those listed in Schedule E - Table E8 (Onsite Water Storage Contaminant Limits).

    page 35Monitoring and reporting
  115. E50

    If the responsibility of water from the mine site (the water) is given or transferred to another person in accordance with this environmental authority: (a) The responsibility of the water must only be given or transferred in accordance with a written agreement (the third party agreement); (b) The written agreement must require the recipient of the water not to use that water in a manner which would contravene a government standard, legalisation or policy or a condition of this environmental authority; (c) The agreement must highlight that the use of contaminated water for stock must not be used in contravention of any food safety standards; and (d) Include in the third party agreement a commitment from the person utilising the water to use water in such a way as to prevent environmental harm or public health incidences and specifically make the persons aware of the General Environmental Duty (GED) under section 319 of the Environmental Protection Act 1994, environmental sustainability of the water disposal and protection of environmental values and waters. Permit OFFICIAL Environmental Authority EPML00879413

  116. E51

    A copy of the third party agreement referred to in condition E50 must be provided to the administering authority upon request. Janine East Pit

  117. E52

    The holder of the environmental authority must not release from RP19 until site specific release limits in accordance with condition E53 have been set.

  118. E53

    By 5 April 2020, the holder of the environmental authority must provide the administering authority site specific release limits that meet the requirements of Table E3. The site specific release limits must be determined in accordance with the Technical guideline - Licensing - Wastewater release to Queensland

  119. E54

    The mining activities must not cause environmental harm to any groundwater dependent ecosystems. Residual Voids

    page 36Groundwater
  120. E55

    By 30 March 2028 a revised closure water balance model and geochemical model must be developed by an appropriately qualified person.

  121. E56

    The water balance model required under Condition E55 must: (a) Be informed by sufficient data points to achieve high confidence in model outputs (b) Use geometry and borehole data to estimate retained volumes; (c) Include catchment gauging to establish runoff values; and (d) Predict long-term pit water levels.

  122. E57

    The geochemical model required under Condition E55 must: (a) Be informed by quarterly water sampling results; (b) Include kinetic testing to identify pit wall solute release rates; and (c) Predict long-term pit water quality.

  123. E58

    The water balance model and geochemical model required in Condition E55 must be maintained and updated to ensure compliance with the EA for operational and post-mining activities. END OF CONDITIONS FOR SCHEDULE E Permit OFFICIAL Environmental Authority EPML00879413 Schedule F - Biodiversity Biodiversity offsets

    page 36Biodiversity
  124. G1

    The environmental authority holder must rehabilitate all land disturbed by the mining activities in a manner that ensures rehabilitated areas achieve the following rehabilitation objectives: a) Safe for humans and wildlife; b) Non-polluting; c) Stable; d) Able to sustain an agreed land outcome as defined in Table G1; e) Revegetated with species endemic to the area with no declared pest species; and f) Compliant with all conditions of this environmental authority. Table G1 - (Land outcomes) Mine Domain Mine Feature Location (MGA94, Land Outcomes Name zone 55) Native ecosystem Tailings Storage 440890 7730335 Facility (TSF1) Native ecosystem Tailings Storage 441491 7729611 Facility 2 (TSF2) Light/intermittent grazing Sump 1 (TSF2) 441718 7730185 Light/intermittent Dams Sump 2 (TSF2) 441488 7729963 grazing Scott Lode Pit 442769 7730189 Native ecosystem Stormwater dam 440567 7730716 Water storage Madigan's dam 441708 7729948 Water storage 443221 7730489 Water storage A Lode dam 443375 7730601 Water storage Sam's dam 441866 7731252 Water storage SL WRD Sump 443508 7728461 Light/intermittent Nancy dam grazing 444109 7727491 Vera dam 440986 7729985 Water storage Raw Water Dam Water storage 441169 7730623 Light/intermittent Cave Seep Pit 441932 7730645 grazing Scott Lode WRD Native ecosystem 443476 7729183 Light/intermittent Cindy WRD grazing Waste Vera WRD 443871 7727624 Light/intermittent Janet A/K PAF 442267 7730213 grazing WRD Light/intermittent Venue NAF WRD 443512 7727807 grazing Light/intermittent grazing Permit OFFICIAL Environmental Authority EPML00879413

    page 38Rehabilitation, Surface water, Regulated structures, Waste
  125. G2

    A Final Land Use Rehabilitation Plan (`FLURP') that describes how the rehabilitation objectives in condition

    page 41Rehabilitation
  126. G1

    will be achieved must be developed, documented and implemented for all stages of the mining activity by 30 June 2017. The FLURP must at minimum include: a) Schematic representation of the proposed final land form inclusive of site drainage features; b) Details of proposed slope design and erosion and sediment controls; c) Proposed cover designs for encapsulation of waste material, including performance criteria; d) Proposed re-vegetation methods inclusive of plant species selection, propagation methods and establishment of suitable plant growth medium (i.e. top soil); e) Materials balance for all rehabilitation requirements including available top soil and material suitable for encapsulating waste in accordance with the proposed encapsulation methodology; f) Geotechnical, geochemical and hydrological studies necessary to demonstrate likely success of proposed rehabilitation methodology to achieve the required rehabilitation outcomes; g) An investigation of proposed residual voids including potential for generation/mobilisation of contaminants, potential pathways for release of contaminants to waters (including groundwater) and a long-term void water balance model; and h) A rehabilitation monitoring program sufficient to identify if required rehabilitation outcomes have been achieved.

    page 41Rehabilitation, Groundwater, Waste, Land and soil, Biodiversity, Monitoring and reporting
  127. G3

    Rehabilitation in accordance with condition G2 must commence progressively in accordance with the plan of operations.

    page 41Rehabilitation
  128. G4

    Residual voids (including open pits and underground workings) must not cause any serious or material environmental harm, other than the environmental harm constituted by the existence of the residual void itself, subject to any other condition within this environmental authority.

  129. G5

    All explosives, flammable or corrosive substances, hazardous chemicals, toxic substances, gases and dangerous goods must be stored and handled in accordance with: a) The current Australian Standard where applicable; or b) Where no relevant Australian Standard exists, store such materials within an on-site containment system sufficient to prevent release to the receiving environment.

    page 41Waste
  130. G6

    Minimise the potential for contamination of land by hazardous contaminants. END OF CONDITIONS FOR SCHEDULE G Permit OFFICIAL Environmental Authority EPML00879413 Schedule H - Regulated Structures

    page 41Regulated structures, Waste
  131. H1

    The consequence category of any structure must be assessed by a suitably qualified and experienced person in accordance with the Manual for assessing consequence categories and hydraulic performance of structures a) Prior to the construction of the structure, if it is not an existing structure; or b) If it is an existing structure, by 27 January 2017; or c) Prior to any change in its purpose or the nature of its stored contents.

    page 42Regulated structures
  132. H2

    A consequence assessment report and certification must be prepared for each structure assessed and the report may include a consequence assessment for more than one structure.

    page 42Monitoring and reporting
  133. H3

    Certification must be provided by the suitably qualified and experienced person who undertook the assessment, in the form set out in the Manual for assessing consequence categories and hydraulic Design and construction of a regulated structure

    page 42Regulated structures
  134. H4

    Conditions H5 to H9 inclusive do not apply to existing structures.

  135. H5

    All regulated structures must be designed by, and constructed under the supervision of, a suitably qualified and experienced person in accordance with the requirements of the Manual for assessing consequence

    page 42Regulated structures
  136. H6

    Construction of a regulated structure is prohibited unless the environmental authority holder has submitted to the administering authority and 28 days have elapsed, the following: a) a consequence category assessment report, as required by condition H2, and b) the suitably qualified and experienced person certified design and design plan; and c) the associated suitably qualified and experienced person certified operating procedures.

    page 42Regulated structures, Monitoring and reporting
  137. H7

    Certification must be provided by the suitably qualified and experienced person who oversees the preparation of the design plan in the form set out in the Manual for assessing consequence categories and hydraulic

    page 42Regulated structures
  138. H8

    Regulated structures must: a) be designed and constructed in accordance with and conform to the requirements of the Manual for b) be designed and constructed with due consideration given to ensuring that the design integrity would not be compromised on account of: i) floodwaters from entering the regulated structure from any watercourse or drainage line; and ii) wall failure due to erosion by floodwaters arising from any watercourse or drainage line.

    page 42Surface water, Regulated structures, Land and soil
  139. H9

    Certification by the suitably qualified and experienced person who supervises the construction must be submitted to the administering authority within 10 days of the completion of construction of the regulated structure, and state that: a) the 'as constructed' drawings and specifications meet the original intent of the design plan for that regulated structure; b) construction of the regulated structure is in accordance with the design plan. Operation of a regulated structure

    page 42Regulated structures
  140. H10

    Operation of a regulated structure must not commence unless the environmental authority holder has Permit OFFICIAL Environmental Authority EPML00879413 submitted to the administering authority: a) One electronic copy of the design plan and certification of the `design plan' in accordance with condition H7, and b) A set of `as constructed' drawings and specifications, and c) Certification of those `as constructed drawings and specifications' in accordance with condition H9, and d) Where the regulated structure is to be managed as part of an integrated containment system for the purpose of sharing the design storage allowance (DSA) volume across the system, a copy of the certified system design plan; e) A statement that confirms: i. The requirements of this authority relating to the construction of the regulated structure have been met; ii. The details required under this authority, have been entered into a Register of Regulated Structures; and iii. There is a current operational plan for the regulated structures.

    page 42Regulated structures
  141. H11

    For existing structures that are regulated structures: a) where the existing structure that is a regulated structure is managed as part of an integrated containment system for the purpose of sharing the DSA volume across the system, the environmental authority holder must submit to the administering authority within three (3) months of the commencement of this condition a copy of the certified system design plan including that structure; and b) There must be a current operational plan for the existing structures.

    page 43Regulated structures
  142. H12

    Each regulated structure must be maintained and operated, for the duration of its operational life until decommissioned and rehabilitated, in a manner that is consistent with the current operational plan and, if applicable, the current design plan and associated certified `as constructed' drawings. Mandatory reporting level

    page 43Rehabilitation, Regulated structures, Monitoring and reporting
  143. H13

    Conditions H14 to H17 inclusive only apply to Regulated Structures which have not been certified as low consequence category for `failure to contain - overtopping'.

    page 43Regulated structures
  144. H14

    The Mandatory Reporting Level (the MRL) specified in Table H1 must be marked on a regulated structure in such a way that during routine inspections of that structure, it is clearly observable.

    page 43Regulated structures, Monitoring and reporting
  145. H15

    The environmental authority holder must, as soon as practical and within forty-eight (48) hours of becoming aware, notify the administering authority when the level of the contents of a regulated structure reaches the MRL.

    page 43Regulated structures, Monitoring and reporting
  146. H16

    The environmental authority holder must, immediately on becoming aware that the MRL has been reached, act to prevent the occurrence of any unauthorised discharge from the regulated structure. 17 The environmental authority holder must record any changes to the MRL in Table H1 and in the Register of Regulated Structures. Permit OFFICIAL Environmental Authority EPML00879413 Design storage allowance

    page 43Regulated structures, Monitoring and reporting
  147. H18

    The environmental authority holder must assess the performance of each regulated structure or linked containment system over the preceding November to May period based on actual observations of the available storage in each regulated structure or linked containment system taken prior to 1 July of each year.

    page 44Regulated structures
  148. H19

    By 1 November of each year, storage capacity must be available in each regulated structure (or network of linked containment systems with a shared DSA volume), to meet the Design Storage Allowance (DSA) volume for the structure (or network of linked containment systems), as specified in Table H1.

    page 44Regulated structures
  149. H20

    The environmental authority holder must, as soon as possible and within forty-eight (48) hours of becoming aware that the regulated structure (or network of linked containment systems) will not have the available storage to meet the DSA volume on 1 November of any year, notify the administering authority.

    page 44Regulated structures, Monitoring and reporting
  150. H21

    The environmental authority holder must, immediately on becoming aware that a regulated structure (or network of linked containment systems) will not have the available storage to meet the DSA volume on 1 November of any year, act to prevent the occurrence of any unauthorised discharge from the regulated structure or linked containment systems. Annual inspection report

    page 44Regulated structures, Monitoring and reporting
  151. H22

    Each regulated structure must be inspected each calendar year by a suitably qualified and experienced person.

    page 44Regulated structures
  152. H23

    At each annual inspection, the condition and adequacy of all components of the regulated structure must be assessed and a suitably qualified and experienced person must prepare an annual inspection report containing details of the assessment and include recommended actions, if applicable, to ensure the integrity of the regulated structure.

    page 44Regulated structures, Monitoring and reporting
  153. H24

    The suitably qualified and experienced person who prepared the annual inspection report must certify the report in accordance with the Manual for assessing consequence categories and hydraulic performance of

    page 44Regulated structures, Monitoring and reporting
  154. H25

    The environmental authority holder must within 20 business days of receipt of the annual inspection report, provide to the administering authority: a) The recommendations section of the annual inspection report; and b) If applicable, any details of any actions being taken in response to those recommendations. Transfer arrangements

    page 44Monitoring and reporting
  155. H26

    The environmental authority holder must provide a copy of any reports, documentation and certifications prepared under this authority, including but not limited to any Register of Regulated Structures, consequence assessment, design plan and other supporting documentation, to a new holder on transfer of this authority. Decommissioning and rehabilitation

    page 44Rehabilitation, Regulated structures, Monitoring and reporting
  156. H27

    Regulated structures and structures must not be abandoned but must be decommissioned and rehabilitated to achieve compliance with conditions G1 and G2 of this environmental authority. Transitional Arrangements

    page 44Rehabilitation, Regulated structures
  157. H28

    All existing structures that have not been assessed in accordance with the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635) must be assessed and certified in accordance with the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635) by 27 January 2017. Hydraulic performance of regulated structures Permit OFFICIAL Environmental Authority EPML00879413

    page 44Regulated structures
  158. H29

    Each regulated structure authorised by this environmental authority as specified in Schedule A - Table A1, must meet the hydraulic performance criteria listed in Table H1 for that structure. Table H1 - Hydraulic performance criteria (`Table H1') Name of Spillway Capacity Design Storage Mandatory Reporting Regulated Structure Consequence Allowance (DSA) Level (MRL) Purpose of Category structure Design mAHD Design mAHD Design mAHD Criteria Criteria Criteria The permanent containment of 1:100 3 tailings from month wet extraction and processing of season plus 1.05m 1:100 72 0.34m gold and silver hour below

    page 45Regulated structures, Waste, Monitoring and reporting
  159. H30

    The hydraulic performance criteria specified in Table H1 are the minimum mandatory performance requirements; regulated structures must be managed in a manner that ensures compliance with all conditions of this environmental authority.

    page 46Regulated structures
  160. H31

    Notwithstanding any other condition of this environmental authority, a High Density Polyethylene (HDPE) Geomembrane liner system must be installed and maintained within TSF2, to prevent release of contaminants, including leachate, to land and waters. END OF CONDITIONS FOR SCHEDULE H Permit OFFICIAL Environmental Authority EPML00879413 Schedule I - Definitions Definitions Key terms and/or phrases used in this document are defined in this section. Where a term is not defined, the definition in the Environmental Protection Act 1994, its regulations or environmental protection policies must be used. If a word remains undefined it has its ordinary meaning. Word / Phrase Definition Acceptance criteria Means the measures by which actions implemented are deemed to be complete. The acceptance criteria indicate the success of the decommissioning and rehabilitation outcomes or remediation of areas which have been significantly disturbed by the mining activities. Acceptance criteria may include information regarding: a) Stability of final land forms in terms of settlement, erosion, weathering, pondage and drainage; b) Control of geochemical and contaminant transport processes; c) Quality of runoff waters and potential impact on receiving environment; d) Vegetation establishment, survival and succession; e) Vegetation productivity, sustained growth and structure development; f) Fauna colonisation and habitat development; g) Ecosystem processes such as soil development and nutrient cycling, and the recolonisation of specific fauna groups such as collembola, mites and termites which are involved in these processes; h) Microbiological studies including recolonisation by mycorrhizal fungi, microbial biomass and respiration; i) Effects of various establishment treatments such as deep ripping, topsoil handling, seeding and fertiliser application on vegetation growth and development; j) Resilience of vegetation to disease, insect attack, drought and fire; k) Vegetation water use and effects on ground water levels and catchment yields. Acid rock drainage Means any contaminated discharge emanating from a mining activity formed through a series of chemical and/or biological reactions. Administering Is the agency that administers the environmental authority provisions under the authority Environmental Protection Act 1994. Ambient (or total) At a place, means the level of noise at the place from all sources (near and far), noise measured as the Leq for an appropriate time interval.

    page 46Rehabilitation, Noise and vibration, Land and soil, Biodiversity

Instrument text by page (numbering incomplete)

Numbering in this instrument has gaps, so its full text is also shown page by page.

  1. Page 1

    OFFICIAL A transitional environmental program (TEP) relates to this environmental authority and is currently in force until 30 September 2026. The holder of this Permit environmental authority is also the holder of the TEP. A copy of the TEP, titled `Transitional Environmental Program, Document Environmental Protection Act 1994 Reference MAN-E-100846113 amended 26 February 2026' can be obtained Environmental Authority EPML00879413 In accordance with s349 of the Environmental Protection Act 1994 (the Act), the holder of an approval for a TEP must achieve full compliance with the Act for the matters dealt with by the TEP at the end of the period over which the TEP is carried out. It is an offence to contravene a requirement of the TEP or a condition of the TEP approval. Date: 27 February 2026 This environmental authority is issued by the administering authority under Chapter 5 of the Environmental Protection Act 1994. Environmental authority number: EPML00879413 Environmental authority takes effect on 13 April 2026. The anniversary date of this environmental authority is 08 September each year. Environmental authority holder Registered address Level 7, 61-73 Sturt Street, Townsville City, QLD 4810 Name NQM GOLD 2 PTY LTD Environmentally relevant activity and location details Environmentally relevant activities Locations Schedule 3 16: Mining gold ore ML1575 ML10215 Schedule 3 18: Mining lead, silver or zinc separately or ML10246 in any combination ML10370 Ancillary 08 - Chemical Storage 2: Storing 50t or more ML1575 of chemicals of dangerous goods class 6, division 6.1 ML10215 under subsection (1)(b) ML10246 Ancillary 30 - Metal smelting and refining 1: Processing in a year (a) 1t to 100t of gold Ancillary 31 - Mineral processing 2: Processing, in a year, the following quantities of mineral products, other than coke (b) more than 100,000t Ancillary 60 - Waste disposal 3: Operating a facility for disposing of, in a year, the following quantity of waste mentioned in subsection (1)(c) (d) more than 200,000t Ancillary 62 - Resource recovery and transfer facility operation 1: Operating a facility for receiving and sorting, dismantling, baling or temporarily storing- (a) scrap steel, non-putrescible waste or green waste only

    Waste
  2. Page 2

    Permit OFFICIAL Environmental Authority EPML00879413 Environmentally relevant activities Locations Ancillary 62 - Resource recovery and transfer facility ML1575 operation 1: Operating a facility for receiving and ML10215 sorting, dismantling, baling or temporarily storing- (b) ML10246 general waste Ancillary 62 - Resource recovery and transfer facility operation 1: Operating a facility for receiving and sorting, dismantling, baling or temporarily storing- (c) category 2 regulated waste Ancillary 62 - Resource recovery and transfer facility operation 1: Operating a facility for receiving and sorting, dismantling, baling or temporarily storing- (d) category 1 regulated waste Ancillary 63 - Sewage Treatment 1: Operating sewage treatment works, other than no-release works, with a total daily peak design capacity of (a-ii) 21 to 100EP otherwise Ancillary 64 - Water treatment 3: Treating 10ML or more raw water in a day Additional information for applicants Environmentally relevant activities The description of any environmentally relevant activity (ERA) for which an environmental authority (EA) is issued is a restatement of the ERA as defined by legislation at the time the EA is issued. Where there is any inconsistency between that description of an ERA and the conditions stated by an EA as to the scale, intensity or manner of carrying out an ERA, the conditions prevail to the extent of the inconsistency. An EA authorises the carrying out of an ERA and does not authorise any environmental harm unless a condition stated by the EA specifically authorises environmental harm. A person carrying out an ERA must also be a registered suitable operator under the Environmental Protection Act 1994 (EP Act). Mobile and temporary activities If you operate a mobile and temporary ERA, other than regulated waste transport, you are required to maintain a work diary. You must: - keep the work diary records for 2 years after the last entry; - inform the administering authority within 7 days of the work diary being lost or stolen; - record the information required in the work diary for each location within 1 day of leaving the location.

    Waste, Monitoring and reporting
  3. Page 3

    Permit OFFICIAL Environmental Authority EPML00879413 Contaminated land It is a requirement of the EP Act that an owner or occupier of land give written notice to the administering authority if they become aware of the following: - the presence of, or happening of an event involving, a hazardous contaminant on the land that is causing, or is reasonably likely to cause, serious or material environmental harm (notice must be given within 24 hours); or - if the land is contaminated land - a change in the condition of the land that is causing, or is reasonably likely to cause, serious or material environmental harm (notice must be given within 24 hours); or - a notifiable activity (as defined in Schedule 3) having been carried out, or is being carried out, on the land (notice must be given within 20 business days). For further information, including the form for giving written notice, refer to the Queensland Government website www.qld.gov.au, using the search term `duty to notify'. Take effect Please note that, in accordance with section 200(1) of the EP Act, an EA has effect: (a) if the authority is for a prescribed ERA and it states that it takes effect on the day nominated by the holder of the authority in a written notice given to the administering authority--on the nominated day; or (b) if the authority states a day or an event for it to take effect--on the stated day or when the stated event happens; or (c) otherwise--on the day the authority is issued. However, in accordance with section 200(2) of the EP Act, the day that the EA takes effect may not be before: (a) if the authority is for a resource activity--the day the relevant tenure is granted to the applicant; or (b) if a development permit for a material change of use of premises under the Planning Act 2016 is necessary for carrying out an activity that related to the authority--the day the development permit takes effect; or (c) if an SDA Approval under the State Development and Public Works Organisation Act 1971 is necessary for carrying out an activity that relates to the authority--the day the approval takes effect. If this EA takes effect when the additional authorisation takes effect, you must provide the administering authority written notice within 5 business days of receiving notification of the related additional authorisation taking effect. If you have incorrectly claimed that an additional authorisation is not required, carrying out the ERA without the additional authorisation is not legal and could result in your prosecution for providing false or misleading information or operating without a valid EA. 13 April 2026 Signature Date Giles Bezzina Enquiries: Delegate of the administering authority PO Box 7230, Cairns QLD 4870 Environmental Protection Act 1994 Phone: (07) 4222 5352 Email: ESCairns@detsi.qld.gov.au

    Waste, Monitoring and reporting
  4. Page 4

    Permit OFFICIAL Environmental Authority EPML00879413 Obligations under the Environmental Protection Act 1994 In addition to the requirements found in the conditions of this EA, the holder must also meet their obligations under the EP Act, and the regulations made under the EP Act. For example, the holder must comply with the following provisions of the Act: - general environmental duty (section 319) - duty to restore the environment (section 319C) - duty to notify environmental harm (section 320-320G) - offence of causing serious or material environmental harm (sections 437-439) - offence of causing environmental nuisance (section 440) - offence of depositing prescribed water contaminants in waters and related matters (section 440ZG) - offence to place contaminant where environmental harm or nuisance may be caused (section 443). Other permits required This permit only provides an approval under the EP Act. In order to lawfully operate you may also require permits / approvals from your local government authority, other business units within the department, and other State and Federal Government agencies prior to commencing any activity at the site. For example, this may include permits or approvals with your local Council (for planning approval), the Department of Transport and Main Roads (to access State controlled roads), the Department of Natural Resources and Mines, Manufacturing, and Regional and Rural Development (to clear vegetation), and the Department of Primary Industries (to clear marine plants or to obtain a quarry material allocation). Obligations under the Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) Matters of national environmental significance (MNES) are regulated under the Commonwealth EPBC Act rather than under state legislation. You may need to submit a referral if your project potentially impacts any matters protected under the EPBC Act. For more information on self-assessments, and referral and assessment processes, please visit the Australian Government Department of Climate Change, Energy, the Environment and Water's website at www.dcceew.gov.au/environment/epbc/advice. Obligations under the Aboriginal Cultural Heritage Act 2003 and Torres Strait Islander Cultural Heritage Act 2003 (the Cultural Heritage Acts) The Cultural Heritage Acts require anyone who carries out a land-use activity to exercise a duty of care. This `duty of care' means land users must take all reasonable and practicable measures to ensure their activity does not harm Aboriginal or Torres Strait Islander cultural heritage, and applies to any activity where Aboriginal or Torres Strait Islander cultural heritage is located. For more information on your obligations under this legislation, please visit the Department of Women, Aboriginal and Torres Strait Islander Partnerships and Multiculturalism webpage at, www.dwatsipm.qld.gov.au.

    Biodiversity, Monitoring and reporting
  5. Page 5

    Permit OFFICIAL Environmental Authority EPML00879413 Conditions of environmental authority Schedule A - General Schedule B - Air Schedule C - Waste Management Schedule D - Noise Schedule E - Water Schedule F - Biodiversity Schedule G - Land and Rehabilitation Schedule H - Regulated Structures Schedule I - Definitions Schedule J - Maps and Plans

    Rehabilitation, Regulated structures, Noise and vibration, Waste
  6. Page 6

    Permit OFFICIAL Environmental Authority EPML00879413 Schedule A - General A1 This environmental authority authorises environmental harm referred to in the conditions. Where there is no condition or this environmental authority is silent on a matter, the lack of a condition or silence does not authorise environmental harm. A2 Contaminants with the potential to cause environmental harm must not be released directly or indirectly to the receiving environment, except as permitted under the conditions of this environmental authority. A3 The environmental authority holder must ensure that the activity is carried out in accordance with Table A1 and Schedule J - Figure 1 - Location of authorised disturbance: Dams; Figure 2 - Location of authorised disturbance: Waste rock dumps, landfills, irrigation areas and run of mine areas; Figure 3 - Location of authorised disturbance: Processing, voids, mining areas and ancillary infrastructure; and Figure 4 - Location of authorised disturbance: Powerlines-substations, seismic lines and topsoil stockpiles. Table A1 - Authorised disturbance (`Table A1') Mine Mine Feature Name Location Maximum Domain (MGA94, Zone 55) disturbance Central Peg Coordinates area (ha) Tailings 440890 7730335 43.00 Storage Facility (TSF1) 441491 7729611 17.60 Tailings Storage Facility 2 (TSF2) Sump 1 (TSF2) 441718 7730185 0.01 Sump 2 (TSF2) 441488 7729963 0.01 Scott Lode Pit 442769 7730189 21.09 Dams Stormwater dam 440567 7730716 7.66 Madigan's dam 441708 7729948 2.66 A Lode dam 443221 7730489 1.09 Sam's dam 443375 7730601 2.49 SL WRD Sump 441866 7731252 0.33 Nancy dam 443508 7728461 0.35

    Surface water, Regulated structures, Waste, Land and soil
  7. Page 7

    Permit OFFICIAL Environmental Authority EPML00879413 Mine Mine Feature Name Location Maximum Domain (MGA94, Zone 55) disturbance Central Peg Coordinates area (ha) Vera dam 444109 7727491 Raw Water Dam 1.32 Cave Seep Pit 440986 7729985 1.02 Scott Lode WRD 441169 7730623 0.10 441932 7730645 29.76 Cindy WRD Vera WRD 443476 7729183 8.38 Janet A/K PAF WRD 3.73 443871 7727624 Venue NAF WRD 4.78 442267 7730213 Venue PAF Footprint 14.13 Vera Landfill 443512 7727807 7.76 Waste Processing Landfill 443393 7728069 1.25 Site Landfill 1.25 Run of Mine 443588 7727574 2.25 (ROM) Irrigation area - Mill 440876 7729597 0.5 Irrigation area - Vera 441090 7730050 0.5 Processing 441180 7729840 1.66 area Anne temp WRD 444210 7727921 6.77 Vera ROM 442651 7729309 Ancillary 443718 7727675 3 Janet A ROM 441869 7730358 2.46 Mill ROM 441074 7729560 6.0 445100 7726840 0.05 Lynne Boxcut ROM 445064 7726786 0.19 Turkeys Nest 445087 7727039 17.01 Lynne Dam 7.3 Mill 441176 7729663 441497 7729882 Exploration Core Yard

    Regulated structures, Waste
  8. Page 8

    Permit OFFICIAL Environmental Authority EPML00879413 Mine Mine Feature Name Location Maximum Domain (MGA94, Zone 55) disturbance Exploration Outpost Central Peg Coordinates Infrastructure Cindy Infrastructure area (ha) 444380 7729998 1.80 443661 7728977 4.24 Access roads and tracks Various Various 129.2 Bypass Haul Road Various Various 4.93 Various Various 0.93 Starlight B Haul Road Various Various 3.70 Lynne Haul Road 443846 7729843 1.00 441626 7729302 2.69 Surface explosives area Voids Cleared area (previous borrow Various Various 21.4 4 pit) Various Various 440299 7730135 27.50 Material Stockpiles TBP1 TBP1 TBP1 TBP1 Laydown Yards TBP1 TBP1 2.81 TSF West Borrow Pit 444544 7727912 442904 7728129 8.81 Nancy Pit 443009 7728248 Nancy North Pit 442807 7728376 2.0 Orchid Pit 442077 7730216 3.08 Janine East Janine North Pit 4.34 Janine Northwest 2.97 4.86 Janet A Pit 7.07 Cindy Pit 443516 7728837 3.24 Vera Pit 444057 7727739 VNU Pit2 443853 7727909 Venue Pit2 443735 7728070 Sue Pit 442807 7728520

  9. Page 9

    Permit OFFICIAL Environmental Authority EPML00879413 Mine Mine Feature Name Location Maximum Domain (MGA94, Zone 55) disturbance Janine Extension Pit Starlight B Pit Central Peg Coordinates area (ha) Anne Pits 1.39 Vera 443056 7728018 3.00 1.40 445601 7726994 5.35 442280 7729551 0.4 14.65 444246 7727865 3.24 Vent Fans Various Various 39.95 1.40 Mining Area Powerlines Various Various Venue Project 443474 7728398 83.06 Seismic Survey Various Various Lynne Powerline Stage 1 & 2 Various Various Exploration Pajingo Site Various Various 1. TBP - To be provided prior to commencement of mining activity 2. Venue Pit and VNU pit are constructed as a single void A4 The holder of this environmental authority must: a) Install all measures, plant and equipment necessary to ensure compliance with the conditions of this environmental authority; b) Maintain such measures, plant and equipment in a proper and efficient condition; c) Operate such measures, plant and equipment in a proper and efficient manner; and d) Ensure all instruments and devices used for the measurement or monitoring of any parameter under any condition of this environmental authority are properly calibrated. Monitoring A5 All monitoring data, records and reports required by this environmental authority or related to environmental management of the activities must be: a) Carried out by an appropriately qualified person, periodically reviewed and updated as required to reflect operational or environmental changes; b) Kept for a period of not less than five (5) years; c) Provided to the administering authority in the specified format within 10 business days of a request; and d) Undertaken in accordance with the most recent version of any applicable standard or guideline for the activity. A6 The following information must be recorded in relation to all monitoring required under a condition of this

    Monitoring and reporting
  10. Page 10

    Permit OFFICIAL Environmental Authority EPML00879413 environmental authority: a) The date and time when the sample was taken; b) The location where the sample was taken; and c) Any other pertinent details of relevance to interpreting the sampling results (i.e. stream flow, wind conditions or any unusual observations such as odour or colouration). A7 The environmental authority holder must implement all reasonable measures necessary to conduct monitoring required under a condition of this environmental authority. Note: `Reasonable measures' could include establishing and maintaining safe all-weather access to a monitoring location by upgrading roads/tracks, use of suitable automated sampling devices, developing alternative routes or utilising alternative transport. Financial assurance A8 Financial assurance must be lodged with the administering authority in the amount, the form and within the time required by the administering authority. Risk management A9 The holder of this environmental authority must develop and implement a risk management system for mining activities which mirrors the content requirement of the Standard for Risk Management (ISO31000:2009), or the latest edition of an Australian standard for risk management, to the extent relevant to environmental management, by 22 December 2016. Notification of emergencies, incidents and exceptions A10 The environmental authority holder must notify the administering authority within 24 hours of becoming aware of any emergency, incident, sample result or event which does or may contravene a condition of this environmental authority. A11 Within 10 business days following the initial notification of an emergency, event or incident, or receipt of monitoring results, whichever is the latter, further written advice must be provided to the administering authority, including the following: a) Results and interpretation of any samples taken and analysed; b) Outcomes of actions taken at the time to prevent or minimise unlawful environmental harm; and c) Proposed actions to prevent a recurrence of the emergency or incident. Complaints A12 The holder of this environmental authority must record all environmental complaints received about the mining activities including: a) Name, address and contact number of the complainant; b) Time and date of complaint; c) Reasons for the complaint; d) Investigations undertaken; e) Conclusions formed; f) Actions taken to resolve the complaint; g) Any abatement measures implemented; and h) Person responsible for resolving the complaint.

    Air, Monitoring and reporting
  11. Page 11

    Permit OFFICIAL Environmental Authority EPML00879413 A13 When requested by the administering authority, the environmental authority holder must undertake specified monitoring within the timeframe nominated by the administering authority, to investigate any complaint related to the activity. Third-party reporting A14 The holder of this environmental authority must: a) By 30 June 2017, obtain from an appropriately qualified person a report on compliance with the conditions of this environmental authority; b) Obtain further such reports at regular intervals, not exceeding three (3) yearly intervals, from the completion of the report referred to above; and c) Provide each report to the administering authority within 90 days of its completion. Exploration A15 All exploration activities carried out on the mining leases must comply with each of the standard conditions contained in the most recent version of the administering authority's Eligibility Criteria and Standard is a discrepancy between the ERA Standard and this environmental authority, the conditions of the environmental authority apply. END OF CONDITIONS FOR SCHEDULE A

    Monitoring and reporting
  12. Page 12

    Permit OFFICIAL Environmental Authority EPML00879413 Schedule B - Air B1 The release of noxious or offensive odour, dust or any other airborne contaminant resulting from the activities must not cause environmental nuisance or harm. END OF CONDITIONS FOR SCHEDULE B

    Air
  13. Page 13

    Permit OFFICIAL Environmental Authority EPML00879413 Schedule C - Waste management C1 All waste generated as part of the mining activities must be disposed of in a lawful manner at an off-site facility, with the exception of: a) Waste rock and tailings, which must be characterised, handled and disposed of in accordance with condition C5 of this environmental authority; b) Timber pallets; c) General waste deposited in the active waste disposal trench; d) Tyres, subject to condition C3. e) Concrete and foundation material, demolished building materials including veranda's and demountables, scrap steel and geological waste (core trays and unwanted core). Note: The only waste authorised to be burnt on site is explosive boxes and untreated timber pallets, for fire training purposes, so long as the burning does not cause environmental harm. C2 General waste must only be disposed of into the waste disposal trench of ML1575 and ML10215 and identified in Schedule J - Figure 2 - Location of authorised disturbance: Waste rock dumps, landfills, irrigation areas and run of mine areas. C3 Subject to demonstrating to the administering authority that no other use higher in the waste management hierarchy can be practicably implemented, waste tyres generated from mining activities may be disposed of on site in non acid producing waste rock dumps or underground stopes. C4 Regulated waste awaiting removal may be temporarily stored on site awaiting removal provided it is stored to ensure there is minimal risk of causing fire or contamination to land or waters. C5 All waste rock and tailings must be: a) Geochemically characterised and disposed of in a manner that minimises the potential generation and/or release of contaminants to the receiving environment; b) Where the geochemical characteristics of waste rock is uncertain, this material must be treated as potentially acid forming, saline mine drainage or neutral mine drainage forming until demonstrated otherwise; and c) Details pertaining to meeting the requirements of this condition must be recorded and retained until this environmental authority is surrendered. C6 WAD cyanide concentrations in the tailings surface liquor must not exceed 50mg/L. C7 The environmental authority holder must immediately commence cyanide destruction if WAD cyanide concentrations in the tailings surface liquor exceed 50mg/L. C8 Any seepage from the temporary PAF waste rock dump from Janet A and K Dump must be directed to Scott Lode Pit. C9 Any seepage from the temporary PAF waste rock dump Venue/VNU must be directed to the Venue/VNU pits. C10 All waste rock characterised as potentially acid forming from Janet A pit, within K dump, within Anne pits and within Scott Lode waste rock dump must be returned to Scott Lode Pit, Janet A pit and Venue/VNU pit once the pits become available for rehabilitation.

    Rehabilitation, Waste
  14. Page 14

    Permit OFFICIAL Environmental Authority EPML00879413 C11 All waste rock characterised as potentially acid forming from Nancy, Nancy North, Janine East, Janine Northwest, Orchid, Venue/ VNU pits, Lynne underground workings, Janine North, Janine Extension, Starlight B and Sue pits must be returned to Venue/VNU pit at the completion of the mining of these pits. C12 Within two years of completion of mining at Starlight B and Janine Northwest pits, the pits must be backfilled with non-acid producing material from the same lithology. C13 Within six months of completion of mining at Anne pits, the pits must be backfilled with non-acid producing material from the same lithology. Sewage Treatment C14 Effluent from the sewage treatment plant must comply with the release limits stated in Table C1. Table C1 - Treated sewage effluent contaminant release limits (`Table C1') Contaminant Unit Release Release Limit type Frequency limit1 limit A Maximum Monthly 5 day Biochemical mg/L L30ode Dam2 oxygen demand (BOD)1 mg/L 20 Total suspended solids 30 100 Maximum Monthly Nitrogen mg/L 30 30 Maximum Monthly Phosphorus mg/L 15 30 Maximum Monthly E-coli Organisms/100ml 1000 1000 Maximum Monthly pH pH units 6.0 - 9.0. 5.5 - 9.0 Range Monthly 1. Measured at the end of pipe 2. Measured at the end of pipe when released to the A Lode Dam 3. Based on at least 5 but no more than 10 consecutive samples C15 Sewage effluent may only be released to the following locations: a) Within the nominated irrigation area identified in Table A1 or the A Lode Dam; or b) Other land for the purpose of dust suppression and/or fire fighting; or c) Reused as part of the mining activities. C16 The application of sewage effluent must be carried out in a manner such that: a) Vegetation is not damaged; b) There is no surface ponding of effluent; c) There is no run-off or over spray of effluent. C17 Sewage effluent releases must be monitored at the frequency and for the parameters specified in Table C1. C18 The daily volume of sewage effluent release must be measured and documented. C19 When circumstances prevent the irrigation or beneficial reuse of treated sewage effluent such as during or following rain events, measures must be taken to store or lawfully dispose of effluent. C20 Sewage effluent must only be supplied to another person or organisation that has a written plan detailing how the user of the treated sewage effluent will comply with their general environmental duty whilst using the treated sewage effluent.

    Regulated structures, Air, Waste, Biodiversity, Monitoring and reporting
  15. Page 15

    Permit OFFICIAL Environmental Authority EPML00879413 END OF CONDITIONS FOR SCHEDULE C

  16. Page 16

    Permit OFFICIAL Environmental Authority EPML00879413 Schedule D - Noise Noise limits D1 The holder of this environmental authority must ensure that noise generated by the mining activities does not cause the criteria in Table D1 to be exceeded at a sensitive place or commercial place. Table D1 - Noise limits (`Table D1') Noise level Monday to Sundays and Public Holidays DB(A) 9am to 6pm 6pm to 10pm 10pm to 9am measured as: (Leq,adj,T (T BG1 + 5 or (40dB) BG1 + 5 or (35dB) BG1 + 3 or (33dB) = 15 minutes to 1 hour) dB(A)* 1. Background (BG) noise level minimum based on "E3 guideline for Noise and from Extractive Industries" for night time and evening. Airblast overpressure nuisance D2 The holder of this environmental authority must ensure that blasting does not cause the limits for peak particle velocity and air blast overpressure in Table D2 to be exceeded at a sensitive place or commercial place. Table D2 - Blasting noise limits (`Table D2') Blasting noise Sensitive or commercial blasting noise limits place limits limits Monday to Friday 7am to Monday to Friday 6pm to Monday to Friday Air blast 6pm 7am 6pm to 7am overpressure Saturday, Sunday and Public Saturday, Sunday and Saturday, Sunday Holidays 9am - 6pm Public Holidays 6pm - and Public Holidays Open Cut Pits and 9am 6pm - 9am Underground Workings Open Cut Pits Underground Workings 115 dB (Linear) Peak for nine No Blasting 115 dB (Linear) Peak (9) out of ten (10) consecutive for nine (9) out of ten blasts initiated and not greater (10) consecutive blasts than 120 bB (Linear) Peak at initiated and not any time greater than 120 bB (Linear) Peak at any time Ground vibration 5mm/second peak particle 5mm/second peak peak particle velocity for nine (9) out of ten particle velocity for nine velocity (10) consecutive blasts and not greater than 10 mm/second (9) out of ten (10) peak particle velocity at any No Blasting consecutive blasts and time not greater than 10 mm/second peak particle velocity at any time Monitoring and reporting D3 Noise monitoring and recording must include the following descriptor characteristics and matters:

    Noise and vibration, Monitoring and reporting
  17. Page 17

    Permit OFFICIAL Environmental Authority EPML00879413 a) L (where N equals the statistical levels of 1, 10 and 90 and T = 15 mins) AN,T b) background noise LA90 c) the level and frequency of occurrence of impulsive or tonal noise and any adjustment and penalties to statistical levels d) atmospheric conditions including temperature, relative humidity and wind speed and directions e) effects due to any extraneous factors such as traffic noise f) location, date and time of monitoring g) if the complaint concerns low frequency noise, Max LpLIN,T and one third octave band measurements in dB(LIN) for centre frequencies in the 10 - 200 Hz range. Note: Noise and blast monitoring as required by the administering authority in accordance with Schedule A - condition A13 END OF CONDITIONS FOR SCHEDULE D

    Noise and vibration, Monitoring and reporting
  18. Page 18

    Permit OFFICIAL Environmental Authority EPML00879413 Schedule E - Water Contaminant Release to Waters E1 Contaminants that will, or have the potential to cause environmental harm must not be released directly or indirectly to any waters except as permitted under the conditions of this environmental authority. E2 The release of contaminants to waters must only occur from the authorised release points in Table E1 (Contaminant Release Points) and must be monitored at the locations and frequency specified in Table E1 (Contaminant Release Points) for each quality characteristics specified in Table E3 (Contaminant Release Limit and Trigger Levels). Table E1 (Contaminant Release Points) Release Easting Northing Contaminant Source and Location, Monitoring Frequency Point (GDA94 (GDA94 and Description of Release Point Point MGA Zone MGA Zone daily during RP 1 Stormwater Dam Dam release (the RP 2 55) 55) Cindy Dam Spillway first sample RP 3 440690 7730890 Madigans Dam Dam must be RP 4 Vera Sump Spillway taken within RP 5 443844 7728860 A Lode Dam Dam 2 hours of RP 6 Sam's Dam Spillway the RP 7 441635 7730140 Sump Below Scott Lode Waste Rock Dam discovery of RP 8 Dump Spillway the release) RP 9 444220 7727470 Tailings Storage Facility Dam RP 10 Scott Lode Pit Spillway RP 12 443248 7730532 Nancy Dam Dam Venue /VNU Pit Spillway 443470 7730550 Dam Spillway 441839 7731255 Dam Spillway 441131 7730243 Dam Spillway 442574 7730240 Dam Spillway 443460 7728480 Dam Spillway 443909 7727996 RP 14 444170 7727736 Oil Water Separator at Vera Workshop End of Pipe Oil Water Separator at Mill RP 15 441170 7729780 Maintenance workshop, release point End of Pipe is the irrigation area RP 17 442134 7730266 Janet A Pit Dam Spillway RP 18 444539 7727967 Orchid Pit Dam Spillway RP 191 442930 7728202 Janine East Pit Dam Spillway 1. In accordance with condition E52 and E53, the holder of the environmental authority must not release from RP19 until site specific release limits have been set. E3 Releases to waters must be undertaken so as not to cause erosion of the bed and banks of the receiving waters, or cause a material build-up of sediment in such waters. Receiving Environment Monitoring

    Surface water, Regulated structures, Waste, Land and soil, Monitoring and reporting
  19. Page 19

    Permit OFFICIAL Environmental Authority EPML00879413 E4 The quality of the receiving waters must be monitored at the locations specified in Table E2 (Down Stream Monitoring Points and Reference Sites) for each quality characteristic and at the frequency stated in Table E3 (Contaminant Release Limit and Trigger Levels). E5 If quality characteristics of the release to waters exceed any of the trigger levels specified in Table E3 (Contaminant Release Limit and Trigger Levels) during a release event at the discharge points specified in Table E1 (Contaminant Release Points) or at the downstream monitoring sites specified in Table E2 (Down Stream Monitoring Points and Reference Sites), the environmental authority holder must compare the results of the impacted site to the data from reference monitoring sites and: (a) if the level of contaminants at the downstream site does not exceed the reference monitoring site data, then no action is to be taken; or (b) if the level of contaminants at the downstream site is greater than the reference monitoring site data, complete an investigation in accordance with the ANZECC & ARMCANZ 2000 methodology, into the potential for environmental harm and provide a written report to the administering authority within 3 months, outlining: (i) details of the investigations carried out; and (ii) actions taken to prevent environmental harm. Note: Where an exceedance of a trigger level has occurred and is being investigated, in accordance with E5 b (ii) of this condition, no further reporting is required for subsequent trigger events for that quality characteristic within the three month investigation period. E6 Release of contaminants to waters must not result in an exceedance of contaminant limits stated in Table E3 (Contaminant Release Limit and Trigger Levels) when measured at the monitoring points specified in Table E2 (Down Stream Monitoring Points and Reference Sites) and authorised discharge points in Table E1 (Contaminant Release Limits) for each quality characteristic. Table E2 (Down Stream Monitoring Points and Reference Sites) Monitoring point Easting (GDA Northing (GDA Receiving waters Monitoring frequency (impacted sites) 94 MGA Zone 94 MGA Zone description daily during release (the first WP2 ^ 55) 55) Ephemeral stream sample must be taken within 2 WP3^ 444306 7730433 Ephemeral stream hours of the discovery of the WP13 443534 7730448 Ephemeral stream release) WP15 441766 7733124 Ephemeral stream WP16 444737 7728844 Ephemeral stream WP18 444060 7729620 Ephemeral stream WP19 444694 7728269 Ephemeral stream WP27 444629 7728053 Ephemeral stream WP28^ 444670 7729618 Ephemeral stream WP29 440936 7731148 Ephemeral stream WP30^ 443875 7728646 Ephemeral stream WP31 441923 7731465 Ephemeral stream 442201.9 7730299 NOTE: This does not apply to tailings dams ^ indicates sample point for WAD CN Receiving Waters - Reference Sites1 WP - C1 442490 7731468 Ephemeral stream

    Surface water, Regulated structures, Waste, Monitoring and reporting
  20. Page 20

    Permit OFFICIAL Environmental Authority EPML00879413 Monitoring point Easting (GDA Northing (GDA Receiving waters Monitoring frequency (impacted sites) 94 MGA Zone 94 MGA Zone description WP - C2 55) 55) Ephemeral stream WP - C3 443829 7727370 Ephemeral stream WP - C4 Ephemeral stream 441134 7728112 442943 7730551 1. Reference sites must: (a) be from the same bio-geographic and climatic region; and (b) have similar geology, soil types and topography; and (c) contain a range of habitats similar to those at the test sites; and (d) have a similar flow regime; and (e) not be so close to the test sites that any disturbance at the test site also results in a change at the reference site Notes: a) The reference / upstream monitoring point should be within 1km the release point. b) The downstream point should not be greater than 500m from the release point. c) The data from reference monitoring points must not be used where they are affected by releases from other mines. Table E3 (Contaminant Release Limit and Trigger Levels) Quality / Contaminant Trigger Level for Contaminant Release Limit for all other Contaminant Characteristic all other Release Points in Release Points in Table E1 and Monitoring Release Table E1 and Monitoring Limit for Points in Table E2 Points in Table E2 RP197 6.0 (minimum) 5.0 (minimum) or 5th percentile1 of reference sites1, whichever is higher pH TBA7 7.5 (maximum) 9.0 (maximum) or 95th percentile1 of reference sites1, whichever is lower Electrical 435 (S/cm) 1000 (S/cm) or 95th percentile of reference, TBA7 Conductivity whichever is lower Cadmium 0.0002 (mg/L) 0.01 (mg/L) or 95th percentile1 of reference TBA7 sites1, whichever is lower Sulphate 80th percentile1 of the 1000 (mg/L) or 95th percentile1 of reference TBA7 reference1 sites1, whichever is lower Copper 0.0014 (mg/L) 1 (mg/L) or 95th percentile1 of reference sites1, TBA7 whichever is lower Nickel 0.011 (mg/L) 1 (mg/L) or 95th percentile1 of reference sites1, TBA7 whichever is lower Lead 0.0034 (mg/L) 0.1 (mg/L) or 95th percentile1 of reference TBA7 sites1, whichever is lower Zinc 0.008 (mg/L) 20 (mg/L) or 95th percentile1 of reference TBA7 sites1, whichever is lower Arsenic 0.013 (mg/L) 0.5 (mg/L) or 95th percentile1 of reference TBA7 sites1, whichever is lower Mercury 0.0006 (mg/L) 0.002 (mg/L) or 95th percentile1 of reference TBA7 sites1, whichever is lower Cyanide (WAD)3 For interpretation only For interpretation only TBA7 Cyanide (Free) 7 (g/L) 0.5(mg/l) or 95th percentile1 of reference sites1, TBA7 whichever is lower Silver 0.05 (g/L) 0.1(g/L) or 95th percentile1 of reference sites1, TBA7 whichever is lower

    Surface water, Land and soil, Biodiversity, Monitoring and reporting
  21. Page 21

    Permit OFFICIAL Environmental Authority EPML00879413 Quality / Contaminant Trigger Level for Contaminant Release Limit for all other Contaminant Characteristic all other Release Points in Release Points in Table E1 and Monitoring Release Table E1 and Monitoring Limit for Total Petroleum Points in Table E2 Points in Table E2 RP197 Hydrocarbons - 5 (mg/L) - (TPH)5 Dissolved 80th percentile of the reference1 95th percentile of reference sites1 (mg/L) - oxygen6 (mg/L) 95th percentile of reference sites1 (mg/L as - Total nitrogen6 80th percentile of the reference1 nitrogen) (mg/L as nitrogen) - Total 95th percentile of reference sites1 (mg/L as phosphorous6 80th percentile of the reference1 phosphorous) - (mg/L as phosphorous) Faecal 100 (CFU/100mL) Coliforms6 - NOTE: This does not apply to tailings dams 1. Trigger levels based on percentiles are derived using ANZECC (2000) methodology and are based on the reference sites defined in Schedule E Table E2. For the accordance of doubt if the reference dataset is not ANZECC (2000) compliant than the default limits should be used. 2. ANZECC (2000) trigger levels for aquatic ecosystems of slightly disturbed tropical Australian upland rivers. (95th percentile level of protection) 3. WAD CN is Weak Acid Dissociable Cyanide, measured as an indicator of the bio-available cyanide. WAD CN must be sampled at locations marked with ^ in Schedule E- Table E2 only. 4. Total dissolved solids 5. TPH monitored at locations RP 14, RP 15, RP 16 in Table E1 1 6. These limits will apply to the authorised release point at A Lode Dam only RP5 as specified in Table E1 7. In accordance with condition E53, the holder of the environmental authority must provide the administering authority site specific release limits that meet the requirements of Table E3. The site specific release limits must be determined in accordance with the Technical guideline release limits must be agreed to by the administering authority. Stream Flow Monitoring E7 The holder of this environmental authority must install, operate and maintain a stream flow gauging station to determine and record stream flows at the locations upstream of each release point as specified in Table E4 (Contaminant Release During Flow Events) for any receiving water into which a release occurs. E8 Notwithstanding any other condition of this environmental authority, the release of contaminants to waters must only take place during periods of natural flow events specified as minimum flow in Table E4 (Contaminant Release During Flow Events) for the contaminant release point(s) specified in Table E1 (Contaminant Release Points ). Table E4 (Contaminant Release During Flow Events) Receiving Release Gauging Easting Northing Minimum Flow in Flow Recording Water Point Station (GDA94 (GDA94 Frequency Description MGA MGA Zone Receiving Water Description Zone 55) 55) Continuous Required for a Release (minimum daily) 442300 7734180 Event 449427 7730394 MD2B - RP1 Area/ Depending on individual Molly Darling RP3 velocity/ flow catchment this minimum RP7 module flow trigger will be either Creek RP8 logger the release comprising less than 5% of the FM2 - Four RP2 Area/ natural flow or any Mile Creek velocity/ flow natural flow in the receiving environment.

    Surface water, Regulated structures, Waste, Monitoring and reporting
  22. Page 22

    Permit OFFICIAL Environmental Authority EPML00879413 Receiving Release Gauging Easting Northing Minimum Flow in Flow Recording Water Point Station (GDA94 (GDA94 Frequency Description MGA MGA Zone Receiving Water Description Zone 55) 55) Required for a Release Event RP4 module The volume of flow can RP6 logger RP9 be determined by height RP10 RP18 of water or flow. The RP19 actual flow must be a quantifiable measurement. Example: 5m3/sec E9 At the time of release the water flow volume in the respective receiving water must be at least twenty (20) times the volume at which respective treated waste waters are released. Stream Sediment Contaminant Levels E10 Sediment quality of receiving waters and reference waters must be monitored twice a year (once at the end of the wet season and once at the end of the dry season) at the monitoring locations defined in Table e6 (Receiving stream sediment monitoring locations and frequency) and for the parameters defined in Table E5 (Stream sediment trigger and contaminant levels). E11 If quality characteristics of the release exceed any of the trigger levels specified in Table E5 (Stream sediment trigger and contaminant levels) during a release event, the environmental authority holder must compare the results of the impact site to the data from reference monitoring sites and: (a) if the level of contaminants at the downstream site does not exceed the reference monitoring site data, then no action is to be taken; and (b) if the level of contaminants at the downstream site is greater than the reference monitoring site data, complete an investigation in accordance with the ANZECC & ARMCANZ 2000 methodology, into the potential for environmental harm and provide a written report to the administering authority within 3 months, outlining: (i) details of the investigations carried out; and (ii) actions taken to prevent environmental harm. Note: Where an exceedance of a trigger level has occurred and is being investigated, in accordance with E11 b (ii) of this condition, no further reporting is required for subsequent trigger events for that quality characteristic within the three month investigation period. E12 The release of contaminants to water must not result in an exceedance of sediment contaminant limits stated in Table E5 (Stream sediment trigger and contaminant levels) when measured at the monitoring points specified in Table E6 (Receiving stream sediment monitoring locations and frequency) for each quality characteristic.

    Surface water, Waste, Land and soil, Monitoring and reporting
  23. Page 23

    Permit OFFICIAL Environmental Authority EPML00879413 E13 All stream sediment sampling must be undertaken in accordance with AS 5667.12 Guidance on Sampling of Bottom Sediments of 1999. Table E5 - Stream sediment trigger and contaminant levels Parameter Unit Trigger Level Contaminant Limit Antimony mg/kg Reference value1 or 22, whichever is 253 or three times the reference value1, higher. whichever is higher Arsenic mg/kg Reference value1 or 202, whichever is 703 or three times the reference value1, higher. whichever is higher Barium mg/kg Reference value1 or 1094, whichever is 1534 or three times the reference value1, higher. whichever is higher Cadmium mg/kg Reference value1 or 1.53, whichever is 103 or three times the reference value2, higher. whichever is higher Copper mg/kg Reference1or 652, whichever is higher. 2703 or three times the reference value1, whichever is higher Lead mg/kg Reference value1 or 502 whichever is 2203 or three times the reference value1, higher. whichever is higher Mercury mg/kg Reference value1 or 0.152 whichever is 13 or twice the reference value1, whichever higher. is higher Nickel mg/kg Reference value1or 212, whichever is 523 or three times the reference value1, higher. whichever is higher. Silver mg/kg Reference value1 or 12, whichever is 3.73 or three times the reference value1, higher. whichever is higher Zinc mg/kg Reference value1 or 2002, whichever is 4103 or three times the reference value1, higher. whichever is higher. 1. Reference sites are defined in Table E6. 2. ANZECC (2000) Interim Sediment Quality Guidelines - low values based on total sediments 3. ANZECC (2000) Interim Sediment Quality Guidelines - high values based on total sediments 4. Values based on site specific parameters Table E6 - Receiving stream sediment monitoring locations and frequency Monitoring Point Easting Northing Monitoring Frequency (GDA 94 MGA (GDA 94 MGA Zone 55) Zone 55) WP13 - RSS on creek line northern lease 441766 7733124 Twice Annually boundary (ML 1575) WP15 - RSS on creek line eastern lease 444737 7728844 Twice Annually boundary (ML 1575) WP16 - RSS on creek line eastern lease 444060 7729620 Twice Annually boundary (ML 1575) WP18 - RSS on creek line south eastern 444694 7728269 Twice Annually lease boundary (ML 1575) WP30 - on drainage line north of Scott 441923 7731465 Twice Annually Lode Waste Rock Dump WP2 - RSS on creek line eastern lease 444306 7730433 Twice Annually boundary (ML 1575) WP - C1 reference site 442490 7731468 Twice Annually WP - C3 reference site 441134 7728112 Twice Annually

    Waste, Land and soil, Monitoring and reporting
  24. Page 24

    Permit OFFICIAL Environmental Authority EPML00879413 Receiving Environment Monitoring Program (REMP) E14 A REMP must be developed and implemented by 30 January 2013 to monitor and record the effects of the release of contaminants on the receiving environment periodically and whilst contaminants are being discharged from the site, with the aims of identifying and describing the extent of any adverse impacts to local environmental values, and monitoring any changes in the receiving water. A copy of the REMP must be provided to the administering authority prior to its implementation and due consideration given to any comments made on the REMP by the administering authority. For the purposes of the REMP, the receiving environment is the waters within 5 km downstream of any release point. E15 The REMP must address (but not necessarily be limited to) the following: a) Description of potentially affected receiving waters including key communities and reference water quality and sediment characteristics based on accurate and reliable monitoring data that takes into consideration any temporal variation (e.g. seasonality); and b) Description of applicable environmental values and water quality objectives to be achieved (i.e. as scheduled pursuant to the Environmental Protection (Water) Policy 2009); and c) Any relevant reports prepared by other governmental or professional research organisations that relate to the receiving environment within which the REMP is proposed; and d) Water and sediment quality targets within the receiving environment to be achieved, and clarification of contaminant concentrations or levels indicating adverse environmental impacts during the REMP. e) Monitoring for any potential adverse environmental impacts caused by the release; f) Monitoring of stream flow and hydrology; g) Monitoring of toxicants should consider the indicators specified in Table E3 to assess the extent of the compliance of concentrations with water quality objectives and/or the ANZECC 2000 guidelines for livestock drinking water guidelines; h) Monitoring of the parameters as a minimum those specified in Table E3 (in addition to dissolved oxygen saturation and temperature); i) Monitoring biological indicators (for macroinvertebrates in accordance with the administering authorities' monitoring and sampling manual (AusRivas methodology) and metals/metalloids in sediments (in accordance with ANZECC & ARMCANZ 2000, BATLEY and/or the most recent version of AS5667.1 Guidance on Sampling of Bottom Sediments) for permanent, semi-permanent water holes and water storages; j) The locations of monitoring points (including the locations specified in Table E2 which are reference/upstream and downstream impacted sites for each release point); k) The frequency or scheduling of sampling and analysis sufficient to determine water quality objectives and to derive site specific reference values within 2 years (depending on wet season flows) in accordance with the Queensland Water Quality Guidelines. For ephemeral streams, this should include periods of flow irrespective of mine or other discharges; l) Specify sampling and analysis methods and quality assurance and control; m) Any historical datasets to be relied upon; n) Description of the statistical basis on which conclusions are drawn; and o) Any spatial and temporal controls to exclude potential confounding factors.

    Surface water, Land and soil, Monitoring and reporting
  25. Page 25

    Permit OFFICIAL Environmental Authority EPML00879413 E16 A report outlining the findings of the REMP, including all monitoring results and interpretations in accordance with conditions E15 must be prepared and submitted in writing to the administering authority by 1 May 2015 and thereafter every 12 months. This should include an assessment of reference water quality, any assimilative capacity for those contaminants monitored and the suitability of current discharge limits to protect downstream environment values. Monitoring of Water Storage Quality E17 Water storages stated in Table E7 (Water Storage Monitoring) must be monitored for the water quality characteristics specified in Table E8 (Onsite Water Storage Contaminant Limits) at the monitoring locations and at the monitoring frequency specified in Table E7 (Water Storage Monitoring). E18 In the event that waters storages defined in Table E7 (Water Storage Monitoring) exceed the contaminant limits defined in Table E8 (Onsite Water Storage Contaminant Limits), the holder of the environmental authority must implement measures to prevent access to waters by all livestock and minimise access by native fauna. Table E7 (Water Storage Monitoring) Water Storage Central Peg Central Peg Monitoring Frequency of Description Coordinates Coordinates Location Monitoring Stormwater Dam Easting Northing 440418; 7730687 Quarterly (GDA94 MGA (GDA94 MGA Zone 55) Zone 55) 440567 7730716 Madigans Dam 441708 7729948 444621; 7730090 Quarterly 444109 7727491 444164; 7727501 Quarterly Vera Dam 443221 7730489 443231, 7730449 Quarterly A Lode Dam 443375 7730601 443460; 7730576 Quarterly Sam's Dam Sump Below Scott 441866 7731252 441861; 7731241 Quarterly Lode Waste Rock 440986 7729985 440950; 7730025 445064 7726786 445067; 7726776 Quarterly Dump 445087 7727039 445071; 7727058 Quarterly Raw Water Dam Quarterly Turkeys nest Lynne Dam Table E8 (Onsite Water Storage Contaminant Limits) Parameter Unit Test Value Contaminant Limit pH pH unit Range Greater than 5.5, less than 93 EC -S/cm Maximum 59701 Sulphate mg/L Maximum 10001 TDS4 mg/L Maximum 4000 Arsenic mg/L Maximum 0.51

    Surface water, Regulated structures, Waste, Biodiversity, Monitoring and reporting
  26. Page 26

    Permit OFFICIAL Environmental Authority EPML00879413 Parameter Unit Test Value Contaminant Limit Cadmium mg/L Maximum 0.011 Copper mg/L Maximum 11 Lead mg/L Maximum 0.11 Mercury mg/L Maximum 0.0021 Nickel mg/L Maximum 11 Zinc mg/L Maximum 201 WAD Cyanide mg/L Maximum 0.21 Faecal coliforms5 CFU/100ml Maximum 1001 Nitrite5 mg/L Maximum 301 1. Contaminant limit based on ANZECC (2000) stock water quality guidelines. Note: Analysis for total metal concentrations. 2. Contaminant limit based on the Australia Government's draft Sodium Cyanide Assessment Report (September 2009). 3. This range was proposed by NQM Environmental Management Plan May 2010, provided by NQM Gold 4. Total dissolved solids. 5. These limits will apply to water stored in A Lode Dam only RP5 as specified in Table E1. Groundwater E19 Groundwater quality and level must be monitored at the locations and frequencies defined in Table E9 (Groundwater Monitoring Locations and Frequency) for parameters identified in Table E10 (Groundwater contaminant and trigger limits). E20 Groundwaters from bores identified in Table E9 (Groundwater Monitoring Locations and Frequency), must not exceed any of the contaminant limits defined in Table E10 (Groundwater contaminant and trigger limits). E21 The holder of this environmental authority must develop and submit a groundwater monitoring program to the administering authority within twelve (12) months from the date of issue of this environmental authority. E22 The groundwater monitoring program required in Condition E21 must include: a) proposed groundwater monitoring bore locations; b) justification of the proposed groundwater monitoring locations, including, but not limited to; (i) providing a sufficient number of background/reference monitoring sites, that are unaffected by the mining activities authorised under this environmental authority to allow scientifically justifiable conclusions on the level of impact from the mining activities; (ii) base flow assessment of all water courses affected by mining activities; and (iii) sufficient number of monitoring bores to enable early detection of any potential groundwater contamination. c) monitoring of groundwater that includes sufficient number of monitoring bores which provides sufficient spatial coverage to enable scientifically justifiable conclusions in relation to potential environmental impacts from mining activities; d) monitoring of physical and chemical parameters, to enable scientifically justifiable conclusions in

    Groundwater, Regulated structures, Monitoring and reporting
  27. Page 27

    Permit OFFICIAL Environmental Authority EPML00879413 relation to potential environmental impacts from mining activities; e) the development of baseline groundwater information, including quality, groundwater flow direction and rate and hydraulic conductivity. In addition, consideration must be given to how these parameters may change during the life of the mining project. f) characterisation of the potential impacts to the local groundwater system arising from mining activities; g) representative groundwater samples for the aquifers being sampled; h) bore construction details; and i) include a conceptual groundwater model. j) monitoring of groundwater levels to detect any impacts from the activity. E23 The groundwater monitoring program developed in accordance with Condition E21 must be independently certified by an appropriately qualified person as meeting the requirements of Condition E22 (above). E24 The groundwater monitoring program developed in accordance with Condition E21 must be implemented. E25 The groundwater monitoring program must be reviewed and updated by an appropriately qualified person by 1 May 2019, and every three years thereafter to ensure that proper and effective measures, practices or procedures are in place so that the mine is operated in accordance with the conditions of this environmental authority and that environmental harm to groundwaters is prevented or minimised. E26 A report detailing the review in condition E25 must be provided to the administering authority within 30 days of the completion of the review. The report must comment on monitoring program design and recommended any necessary or desirable changes to monitoring locations, parameters, triggers and contaminant limits as contained in this environmental authority. Such recommendations should be provided with scientific justification. E27 Groundwater monitoring bores must be constructed and operated in accordance with methods prescribed in the latest edition of the Agriculture and Resource Management Council of Australia and New Zealand manual titled Minimum Construction Requirements for Water Bores in Australia. E28 Annual groundwater monitoring reports analysing groundwater chemistry and hydro-geological status of all groundwater bores and groundwater conditions must be prepared and provided on request. E29 Groundwater levels must be monitored and groundwater level fluctuations in excess of 2m per year, (not resulting from the pumping of licensed bores) must be reported to the administering authority within 14 days following completion of monitoring.

    Groundwater, Monitoring and reporting
  28. Page 28

    Permit OFFICIAL Environmental Authority EPML00879413 Table E9 - Groundwater monitoring locations and frequency Location Monitoring (MGA94 - Zone 55) Monitoring Surface Depth Screen(s) Frequency Point RL (m)1 (m) (m) Aquifer Standing Ground Easting Northing Water water Level Quality Reference Bores2 Tertiary Sediments and Molly Darling Sandstone 7D 441729.85 7732119.534 Sandstone 281.821 32.3 13-32.2 PW655 MB19 Sandstone 429576 7741047 (Britannia 330 84 60 - 84 Monthly2 Monthly2 Borefield) 441789.818 7733195.396 Andesite 270.705 71 56-68 Vera-Nancy Volcanics MB7 445931 7726641 Volcanics TBA 40.0 28.0 MB18 444653 7728265 Andesite 283.522 64 58-64 Monthly2 56 Monthly2 124 44-56 MB20 441156.521 7728115.809 Sandstone 348.848 35 119.5 61-79 JA02A 441847.8 7730283 Volcanics 350.860 56 29-35 Every 12 65 hours LYN01 444399 7727211 Volcanics 288.53 107.5- Monthly2 65 119.5 Monthly2 50-56 LYN06 444635 7725405 Volcanics 299.72 11 Monthly2 Monthly2 55 52.5-55.5 LYN08 444440 7726630 Volcanics 292.43 65 Monthly2 Monthly2 60 441085.97 7729221.83 Deep 367.196 60 441859 7729480 42 TSF2-06D weathered 15 Monthly2 Monthly2 TSF2-07D (Mt Janet 60 20 Andesite) Deep 370.27 48-51 weathered Monthly2 Monthly2 (Mt Janet Andesite) Compliance Bores Tertiary Sediments and Molly Darling Sandstone 13S* 440956 7730789 Tertiary 322 5-10 N/A Sediments 4D TSF 440102.365 7730670.568 Volcanics 312.940 30-55 5D 440493.558 7730962.118 Volcanics 316.057 30-65 6D 440809.309 7731116.984 Sandstone 317.040 30-60 Saprolite 8D5 440517.861 7730813.836 (70 Mile 318.573 36-56.9 Range Group) 10D 441906.379 7731449.712 Volcanics 293.310 19-42 Quarterly Quarterly 7-15 MB9S 441990.938 Molly 306.549 7731192.892 Darling Sandstone MB9D 441986.962 Molly 306.373 41-60 7731194.020 Darling 19-20 Sandstone MB23 4 441408.251 7730908.766 Tertiary 301.313 Sediments

    Groundwater, Land and soil, Monitoring and reporting
  29. Page 29

    Permit OFFICIAL Environmental Authority EPML00879413 Location Monitoring (MGA94 - Zone 55) Monitoring Surface Depth Screen(s) Frequency Point RL (m)1 (m) (m) Aquifer Standing Ground 20 19-20 Easting Northing 70 Water water Level Quality MB244 440817.914 7729845.709 Tertiary 341.411 7728727.02 Sediments 289.82 JMB0026 444041.02 62-68 Tertiary 318.215 Sediments 294.189 Vera-Nancy Volcanics 336.73 324.123 MB2 442455.79 7730119.37 Pajingo 305.456 140 75-140 volcanics 285.582 MB4D SLP 443109.365 7730384.162 337.730 98 86-98 7730153.39 (minor 281.9 MB5 442222.95 7729954.865 quartz) 352.201 94 82-88 MB14 443275.206 7730035.223 Volcanics MB15 442960.973 7728062.021 and Molly 311 92.5 80-92.5 MB25 444580.699 7730305.000 Darling 279.16 7728252.41 Sandstone 50 38.5-50 Quarterly Quarterly JA05 442120.900 Andesite 283 7728234 Andesite 347.555 60 52-58 7728187 Andesite 7727055 Andesite 346.339 23 8-23 7727028 JMB0027 444646.42 Andesite 358.755 17 12-15 7730018.15 JAN10 442964 Vera- 267.09 68 62-68 Monthly2 Monthly2 VEN09 443817 7729960.50 Nancy 138.8 126.8- Monthly2 Monthly2 LYN02 445246 Volcanics 138.8 LYN03 7729414.55 Volcanics 77 65-77 445257 Volcanics 47.5 41.5-47.5 TSF2-03D 441577.40 Volcanics 65 49-52 Monthly2 Monthly2 TSF2-04D 441227.29 Weathered 65 86-89 Monthly2 Monthly2 Volcanics TSF2-05D 441130.14 65 56-59 Monthly2 Monthly2 Deep weathered (Mt Janet Andesite) Deep weathered (Mt Janet Andesite) Deep weathered (Mt Janet Andesite) Doongara Foundation LYN07 445764 7724800 Clay 106.5 94.5-106.5 Monthly2 Monthly2 Observation Bores Vera-Nancy Volcanics JA016,A 441921.295 7730272.612 Volcanics 350.965 96.5 78 - 90.5 Every 12 Quarterly BP1-14D 441782.851 7729647.599 357.49 hours Deep TSF2-01D 441518.71 7729803.24 weathered 356.445 61 40-61 TSF2-02D 441336.06 7729558.03 (Mt Janet 362.876 Andesite) Monthly2 Monthly2 Deep 65 80-83 weathered (Mt Janet Monthly2 Monthly2 Andesite) 65 63-66 Monthly2 Monthly2 Deep weathered

    Groundwater, Land and soil, Monitoring and reporting
  30. Page 30

    Permit OFFICIAL Environmental Authority EPML00879413 Location Monitoring (MGA94 - Zone 55) Monitoring Surface Depth Screen(s) Frequency Point RL (m)1 (m) (m) Aquifer Standing Ground Easting Northing (Mt Janet Water water Andesite) Level Quality Cainozoic Basalt LYN05 445412 7725007 Basalt 274.98 86 56-86 Monthly2 Monthly2 Tertiary Sediments BP1-15M 441602.71 7729188.207 Tertiary 382.48 31 20-31 Monthly2 Monthly2 Sediments 20-31 Monthly2 Monthly2 20-31 Monthly2 Monthly2 BP1-14M 441781.852 7729621.64 Tertiary 359.45 31 5-11 Monthly2 Monthly2 Sediments 54-57 Monthly2 Monthly2 BP1-16M 441621.49 7729819.521 Tertiary 356.09 31 Sediments BP1-16S 441653.925 7729811.177 Tertiary 354.97 11 Sediments TSF2-02M 441338.12 7729565.78 Tertiary 363.134 30 Sediments 1. RL measurement to be taken from top of bore casing 2. Will revert to a monitoring frequency of quarterly after 24 months of data collection. 4. Location to be confirmed when installed. 5. Subject to meeting bore construction requirements. 6. The purpose of this bore is early detection of seepage from Janet A Pit. Only SWL, field parameters, major ions and total cyanide are required to be measured. Water level measurement to be taken from top of bore casing. A pump back system must be fitted if seepage from Janet A Pit is detected. A. Standing water level must be measured every 12 hours using digital loggers in these bores. *. Measure standing water level only.

    Groundwater, Land and soil, Monitoring and reporting
  31. Page 31

    Permit OFFICIAL Environmental Authority EPML00879413 Table E10 - Groundwater contaminant and trigger limits Quality Units Contaminant trigger level Contaminant limit Characteristic (S/cm) Electrical pH Units 435 or N/A Conductivity mg/L 80th percentile of reference4,5 pH (pH Unit) mg/L mg/L 6.0 (minimum) or 5.0 (minimum)1 or 5th percentile of reference Hardness mg/L 20th percentile of reference4,5 sites2, whichever is higher Sulphate (SO42-) mg/L Arsenic mg/L 7.0 (maximum) or mg/L Cadmium mg/L 80th percentile of reference4,5 9.0 (maximum)1 or 95th percentile of mg/L Copper mg/L reference sites2, whichever is lower mg/L Chromium mg/L For interpretation purposes only mg/L Lead 80th percentile of the reference4 1000 (mg/L)1 or 95th percentile of reference sites2, whichever is lower Mercury 0.013 (mg/L) 3 or 80th percentile of reference4,5 0.5 (mg/L)1 as total metals and Molybdenum 95th percentile of reference sites2 as Nickel 0.0002 (mg/L) 3 or 80th percentile of reference4,5 dissolved metals Selenium 0.01 (mg/L)1 as total metals and 0.0014 (mg/L) 3 or 95th percentile of reference sites2 as Zinc 80th percentile of reference4,5 dissolved metals Cyanide (WAD) 0.001 (mg/L) 3 or 1 (mg/L)1 as total metals and 80th percentile of reference4,5 95th percentile of reference sites2 as 0.0034 (mg/L) 3 or dissolved metals 80th percentile of reference4,5 1 (mg/L)1 as total metals and 95th percentile of reference sites2 as 0.0006 (mg/L) 3 or 80th percentile of reference4,5 dissolved metals 0.1 (mg/L)1 as total metals and 80th percentile of the reference4 95th percentile of reference sites2 as 0.011 (mg/L) 3 or dissolved metals 80th percentile of reference4,5 0.002 (mg/L)1 as total metals and 95th percentile of reference sites2 as 0.011 (mg/L) 3 or 80th percentile of reference4,5 dissolved metals 0.15 (mg/L)1 as total metals and 0.008 (mg/L) 3 or 95th percentile of reference sites2 80th percentile of reference4,5 1 (mg/L)1 as total metals and For interpretation only 95th percentile of reference sites2 as dissolved metals 0.02 (mg/L)1 as total metals and 95th percentile of reference sites2 as dissolved metals 20 (mg/L)1 as total metals and 95th percentile of reference sites2 as dissolved metals For interpretation only Cyanide (Free) 7 (g/L) 3 or 0.5(mg/L)1 or 80th percentile of reference4,5 95th percentile of reference sites2, whichever is lower Total nitrogen6 mg/L as 80th percentile of the reference4 95% of reference site2 nitrogen Total phosphorous6 mg/L as 80th percentile of the reference4 95% of reference site2 phosphorous 1. These limits taken from the Pajingo Gold Mine Environmental Management Plan May 2010 provided by NQM Gold. 2. where 95th percentile of reference is exceeded and the reference site also exceeds the value during the same event, the value of the reference site during the same event applies as the groundwater contaminant limit. 3. ANZECC (2000) trigger levels for aquatic ecosystems of slightly disturbed tropical Australian upland rivers (95% level of protection). 4. Trigger levels based on percentiles are derived using ANZECC (2000) methodology and are based on the reference sites defined in Schedule E Table E9. 5. 80th percentile of reference values apply only when sufficient monitoring data is available (see footnote 4). 6. This analysis is only required for monitoring bores installed directly down gradient of A Lode Dam.

    Groundwater, Regulated structures, Monitoring and reporting
  32. Page 32

    Permit OFFICIAL Environmental Authority EPML00879413 E30 If quality characteristics of the groundwater monitoring exceed any of the trigger levels specified in Table E10 (Groundwater contaminant and trigger limits) the environmental authority holder must compare the results of the impact site to the data from reference monitoring sites and: (a) if the level of contaminants at the downstream site does not exceed the reference monitoring site data, then no action is to be taken; or (b) if the level of contaminants at the downstream site is greater than the reference monitoring site data, complete an investigation in accordance with the ANZECC & ARMCANZ 2000 methodology, into the potential for environmental harm and provide a written report to the administering authority within 3 months, outlining: (i) details of the investigations carried out; and (ii) actions taken to prevent environmental harm. Note: Where an exceedance of a trigger level has occurred and is being investigated, in accordance with E30 b (ii) of this condition, no further reporting is required for subsequent trigger events for that quality characteristic within the three month investigation period. Water General E31 All determinations of water quality must be: a) performed by a person or body possessing appropriate experience and qualifications to perform the required measurements; b) made in accordance with methods prescribed in the latest edition of the administering authority's monitoring and sampling manual; c) collected from the monitoring locations identified within this environmental authority, within 12 hours of each other where possible; and d) carried out on representative samples. e) laboratory testing must be undertaken using a laboratory accredited (e.g. NATA) for the method of analysis being used. Water release events E32 For any water release event the authority holder must notify the administering authority as soon as possible (no later than six (6) hours of having commenced releasing mine affected water to the receiving environment) and provide the following information: (a) release commencement date/time; (b) expected release cessation date/time; (c) release point/s; (d) release volume (estimated); (e) receiving water/s including the natural flow rate; and (f) any details (including available data) regarding likely impacts on the receiving water(s). (g) notification of persons who may be affected by the event has occurred/is being undertaken. Note: Notification to the administering authority must be addressed to the Manager and Project Manager of the local administering authority via phone, e-mail or facsimile.

    Groundwater, Surface water, Monitoring and reporting
  33. Page 33

    Permit OFFICIAL Environmental Authority EPML00879413 E33 The authority holder must notify the administering authority as soon as possible (within twenty-four (24) hours) of the cessation of a water release event and then within 28 days provide the following information in writing: (a) release cessation date/time; (b) the reason for the release; (c) the location of the release; (d) natural flow volume in receiving water; (e) an estimate of the volume of water released; (f) all water quality monitoring results; (g) details regarding the compliance of the release with the conditions of this environmental authority (i.e. contamination limits); (h) any general observations; (i) all calculations; (j) any other matters pertinent to the water release event. E34 The release of contaminants directly or indirectly to waters: (a) must not produce any visible discolouration of receiving waters; nor (b) must not produce any slick or other visible or odorous evidence of oil, grease or petrochemicals nor contain visible floating oil, grease, scum, litter or other objectionable matter. Annual Water Monitoring Reporting E35 The following information must be recorded in relation to all water monitoring required under the conditions of this environmental authority and submitted to the administering authority on request: (a) the date on which the sample was taken; (b) the time at which the sample was taken; (c) the monitoring point at which the sample was taken; (d) the measured or estimated daily quantity of the contaminants released from all release points; (e) the release flow rate at the time of sampling for each release point; (f) the results of all monitoring and details of any exceedances with the conditions of this environmental authority; and (g) water quality monitoring data must be provided to the administering authority in the specified electronic format upon request.

    Surface water, Monitoring and reporting
  34. Page 34

    Permit OFFICIAL Environmental Authority EPML00879413 Water Management Plan E36 The holder of the environmental authority must implement a Water Management Plan that provides for the proper and effective management of the actual and potential environmental impacts resulting from the mining activity and to ensure compliance with the conditions of this environmental authority. E37 The Water Management Plan must be developed in accordance with Administering Authority Guideline for Preparing a Water Management Plan 2009 or any updates that become available from time to time and must include at least the following components: (a) Contaminant Source Study; (b) Site Water Balance and Model; (c) Water Management System; (d) Saline and Metalliferous Drainage Prevention and Management Measures; (e) Acid Rock Drainage Prevention and Management Measures (if applicable); (f) Emergency and Contingency Planning; (g) Monitoring and Review. E38 Each year the holder of the environmental authority must undertake a review of the Water Management Plan prior to the wet season (and no later than 1 November) and a further review following the wet season (i.e. by 1 May the following year) to ensure that proper and effective measures, practices or procedures are in place so that the mine is operated in accordance with the conditions of this environmental authority and that environmental harm is prevented or minimised. E39 A copy of the Water Management Plan and/or a review of the Water Management Plan must be provided to the administering authority on request. Saline, acid rock and metalliferous drainage E40 The holder of this environmental authority must ensure proper and effective measures are taken to avoid or otherwise minimise the generation and/or release of saline, acid rock and/or metalliferous drainage. Stormwater, Sediment and Erosion controls E41 An Erosion and Sediment Control Plan must be developed and certified by an appropriately qualified person and implemented for all stages of the mining activities on the site to prevent or minimise erosion and the release of sediment to receiving waters and the contamination of storm water. E42 The Erosion and Sediment Control Plan must be included in each subsequent Plans of Operations and provide for at least the following stormwater management functions: (a) Prevent or minimise the contamination of stormwater; (b) diverting uncontaminated stormwater run-off around areas disturbed by mining activities or where contaminants or wastes are stored or handled; (c) contaminated stormwater runoff, incident rainfall and leachate is collected; and treated, reused, or released in accordance with the conditions of this environmental authority; (d) roofing or minimising the size of areas where contaminants or wastes are stored or handled; (e) using alternate materials and or processes (such as dry absorbents) to clean up spills that will minimise the generation of contaminated waters, and; (f) erosion and sediment control structures are placed to minimise erosion of disturbed areas and prevent the contamination of any waters.

    Surface water, Waste, Land and soil, Monitoring and reporting
  35. Page 35

    Permit OFFICIAL Environmental Authority EPML00879413 (g) Procedures to ensure that erosion and sediment control structures are maintained and adequate storage is available in sediment dams in accordance with design criteria. (h) training of staff that will be responsible for maintenance and operations of sediment and erosion control structures. E43 Erosion protection measures and sediment control measures must be implemented and maintained to minimise erosion and the release of sediment and contamination of storm water. E44 The maintenance and cleaning of any vehicles, plant or equipment must not be carried out in areas from which contaminants can be released into any receiving waters. E45 Any spillage of wastes, contaminants or other materials must be cleaned up as quickly as practicable to minimise the release of wastes, contaminants or materials to any storm water drainage system or receiving waters. Water Reuse E46 Water at the mine site may be piped, trucked or transferred for the purpose of supplying livestock water to directly adjoining properties or a third party. E47 Water used to supply livestock drinking in accordance with E46 must: (a) meet the quality limits specified in Schedule E - Table E8 (Onsite Water Storage Contaminant Limits); and (b) comply with all other conditions of this approval. E48 Water to be used for livestock watering purposes under condition E46, must be contained within a storage facility (tank or dam) such that it is not directly or indirectly released to the receiving environment. E49 The volume and quality of water supplied under condition E46 must be monitored and recorded. The quality parameters must include at a minimum, those listed in Schedule E - Table E8 (Onsite Water Storage Contaminant Limits). E50 If the responsibility of water from the mine site (the water) is given or transferred to another person in accordance with this environmental authority: (a) The responsibility of the water must only be given or transferred in accordance with a written agreement (the third party agreement); (b) The written agreement must require the recipient of the water not to use that water in a manner which would contravene a government standard, legalisation or policy or a condition of this environmental authority; (c) The agreement must highlight that the use of contaminated water for stock must not be used in contravention of any food safety standards; and (d) Include in the third party agreement a commitment from the person utilising the water to use water in such a way as to prevent environmental harm or public health incidences and specifically make the persons aware of the General Environmental Duty (GED) under section 319 of the Environmental Protection Act 1994, environmental sustainability of the water disposal and protection of environmental values and waters.

    Surface water, Regulated structures, Waste, Land and soil, Monitoring and reporting
  36. Page 36

    Permit OFFICIAL Environmental Authority EPML00879413 E51 A copy of the third party agreement referred to in condition E50 must be provided to the administering authority upon request. Janine East Pit E52 The holder of the environmental authority must not release from RP19 until site specific release limits in accordance with condition E53 have been set. E53 By 5 April 2020, the holder of the environmental authority must provide the administering authority site specific release limits that meet the requirements of Table E3. The site specific release limits must be determined in accordance with the Technical guideline - Licensing - Wastewater release to Queensland E54 The mining activities must not cause environmental harm to any groundwater dependent ecosystems. Residual Voids E55 By 30 March 2028 a revised closure water balance model and geochemical model must be developed by an appropriately qualified person. E56 The water balance model required under Condition E55 must: (a) Be informed by sufficient data points to achieve high confidence in model outputs (b) Use geometry and borehole data to estimate retained volumes; (c) Include catchment gauging to establish runoff values; and (d) Predict long-term pit water levels. E57 The geochemical model required under Condition E55 must: (a) Be informed by quarterly water sampling results; (b) Include kinetic testing to identify pit wall solute release rates; and (c) Predict long-term pit water quality. E58 The water balance model and geochemical model required in Condition E55 must be maintained and updated to ensure compliance with the EA for operational and post-mining activities. END OF CONDITIONS FOR SCHEDULE E

    Groundwater
  37. Page 37

    Permit OFFICIAL Environmental Authority EPML00879413 Schedule F - Biodiversity Biodiversity offsets F1 Significant residual impacts to prescribed environmental matters, other than if the impacts were authorised by an existing authority issued before the commencement of the Environmental Offsets Act 2014, are not authorised under this environmental authority or the Environmental Offsets Act 2014. F2 Records demonstrating that each impact to a prescribed environmental matter did not, or is not likely to, result in a significant residual impact to that matter must be: a) Completed by an appropriately qualified person; and b) Kept for the life of the environmental authority. END OF CONDITIONS FOR SCHEDULE F

    Biodiversity, Monitoring and reporting
  38. Page 38

    Permit OFFICIAL Environmental Authority EPML00879413 Schedule G - Land and Rehabilitation G1 The environmental authority holder must rehabilitate all land disturbed by the mining activities in a manner that ensures rehabilitated areas achieve the following rehabilitation objectives: a) Safe for humans and wildlife; b) Non-polluting; c) Stable; d) Able to sustain an agreed land outcome as defined in Table G1; e) Revegetated with species endemic to the area with no declared pest species; and f) Compliant with all conditions of this environmental authority. Table G1 - (Land outcomes) Mine Domain Mine Feature Location (MGA94, Land Outcomes Name zone 55) Native ecosystem Tailings Storage 440890 7730335 Facility (TSF1) Native ecosystem Tailings Storage 441491 7729611 Facility 2 (TSF2) Light/intermittent grazing Sump 1 (TSF2) 441718 7730185 Light/intermittent Dams Sump 2 (TSF2) 441488 7729963 grazing Scott Lode Pit 442769 7730189 Native ecosystem Stormwater dam 440567 7730716 Water storage Madigan's dam 441708 7729948 Water storage 443221 7730489 Water storage A Lode dam 443375 7730601 Water storage Sam's dam 441866 7731252 Water storage SL WRD Sump 443508 7728461 Light/intermittent Nancy dam grazing 444109 7727491 Vera dam 440986 7729985 Water storage Raw Water Dam Water storage 441169 7730623 Light/intermittent Cave Seep Pit 441932 7730645 grazing Scott Lode WRD Native ecosystem 443476 7729183 Light/intermittent Cindy WRD grazing Waste Vera WRD 443871 7727624 Light/intermittent Janet A/K PAF 442267 7730213 grazing WRD Light/intermittent Venue NAF WRD 443512 7727807 grazing Light/intermittent grazing

    Rehabilitation, Surface water, Regulated structures, Waste
  39. Page 39

    Permit OFFICIAL Environmental Authority EPML00879413 Mine Domain Mine Feature Location (MGA94, Land Outcomes Name zone 55) Light/intermittent Venue PAF 443393 7728069 grazing Footprint Vera Landfill 443588 7727574 Light/intermittent Processing grazing Landfill 440876 7729597 Site Landfill Light/intermittent Irrigation area - 441090 7730050 grazing Mill 441180 7729840 Light/intermittent Irrigation area - grazing 444210 7727921 Vera Light/intermittent Anne temp WRD 442651 7729309 grazing Vera ROM 443718 7727675 Light/intermittent grazing Janet A ROM 441869 7730358 Light/intermittent Run of Mine Mill ROM 441074 7729560 grazing (ROM) Lynne Boxcut 445100 7726840 Light/intermittent Processing ROM grazing Area 445064 7726786 Turkeys Nest Light/intermittent Ancillary 445087 7727039 grazing Infrastructure Lynne Dam 441176 7729663 Light/intermittent grazing Mill 441497 7729882 Light/intermittent Exploration Core 444380 7729998 grazing Yard 443661 7728977 Light/intermittent Exploration grazing Outpost Various Cindy Light/intermittent Various grazing Infrastructure Access Roads / Various Light/intermittent grazing Tracks Various Bypass Haul Light/intermittent 443846 7729843 grazing Road Starlight B Haul Light/intermittent grazing Road Light/intermittent Lynne Haul Road grazing Surface Light/intermittent explosives area grazing Light/intermittent grazing Light/intermittent grazing Light/intermittent grazing Light/intermittent grazing

    Regulated structures
  40. Page 40

    Permit OFFICIAL Environmental Authority EPML00879413 Mine Domain Mine Feature Location (MGA94, Land Outcomes Name zone 55) Light/intermittent Cleared area 441626 7729302 grazing (previous borrow Various Light/intermittent pit) grazing Material 440299 7730135 Stockpiles Light/intermittent grazing TSF Borrow Pit Light/intermittent Laydown Yards Various grazing TBP1 Nancy Pit TBP1 TBP1 Nancy North Pit TBP1 Residual Void Orchid Pit 444544 7727912 (NUMA) Janine East 442904 7728129 Residual Void (NUMA) Janine Northwest 442807 7728376 Janet A Pit 442077 7730216 Light/intermittent Cindy Pit 443516 7728837 grazing Voids Vera Pit 444057 7727739 Native ecosystem Residual Void VNU Pit2 443853 7727909 (NUMA) Venue Pit2 443735 7728070 Light/intermittent Sue Pit 442807 7728520 grazing Janine North Pit 443009 7728248 Native ecosystem Janine Extension 443056 7728018 Native ecosystem 445601 7726994 Pit Residual Void Starlight B Pit (NUMA) Anne Pits 442280 7729551 Residual Void (NUMA) Vera 444246 7727865 Light/intermittent Mining Area Vent Fans Various grazing Powerlines Various Light/intermittent Venue Project 443474 7728398 grazing Light/intermittent grazing Light/intermittent grazing Light/intermittent grazing Light/intermittent grazing Light/intermittent grazing

  41. Page 41

    Permit OFFICIAL Environmental Authority EPML00879413 Mine Domain Mine Feature Location (MGA94, Land Outcomes Exploration Name zone 55) Various Light/intermittent Seismic Survey Various grazing Lynne Powerline Various Various Light/intermittent Stage 1 & 2 grazing Pajingo Site Light/intermittent Undisturbed Pajingo Site grazing Light/intermittent grazing 1. TBP - To be provided prior to commencement of mining activity 2. Venue Put and VNU pit are constructed as a single void G2 A Final Land Use Rehabilitation Plan (`FLURP') that describes how the rehabilitation objectives in condition G1 will be achieved must be developed, documented and implemented for all stages of the mining activity by 30 June 2017. The FLURP must at minimum include: a) Schematic representation of the proposed final land form inclusive of site drainage features; b) Details of proposed slope design and erosion and sediment controls; c) Proposed cover designs for encapsulation of waste material, including performance criteria; d) Proposed re-vegetation methods inclusive of plant species selection, propagation methods and establishment of suitable plant growth medium (i.e. top soil); e) Materials balance for all rehabilitation requirements including available top soil and material suitable for encapsulating waste in accordance with the proposed encapsulation methodology; f) Geotechnical, geochemical and hydrological studies necessary to demonstrate likely success of proposed rehabilitation methodology to achieve the required rehabilitation outcomes; g) An investigation of proposed residual voids including potential for generation/mobilisation of contaminants, potential pathways for release of contaminants to waters (including groundwater) and a long-term void water balance model; and h) A rehabilitation monitoring program sufficient to identify if required rehabilitation outcomes have been achieved. G3 Rehabilitation in accordance with condition G2 must commence progressively in accordance with the plan of operations. G4 Residual voids (including open pits and underground workings) must not cause any serious or material environmental harm, other than the environmental harm constituted by the existence of the residual void itself, subject to any other condition within this environmental authority. G5 All explosives, flammable or corrosive substances, hazardous chemicals, toxic substances, gases and dangerous goods must be stored and handled in accordance with: a) The current Australian Standard where applicable; or b) Where no relevant Australian Standard exists, store such materials within an on-site containment system sufficient to prevent release to the receiving environment. G6 Minimise the potential for contamination of land by hazardous contaminants. END OF CONDITIONS FOR SCHEDULE G

    Rehabilitation, Groundwater, Waste, Land and soil, Biodiversity, Monitoring and reporting
  42. Page 42

    Permit OFFICIAL Environmental Authority EPML00879413 Schedule H - Regulated Structures H1 The consequence category of any structure must be assessed by a suitably qualified and experienced person in accordance with the Manual for assessing consequence categories and hydraulic performance of structures a) Prior to the construction of the structure, if it is not an existing structure; or b) If it is an existing structure, by 27 January 2017; or c) Prior to any change in its purpose or the nature of its stored contents. H2 A consequence assessment report and certification must be prepared for each structure assessed and the report may include a consequence assessment for more than one structure. H3 Certification must be provided by the suitably qualified and experienced person who undertook the assessment, in the form set out in the Manual for assessing consequence categories and hydraulic Design and construction of a regulated structure H4 Conditions H5 to H9 inclusive do not apply to existing structures. H5 All regulated structures must be designed by, and constructed under the supervision of, a suitably qualified and experienced person in accordance with the requirements of the Manual for assessing consequence H6 Construction of a regulated structure is prohibited unless the environmental authority holder has submitted to the administering authority and 28 days have elapsed, the following: a) a consequence category assessment report, as required by condition H2, and b) the suitably qualified and experienced person certified design and design plan; and c) the associated suitably qualified and experienced person certified operating procedures. H7 Certification must be provided by the suitably qualified and experienced person who oversees the preparation of the design plan in the form set out in the Manual for assessing consequence categories and hydraulic H8 Regulated structures must: a) be designed and constructed in accordance with and conform to the requirements of the Manual for b) be designed and constructed with due consideration given to ensuring that the design integrity would not be compromised on account of: i) floodwaters from entering the regulated structure from any watercourse or drainage line; and ii) wall failure due to erosion by floodwaters arising from any watercourse or drainage line. H9 Certification by the suitably qualified and experienced person who supervises the construction must be submitted to the administering authority within 10 days of the completion of construction of the regulated structure, and state that: a) the 'as constructed' drawings and specifications meet the original intent of the design plan for that regulated structure; b) construction of the regulated structure is in accordance with the design plan. Operation of a regulated structure H10 Operation of a regulated structure must not commence unless the environmental authority holder has

    Surface water, Regulated structures, Land and soil, Monitoring and reporting
  43. Page 43

    Permit OFFICIAL Environmental Authority EPML00879413 submitted to the administering authority: a) One electronic copy of the design plan and certification of the `design plan' in accordance with condition H7, and b) A set of `as constructed' drawings and specifications, and c) Certification of those `as constructed drawings and specifications' in accordance with condition H9, and d) Where the regulated structure is to be managed as part of an integrated containment system for the purpose of sharing the design storage allowance (DSA) volume across the system, a copy of the certified system design plan; e) A statement that confirms: i. The requirements of this authority relating to the construction of the regulated structure have been met; ii. The details required under this authority, have been entered into a Register of Regulated Structures; and iii. There is a current operational plan for the regulated structures. H11 For existing structures that are regulated structures: a) where the existing structure that is a regulated structure is managed as part of an integrated containment system for the purpose of sharing the DSA volume across the system, the environmental authority holder must submit to the administering authority within three (3) months of the commencement of this condition a copy of the certified system design plan including that structure; and b) There must be a current operational plan for the existing structures. H12 Each regulated structure must be maintained and operated, for the duration of its operational life until decommissioned and rehabilitated, in a manner that is consistent with the current operational plan and, if applicable, the current design plan and associated certified `as constructed' drawings. Mandatory reporting level H13 Conditions H14 to H17 inclusive only apply to Regulated Structures which have not been certified as low consequence category for `failure to contain - overtopping'. H14 The Mandatory Reporting Level (the MRL) specified in Table H1 must be marked on a regulated structure in such a way that during routine inspections of that structure, it is clearly observable. H15 The environmental authority holder must, as soon as practical and within forty-eight (48) hours of becoming aware, notify the administering authority when the level of the contents of a regulated structure reaches the MRL. H16 The environmental authority holder must, immediately on becoming aware that the MRL has been reached, act to prevent the occurrence of any unauthorised discharge from the regulated structure. 17 The environmental authority holder must record any changes to the MRL in Table H1 and in the Register of Regulated Structures.

    Rehabilitation, Regulated structures, Monitoring and reporting
  44. Page 44

    Permit OFFICIAL Environmental Authority EPML00879413 Design storage allowance H18 The environmental authority holder must assess the performance of each regulated structure or linked containment system over the preceding November to May period based on actual observations of the available storage in each regulated structure or linked containment system taken prior to 1 July of each year. H19 By 1 November of each year, storage capacity must be available in each regulated structure (or network of linked containment systems with a shared DSA volume), to meet the Design Storage Allowance (DSA) volume for the structure (or network of linked containment systems), as specified in Table H1. H20 The environmental authority holder must, as soon as possible and within forty-eight (48) hours of becoming aware that the regulated structure (or network of linked containment systems) will not have the available storage to meet the DSA volume on 1 November of any year, notify the administering authority. H21 The environmental authority holder must, immediately on becoming aware that a regulated structure (or network of linked containment systems) will not have the available storage to meet the DSA volume on 1 November of any year, act to prevent the occurrence of any unauthorised discharge from the regulated structure or linked containment systems. Annual inspection report H22 Each regulated structure must be inspected each calendar year by a suitably qualified and experienced person. H23 At each annual inspection, the condition and adequacy of all components of the regulated structure must be assessed and a suitably qualified and experienced person must prepare an annual inspection report containing details of the assessment and include recommended actions, if applicable, to ensure the integrity of the regulated structure. H24 The suitably qualified and experienced person who prepared the annual inspection report must certify the report in accordance with the Manual for assessing consequence categories and hydraulic performance of H25 The environmental authority holder must within 20 business days of receipt of the annual inspection report, provide to the administering authority: a) The recommendations section of the annual inspection report; and b) If applicable, any details of any actions being taken in response to those recommendations. Transfer arrangements H26 The environmental authority holder must provide a copy of any reports, documentation and certifications prepared under this authority, including but not limited to any Register of Regulated Structures, consequence assessment, design plan and other supporting documentation, to a new holder on transfer of this authority. Decommissioning and rehabilitation H27 Regulated structures and structures must not be abandoned but must be decommissioned and rehabilitated to achieve compliance with conditions G1 and G2 of this environmental authority. Transitional Arrangements H28 All existing structures that have not been assessed in accordance with the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635) must be assessed and certified in accordance with the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (EM635) by 27 January 2017. Hydraulic performance of regulated structures

    Rehabilitation, Regulated structures, Monitoring and reporting
  45. Page 45

    Permit OFFICIAL Environmental Authority EPML00879413 H29 Each regulated structure authorised by this environmental authority as specified in Schedule A - Table A1, must meet the hydraulic performance criteria listed in Table H1 for that structure. Table H1 - Hydraulic performance criteria (`Table H1') Name of Spillway Capacity Design Storage Mandatory Reporting Regulated Structure Consequence Allowance (DSA) Level (MRL) Purpose of Category structure Design mAHD Design mAHD Design mAHD Criteria Criteria Criteria The permanent containment of 1:100 3 tailings from month wet extraction and processing of season plus 1.05m 1:100 72 0.34m gold and silver hour below TSF1 High 1:1000 1312m RL process below storm spillway inputs for the spillway 3 month wet season TSF2 High 1:1000 1311.2m RL 1:100 3 2.7m 1:100 72 0.4m The permanent month wet below hour below containment of season plus spillway storm spillway (1308.5 (1310.8 tailings from process m RL) m RL) extraction and inputs for the processing of 3 month wet gold and silver season 1256.2m RL 1:100 3 month wet Scott Lode High 1:1000 season plus 1.54m 1:100 72 0.49m The permanent Pit below hour below containment of process spillway storm spillway inputs for the tailings from 3 month wet extraction and processing of season gold and silver TBD TBD TBD The permanent containment of Scott Lode High TBD TBD TBD Pit (5m tailings from extraction and downstream processing of raise) gold and silver Catchment for Nancy Dam Significant 1:100 To 1256.026m RL 1:20 3 month 1:100 72 seepage from 1:1000 1284.8m RL wet season hour Janet A and K plus process TBD storm TBD 1:1000 inputs for the Dump Janet A Pit Significant 3 month wet 1.05m 0.5metres below below The settling of season spillway 0.34m sediment from 1:100 3 below underground month wet season plus dewatering process process inputs for the The permanent containment of tailings and PAF waste rock

    Regulated structures, Waste, Land and soil, Monitoring and reporting
  46. Page 46

    Permit OFFICIAL Environmental Authority EPML00879413 Name of Spillway Capacity Design Storage Mandatory Reporting Regulated Structure Consequence Allowance (DSA) Level (MRL) Purpose of Category structure Design mAHD Design mAHD Design mAHD Criteria Criteria Criteria Catchment Venue pit and 3 month wet spillway spillway upper VNU pit season (waters transferred to 1220m RL Nancy dam Prevention of Venue Pit1 Not hazardous TBD TBD TBD TBD TBD rainfall to Underground underground VNU Pit1 Not hazardous TBD emergency TBD TBD TBD TBD egress Notes: TBD- To be determined based on the risk classification and the final certified design plans. 1- Venue Pit and VNU Pit are constructed as a single void H30 The hydraulic performance criteria specified in Table H1 are the minimum mandatory performance requirements; regulated structures must be managed in a manner that ensures compliance with all conditions of this environmental authority. H31 Notwithstanding any other condition of this environmental authority, a High Density Polyethylene (HDPE) Geomembrane liner system must be installed and maintained within TSF2, to prevent release of contaminants, including leachate, to land and waters. END OF CONDITIONS FOR SCHEDULE H

    Regulated structures, Waste, Monitoring and reporting
  47. Page 47

    Permit OFFICIAL Environmental Authority EPML00879413 Schedule I - Definitions Definitions Key terms and/or phrases used in this document are defined in this section. Where a term is not defined, the definition in the Environmental Protection Act 1994, its regulations or environmental protection policies must be used. If a word remains undefined it has its ordinary meaning. Word / Phrase Definition Acceptance criteria Means the measures by which actions implemented are deemed to be complete. The acceptance criteria indicate the success of the decommissioning and rehabilitation outcomes or remediation of areas which have been significantly disturbed by the mining activities. Acceptance criteria may include information regarding: a) Stability of final land forms in terms of settlement, erosion, weathering, pondage and drainage; b) Control of geochemical and contaminant transport processes; c) Quality of runoff waters and potential impact on receiving environment; d) Vegetation establishment, survival and succession; e) Vegetation productivity, sustained growth and structure development; f) Fauna colonisation and habitat development; g) Ecosystem processes such as soil development and nutrient cycling, and the recolonisation of specific fauna groups such as collembola, mites and termites which are involved in these processes; h) Microbiological studies including recolonisation by mycorrhizal fungi, microbial biomass and respiration; i) Effects of various establishment treatments such as deep ripping, topsoil handling, seeding and fertiliser application on vegetation growth and development; j) Resilience of vegetation to disease, insect attack, drought and fire; k) Vegetation water use and effects on ground water levels and catchment yields. Acid rock drainage Means any contaminated discharge emanating from a mining activity formed through a series of chemical and/or biological reactions. Administering Is the agency that administers the environmental authority provisions under the authority Environmental Protection Act 1994. Ambient (or total) At a place, means the level of noise at the place from all sources (near and far), noise measured as the Leq for an appropriate time interval. Annual exceedance The probability that at least one event in excess of a particular magnitude will occur in probability or AEP any given year. Appropriately Means a person who has professional qualifications, training, skills or experience qualified person relevant to the nominated subject matter and can give authoritative assessment, advice

    Rehabilitation, Noise and vibration, Land and soil, Biodiversity
  48. Page 48

    Permit OFFICIAL Environmental Authority EPML00879413 Word / Phrase Definition and analysis on performance relating to the subject matter using the relevant protocols, standards, methods or literature. Assessed or By a suitably qualified and experienced person in relation to a consequence assessment assessment of a dam, means that a statutory declaration has been made by that person and, when taken together with any attached or appended documents referenced in that declaration, all of the following aspects are addressed and are sufficient to allow an independent audit of the assessment: a) exactly what has been assessed and the precise nature of that determination; b) the relevant legislative, regulatory and technical criteria on which the assessment has been based; c) the relevant data and facts on which the assessment has been based, the source of that material, and the efforts made to obtain all relevant data and facts; and d) the reasoning on which the assessment has been based using the relevant data and facts, and the relevant criteria. Associated works In relation to a dam, means: a) Operations of any kind and all things constructed, erected or installed for that dam; and b) Any land used for those operations. Authority Means an environmental authority or a development approval. Available for Has the meaning in section 126D (5) of the Environmental Protection Act 1994. rehabilitation Background Means the average of samples taken prior to the commencement of mining from the same waterway that the current sample has been taken. Certification Means assessment and approval must be undertaken by a suitably qualified and experienced person in relation to any assessment or documentation required by this Manual, including design plans, `as constructed' drawings and specifications, construction, operation or an annual report regarding regulated structures, undertaken in accordance with the Board of Professional Engineers of Queensland Policy Certification by RPEQs (ID: 1.4 (2A)). Certifying, certify or By an appropriately qualified and experienced person in relation to a design plan or an certified annual report regarding dams/structures, means that a statutory declaration has been made by that person and, when taken together with any attached or appended documents referenced in that declaration, all of the following aspects are addressed and are sufficient to allow an independent audit at any time: a) exactly what is being certified and the precise nature of that certification b) the relevant legislative, regulatory and technical criteria on which the certification has been based

    Rehabilitation, Regulated structures, Monitoring and reporting
  49. Page 49

    Permit OFFICIAL Environmental Authority EPML00879413 Word / Phrase Definition Chemical c) the relevant data and facts on which the certification has been based, the Commercial place source of that material, and the efforts made to obtain all relevant data and Construction or facts constructed Consequence d) the reasoning on which the certification has been based using the relevant Consequence data and facts, and the relevant criteria. Means: a) An agricultural chemical product or veterinary chemical product within the meaning of the Agricultural and Veterinary Chemicals Code Act 1994 (Commonwealth); or b) A dangerous good under the dangerous goods code; or c) A lead hazardous substance within the meaning of the Workplace Health and Safety Regulation 1997; or d) A drug or poison in the Standard for the Uniform Scheduling of Drugs and Poisons prepared by the Australian Health Ministers' Advisory Council and published by the Commonwealth; or e) Any substance used as, or intended for use as - i. A pesticide, insecticide, fungicide, herbicide, rodenticide, nematocide, miticide, fumigant or related product; or ii. A surface active agent, including, for example, soap or related detergent; or iii. A paint solvent, pigment, dye, printing ink, industrial polish, adhesive, sealant, food additive, bleach, sanitiser, disinfectant, or biocide; or iv. A fertiliser for agricultural, horticultural or garden use; or f) A substance used for, or intended for use for - i. Mineral processing or treatment of metal, pulp and paper, textile, timber, water or wastewater; or ii. Manufacture of plastic or synthetic rubber. Means a workplace used as an office or for business or commercial purposes, which is not part of the mining activity and does not include employees' accommodation or public roads. In relation to a regulated structure includes building a new regulated structure and lifting or otherwise modifying an existing regulated structure, but does not include investigations and testing necessary for the purpose of preparing a design plan. In relation to a structure as defined, means the potential for environmental harm resulting from the collapse or failure of the structure to perform its primary purpose of containing, diverting or controlling flowable substances. Means a category, either low, significant or high, into which a dam is assessed as a result of the application of tables and other criteria in the Manual for assessing

    Regulated structures, Waste
  50. Page 50

    Permit OFFICIAL Environmental Authority EPML00879413 Word / Phrase Definition Dam Means a land-based structure or a void that contains, diverts or controls flowable substances, and includes any substances that are thereby contained, diverted or controlled by that land-based structure or void and associated works. Dam crest volume Means the volume of material (liquids and/or solids) that could be within the walls of a dam at any time when the upper level of that material is at the crest level of that dam. That is, the instantaneous maximum volume within the walls, without regard to flows entering or leaving (e.g. via spillway). Design plan Is a document setting out how all identified consequence scenarios are addressed in the planned design and operation of a regulated structure. Design storage Means an available volume, estimated in accordance with the Manual for assessing published by the administering authority, must be provided in a dam as at 1 November each year in order to prevent a discharge from that dam to an annual exceedance probability (AEP) specified in that Manual. Designer For the purposes of a regulated dam, means the certifier of the design plan for the regulated dam. EC Means Electrical Conductivity. Environmental Means the holder of this environmental authority or any other works conducted by authority holder another entity on the approved leases. Environmental Has the meaning in section 7 of the Environmental offsets Act 2014. offset Flowable substance Means matter or a mixture of materials which can flow under any conditions potentially affecting that substance. Constituents of a flowable substance can include water, other liquids fluids or solids, or a mixture that includes water and any other liquids fluids or solids either in solution or suspension. Foreseeable future Is the period used for assessing the total risk of an event occurring. Permanent structures and ecological sustainability should be expected to still exist at the end of a 150 year foreseeable future with an acceptable risk of failure before that time. Groundwater Means ecosystems which require access to groundwater on a permanent or dependent intermittent basis to meet all or some of their water requirements so as to maintain their ecosystem (GDE) communities of plants and animals, ecological processes and ecosystem services. For the purposes of the environmental authority, groundwater dependent ecosystems do not include those mapped as "unknown". Hazard In relation to a dam as defined, means the potential for environmental harm resulting from the collapse or failure of the dam to perform its primary purpose of containing,

    Groundwater, Regulated structures, Biodiversity
  51. Page 51

    Permit OFFICIAL Environmental Authority EPML00879413 Word / Phrase Definition diverting or controlling flowable substances. Hazard category Means a category, either low significant or high, into which a dam is assessed as a result of the application of tables and other criteria in the Manual for assessing Hazardous waste Means any substance, whether liquid, solid or gaseous, that tends to destroy life or impair or endanger health. Holder Means: a) Where this document is an environmental authority, any person who is the holder of, or is acting under, that environmental authority; or b) Where this document is a development approval, any person who is the registered operator for that development approval. Hydraulic Means the capacity of a regulated dam to contain or safely pass flowable substances performance based on the design criteria specified for the relevant consequence category in the Manual for assessing consequence categories and hydraulic performance of structures Infrastructure Means water storage dams, roads and tracks, buildings and other structures built for the purpose of mining activities. Land In the 'land schedule' of this document means land excluding waters and the atmosphere. Land capability As defined in the Technical Guidelines for the Environmental Management of Exploration and Mining in Queensland (DME 1995). Land suitability As defined in the Technical Guidelines for the Environmental Management of Exploration and Mining in Queensland (DME 1995). Land use Term to describe the selected post mining use of the land, which is planned to occur after the cessation of mining operations. Levee Means an embankment that only provides for the containment and diversion of stormwater or flood flows from a contributing catchment, or containment and diversion of flowable materials resulting from releases from other works, during the progress of those stormwater or flood flows or those releases; and does not store any significant volume of water or flowable substances at any other times. Low hazard dam Means any dam that is not a high or significant hazard category as assessed using the Manual for assessing consequence categories and hydraulic performance of structures Mandatory reporting Means a warning and reporting level determined in accordance with the criteria in the level or MRL Manual for assessing consequence categories and hydraulic performance of structures

    Surface water, Regulated structures, Waste, Monitoring and reporting
  52. Page 52

    Permit OFFICIAL Environmental Authority EPML00879413 Word / Phrase Definition Manual Measures Means the Manual for assessing consequence categories and hydraulic performance drainage Mineral Includes any measures to prevent or minimise environmental impacts of the activity such as bunds, silt fences, diversion drains, capping, and containment systems. Modification or modifying Means any waters, contaminated with metals / metalloids or other contaminants as a Natural flow result of the mining activities. Means a substance which normally occurs naturally as part of the earth's crust or is dissolved or suspended in water within or upon the earth's crust and includes a substance which may be extracted from such a substance, and includes-- a) clay if mined for use for its ceramic properties, kaolin and bentonite; b) foundry sand; c) hydrocarbons and other substances or matter occurring in association with shale or coal and necessarily mined, extracted, produced or released by or in connection with mining for shale or coal or for the purpose of enhancing the safety of current or future mining operations for coal or the extraction or production of mineral oil there from; d) limestone if mined for use for its chemical properties; e) marble; f) mineral oil or gas extracted or produced from shale or coal by in situ processes; g) peat; h) salt including brine; i) shale from which mineral oil may be extracted or produced; j) silica, including silica sand, if mined for use for its chemical properties; k) rock mined in block or slab form for building or monumental purposes; but does not include-- l) living matter; m) petroleum within the meaning of the Petroleum Act 1923; n) soil, sand, gravel or rock (other than rock mined in block or slab form for building or monumental purposes) to be used or to be supplied for use as such, whether intact or in broken form; o) water. See definition of `construction' Natural flow is defined as a flow event caused as a result of a local rainfall event, within a defined catchment area, and measured within the same receiving waters.

    Surface water, Regulated structures, Land and soil
  53. Page 53

    Permit OFFICIAL Environmental Authority EPML00879413 Word / Phrase Definition Non-acid producing Rock that when exposed to an oxidising environment will not produce acid solutions. (NAP) Compare with "ore or waste rock characterised as having acid forming potential. Neutral mine Has the same meaning as metalliferous mine drainage. drainage Offensive Means causing reasonable offence or displeasure; is disagreeable to the sense; disgusting, nauseous or repulsive, other than trivial harm. Operational plan For a dam means a document that amongst other things sets out procedures and criteria to be used for operating a dam during a particular time period. The operational plan as defined herein may form part of a plan of operations or plan otherwise required in legislation. Ore or waste rock Means any rock with either a Net Acid Producing Potential of greater than 5 kg of characterised as H2SO4/tonne or a Net Acid Generation oxidation pH of less than 4.5 (pH unit). having acid forming potential Oxide ore Means fully oxidised rock which has no acid forming potential. Peak particle Means a measure of ground vibration magnitude which is the maximum rate of change velocity (ppv) of ground displacement with time, usually measured in millimetres/second (mms). Potentially acid Means ore or waste rock characterised as having acid forming potential. forming (PAF) Protected area Means: - A protected area under the Nature Conservation Act 1992; or - A marine park under the Marine Parks Act 1992; or - A World Heritage Area. Prescribed Has the meaning in section 10 of the Environmental Offsets Act 2014, limited to the environmental matters of State environmental significant listed in Schedule 2 of the Environmental matters Offsets Regulation 2014. Progressive Means rehabilitation (defined below) undertaken progressively OR a staged approach rehabilitation to rehabilitation as mining operations are ongoing. Receiving In relation to an activity that causes or may cause environmental harm, means the environment part of the environment to which the harm is, or may be, caused. The receiving environment includes (but is not limited to): a) a watercourse or surface waters b) groundwater Receiving waters Has the same meaning as receiving environment.

    Rehabilitation, Groundwater, Surface water, Regulated structures, Noise and vibration, Waste, Biodiversity
  54. Page 54

    Permit OFFICIAL Environmental Authority EPML00879413 Word / Phrase Definition Reference site (or May reflect the original location, adjacent area or another area where rehabilitation analogue site) success has been completed for a similar biodiversity. Details of the reference site may be as photographs, computer generated images and vegetation models etc. Regulated dam Means any dam in the significant or high consequence category as assessed using the Manual for assessing consequence categories and hydraulic performance of structures Regulated structure Includes land-based containment structures, levees, bunds and voids, but not a tank or container designed and constructed to an Australian Standard that deals with strength and structural integrity. Rehabilitation Means the process of reshaping and revegetating land to restore it to a stable landform and in accordance with the acceptance criteria set out in this environmental authority and, where relevant, includes remediation of contaminated land. Representative Means a sample set which covers the variance in monitoring or other data either due to natural changes or operational phases of the mining activities. Residual void Means an open pit resulting from the removal of ore and/or waste rock which will remain following the cessation of all mining activities and completion of rehabilitation processes. Saline mine Means the movement of waters, contaminated with salt(s), as a result of the mining drainage activity. Self-sustaining Means an area of land which has been rehabilitated and has maintained the required acceptance criteria without human intervention for a period nominated by the administering authority. Sensitive place Means: a) a dwelling, residential allotment, mobile home or caravan park, residential marina or other residential premises, or b) a motel, hotel or hostel, or c) an educational institution, or d) a medical centre or hospital, or e) a protected area under the Nature Conservation Act 1992, the Marine Parks Act 1992 or a World Heritage Area, or f) a public park or gardens. Significant Includes land; disturbance (a) if it is contaminated land; or (b) it has been disturbed and human intervention is needed to rehabilitate it; i. to a state required under the relevant environmental authority; or

    Rehabilitation, Regulated structures, Waste, Biodiversity, Monitoring and reporting
  55. Page 55

    Permit OFFICIAL Environmental Authority EPML00879413 Word / Phrase Definition ii. if the environmental authority does not require the land to be rehabilitated to a particular state - to its state immediately before the disturbance. Some examples of disturbed land include: - areas where soil has been compacted, removed, covered, exposed or stockpiled; - areas where vegetation has been removed or destroyed to an extent where the land has been made susceptible to erosion; (vegetation & topsoil) - areas where land use suitability or capability has been diminished; - areas within a watercourse, waterway, wetland or lake where mining activities occur; - areas submerged by tailings or hazardous contaminant storage and dam walls in all cases; - areas under temporary infrastructure. Temporary infrastructure includes any infrastructure (roads, tracks, bridges, culverts, dams, bores, buildings, fixed machinery, hardstand areas, airstrips, helipads etc) which is to be removed after mining activities have ceased; or - areas where land has been contaminated and a suitability statement has not been issued. However, the following areas are not included: - areas off lease (e.g. roads or tracks which provide access to the mining lease); - areas previously significantly disturbed which have achieved the rehabilitation outcomes; - by agreement with the EPA, areas previously significantly disturbed which have not achieved the rehabilitation objective(s) due to circumstances beyond the control of the mine operator (such as climatic conditions); - areas under permanent infrastructure. Permanent infrastructure includes any infrastructure (roads, tracks, bridges, culverts, dams, bores, buildings, fixed machinery, hardstand areas, airstrips, helipads etc) which is to be left by agreement with the landowner. The agreement to leave permanent infrastructure must be recorded in the Landowner Agreement and lodged with the EPA; - disturbances that pre-existed the grant of the tenure unless those areas are disturbed during the term of the tenure. Significant residual Has the meaning in section 8 of the Environmental Offsets Act 2014. impact Spillway Means a weir, channel, conduit, tunnel, gate or other structure designed to permit discharges from the dam, normally under flood conditions or in anticipation of flood conditions.

    Rehabilitation, Groundwater, Surface water, Regulated structures, Waste, Land and soil, Biodiversity
  56. Page 56

    Permit OFFICIAL Environmental Authority EPML00879413 Word / Phrase Definition Stable Means land form dimensions are or will be stable within tolerable limits now and in the foreseeable future. Stability includes consideration of geotechnical stability, settlement and consolidation allowances, bearing capacity (trafficability), erosion resistance and geochemical stability with respect to seepage, leachate and related contaminant generation. Structure Means any dam or levee Suitably qualified In relation to regulated structures means a person who is a Registered Professional and experienced Engineer of Queensland (RPEQ) under the provisions of the Professional Engineers person Act 2002, and has demonstrated competency and relevant experience: - For regulated dams, an RPEQ who is a civil engineer with the required qualifications in dam safety and dam design. - For regulated levees, an RPEQ who is a civil engineer with the required qualifications in the design of flood protection embankments. Note: It is permissible that a suitably qualified and experienced person obtain subsidiary certification from an RPEQ who has demonstrated competence and relevant experience in either geomechanics, hydraulic design or engineering hydrology. System design plan Means a plan that manages an integrated containment system that shares the required DSA and/or ESS volume across the integrated containment system. Tolerable limits Means that a range of values could be accepted to achieve an overall environmental management objective (e.g. A range of settlement of a tailing capping could still meet the objective of draining the cap quickly, preventing pondage and limiting infiltration and percolation). Tolerable limits may be specified: - By agreement between the proponent and the chief executive as an interim arrangement, - By insertion of conditions as agreed above into this Environmental Authority, or By direction by the chief executive and insertion in this Environmental Authority as necessary. Trivial harm Means environmental harm which is not material or serious environmental harm and will not cause actual or potential loss or damage to property of an amount of, or amounts totalling more than $5,000. Void Means any constructed, open excavation in the ground. Watercourse Has the same meaning given in the Water Act 2000. Waters Includes river, stream, lake, lagoon, pond, swamp, wetland, unconfined surface water, unconfined water in natural or artificial watercourses, bed and bank of any waters, dams, non-tidal or tidal waters (including the sea), stormwater channel, stormwater drain, roadside gutter, stormwater run-off, and groundwater or any part-thereof. Water release event Means release of any waters that are or may be contaminated by the mining activity.

    Groundwater, Surface water, Regulated structures, Subsidence, Land and soil
  57. Page 57

    Permit OFFICIAL Environmental Authority EPML00879413 Word / Phrase Definition Water year Wet season Means the 12-month period from 1 July to 30 June. Means the time of year, covering one or more months, when most of the average annual rainfall in a region occurs. For the purposes of DSA determination this time of year is deemed to extend from 1 November in one year to 31 May in the following year inclusive. END OF SCHEDULE I

  58. Page 59

    Permit OFFICIAL Environmental Authority EPML00879413 Figure 1: Location of authorised disturbance: Dams.

    Regulated structures
  59. Page 60

    Permit OFFICIAL Environmental Authority EPML00879413 Figure 2 - Location of authorised disturbance: Waste rock dumps, landfills, irrigation areas and run of mine areas

    Waste
  60. Page 61

    Permit OFFICIAL Environmental Authority EPML00879413 Figure 3 - Location of authorised disturbance: Processing, voids, mining areas and ancillary infrastructure.

  61. Page 62

    Permit OFFICIAL Environmental Authority EPML00879413 Figure 4 - Location of authorised disturbance: Powerlines-substations, seismic lines and topsoil stockpiles.

    Land and soil
  62. Page 63

    Permit OFFICIAL Environmental Authority EPML00879413 END OF SCHEDULE J END OF ENVIRONMENTAL AUTHORITY