Coal environmental authority

EPML00865013 · Norwich Park Mine

Coal environmental authority EPML00865013 (Norwich Park Mine), Granted. 139 conditions indexed. Holds PRC plan P-PRCP-100733385.

Status
Granted
Holders
BHP COAL PTY LTD; BHP Queensland Coal Investments Pty Ltd; Mitsubishi Development Pty Ltd; QCT INVESTMENT PTY. LTD.; QCT MINING PTY. LTD.; QCT RESOURCES PTY LIMITED; Umal Consolidated Pty Ltd
Tenures
ML1782; ML70126; ML70127; ML70325; ML70328; ML70350; ML70369; ML70370; ML70410
PRC plan
P-PRCP-100733385 · effective 2025-09-30
How it was read
Numbered conditions
Register
Register record · Instrument PDF

Conditions

139 numbered conditions read from the current instrument. Page numbers link into the register PDF.

  1. A1

    This environmental authority authorises environmental harm referred to in the conditions. Where there is no condition or this environmental authority is silent on a matter, the lack of a condition or silence does not authorise environmental harm.

  2. A2

    Prevent and /or minimise likelihood of environmental harm In carrying out the environmentally relevant activities, the environmental authority holder must take all reasonable and practicable measures to prevent and/or to minimise the likelihood of environmental harm being caused. Any environmentally relevant activity, that, if carried out incompetently, or negligently, may cause environmental harm, in a manner that could have been prevented, shall be carried out in a proper manner in accordance with the conditions of this environmental authority.

  3. A3

    Maintenance of measures, plant and equipment The environmental authority holder must ensure: a) that all measures, plant and equipment necessary to ensure compliance with the conditions of this environmental authority are installed; a) that such measures, plant and equipment are maintained in a proper condition; b) that such measures, plant and equipment are operated in a proper manner; and c) that all instruments and devices used for the measurement or monitoring of any parameter under any condition of this environmental authority are properly calibrated.

    page 5Monitoring and reporting
  4. A4

    Monitoring and records Except where specified otherwise in another condition of this environmental authority, all monitoring records and reports required by this environmental authority must be kept for a period of not less than five (5) years.

    page 5Monitoring and reporting
  5. A5

    Monitoring and determinations required under any condition of this environmental authority must be conducted by an appropriately qualified person(s).

    page 5Monitoring and reporting
  6. A6

    Upon request from the administering authority, copies of monitoring results, records, registers, management plans and reports required by the conditions of this environmental authority must be made available and provided to the administering authority within ten (10) business days or an alternative timeframe agreed between the administering authority and the environmental authority holder. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

    page 5Monitoring and reporting
  7. A7

    Notification of emergencies, incidents and exceptions The environmental authority holder must notify the administering authority by written notification within twenty-four (24) hours after becoming aware of any emergency or incident that results in the release of contaminants not in accordance, or reasonably expected to be not in accordance, with the conditions of this environmental authority.

    page 6Monitoring and reporting
  8. A8

    Within ten (10) business days following the initial notification under condition A7, or the receipt of monitoring results associated with the notification made under condition A7, whichever is the latter, the environmental authority holder must provide further written advice to the administering authority, including the following: a) results and interpretation of any samples taken and analysed; b) outcomes of actions taken at the time to prevent or minimise unlawful environmental harm; and c) proposed actions to prevent a recurrence of the emergency or incident.

    page 6Monitoring and reporting
  9. A9

    Complaints The environmental authority holder must record all environmental complaints received about the mining activities, including: a) name, address and contact number for of the complainant; b) time and date of complaint; c) reasons for the complaint; d) investigations undertaken; e) conclusions formed; f) actions taken to resolve the complaint, including the use of appropriate dispute resolution if required; g) any abatement measures implemented; and h) person responsible for resolving the complaint.

    page 6Monitoring and reporting
  10. A10

    A register of alternative arrangements must be established and maintained by the environmental authority holder. The register must include: a) the location to which the alternative arrangement applies; b) the period of the alternative arrangement; c) details about the particular environmental nuisance impact or impacts the arrangement is for; and d) details about the mitigation measures, where relevant. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

  11. A11

    Monitoring on request When requested by the administering authority, the environmental authority holder must investigate any nuisance, or contaminant release, or environmental harm, or complaint that is neither frivolous nor vexatious in the opinion of the authorised person, by: a) undertaking the monitoring specified by the administering authority; b) undertaking the monitoring in the timeframe nominated or agreed to by the administering authority; c) completing an analysis and interpretation of the monitoring results; and d) implementing abatement measures, where required.

    page 7Monitoring and reporting
  12. A12

    The results of the investigation undertaken in accordance with condition A11 must be provided to the administering authority within twenty (20) business days of completion of the monitoring timeframe in accordance with condition A11(b), or a longer timeframe agreed to by the administering authority. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine Schedule B: Air Condition Condition number

    page 7Monitoring and reporting
  13. B1

    Odour nuisance The release of noxious or offensive odour or any other noxious or offensive airborne contaminant resulting from the mining activities must not cause an environmental nuisance, at any sensitive place or commercial place.

  14. B2

    If the administering authority determines odour released from the mining activities to constitute an environmental nuisance, the environmental authority holder must immediately implement abatement measures so that emissions from the mining activities do not result in further environmental nuisance.

  15. B3

    Dust nuisance The release of dust or particulate matter or both resulting from the mining activities must not cause an environmental nuisance, at any sensitive place or commercial place.

  16. B4

    Monitoring of dust and particulate matter resulting for the mining activities, undertaken in accordance with condition A11, must be carried out at a place relevant to the potentially affected sensitive place or commercial place and must not exceed the following levels when measured at any sensitive place or commercial place: a) dust deposition, measured as total insoluble matter, of 120 milligrams per square metre per day, averaged over one month, when monitored in accordance with the most recent version of Australian Standard AS3580.10.1 Methods for sampling and analysis of ambient air - Determination of particulate matter - Deposited matter - Gravimetric method. b) a concentration of particulate matter with an aerodynamic diameter of less than 10 micrometre (PM10) suspended in the atmosphere of 50 micrograms per cubic metre over a 24-hour averaging time, when monitored in accordance with the most recent version of either: a) Australian Standard AS3580.9.6 Methods for sampling and analysis of ambient air - Determination of suspended particulate matter - PM10 high volume sampler with size selective inlet - Gravimetric method; or b) Australian Standard AS3580.9.8 Methods for sampling and analysis of ambient air - Determination of suspended particulate matter - PM10 continuous direct mass method using a tapered element oscillating microbalance analyser; or c) Australian Standard AS3580.9.9 Methods for sampling and analysis of ambient air - Determination of suspended particulate matter - PM10 low volume sampler - Gravimetric method; or d) Australian Standard AS3580.9.11 Methods for sampling and analysis of ambient air - Determination of suspended particulate matter - PM10 beta attenuation monitors. NOTE: Exceedances due to events that cannot be managed by the environmental authority holder, such as bushfires, fuel reduction burning for fire management purposes or dust storms, would not be considered to be in breach of condition

    page 8Air, Monitoring and reporting
  17. B4

    if the environmental authority holder can demonstrate that the exceedance was caused by such events. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

  18. B5

    If monitoring, undertaken in accordance with condition A11, indicates exceedance of the relevant limits in condition B4, the environmental authority holder must immediately implement abatement measures so that emissions from the mining activities do not result in further environmental nuisance. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine Schedule C: Noise and Vibration Condition Condition number

    page 9Noise and vibration, Monitoring and reporting
  19. C1

    Noise nuisance Noise from the mining activities must not cause an environmental nuisance, at any sensitive place or commercial place.

    page 10Noise and vibration
  20. C2

    Noise is not considered an environmental nuisance under condition C1 if monitoring shows that noise does not exceed the limits in Table C1 (Noise Limits), at any sensitive place or commercial place.

    page 10Noise and vibration, Monitoring and reporting
  21. C3

    Noise monitoring Noise monitoring, undertaken in accordance with condition A11, must comply with the most recent version of the administering authority's Noise Measurement Manual, and must include the following descriptors, characteristics and conditions: a) LA10, adj, 10 mins; b) LA 1, adj, 10 mins; c) the level and frequency of occurrence of impulsive or tonal noise; d) atmospheric conditions including wind speed and direction; e) effects due to extraneous factors such as traffic noise; and f) location, date and time of recording.

    page 10Noise and vibration, Monitoring and reporting
  22. C4

    If monitoring, undertaken in accordance with condition A11, indicates exceedance of the relevant limits in Table C1 (Noise Limits), the environmental authority holder must immediately implement abatement measures so that emissions from the mining activities do not result in further environmental nuisance. Table C1 (Noise Limits) Monday to Saturday Sundays and Public Holidays Noise Level Day Evening Night Day Evening Night dB(A) (7am to 6pm) (6pm to 10pm) (10pm to 7am) (9am to 6pm) (6pm to 10pm) (10pm to 9am) LA10, adj, 10 mins B/g + 5 B/g + 5 Sensitive Place B/g + 5 B/g + 5 B/g + 0 LA1, adj, 10 mins B/g + 10 B/g + 10 B/g + 0 B/g + 10 B/g + 10 B/g + 5 B/g + 5 LA10, adj, 10 mins B/g + 10 B/g + 10 B/g + 10 B/g + 10 B/g + 5 LA1, adj, 10 mins B/g + 15 B/g + 15 Commercial Place B/g + 15 B/g + 15 B/g + 10 B/g + 5 B/g + 10 Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

    page 10Noise and vibration, Monitoring and reporting
  23. C5

    Vibration nuisance Vibration from the mining activities must not cause an environmental nuisance, at any sensitive place or commercial place.

    page 11Noise and vibration
  24. C6

    Vibration is not considered an environmental nuisance under condition C5 if monitoring shows that vibration does not exceed the limits specified in Table C2 (Vibration Limits).

    page 11Noise and vibration, Monitoring and reporting
  25. C7

    Airblast overpressure nuisance The airblast overpressure level from blasting operations on the mining leases must not cause an environmental nuisance, at any sensitive place or commercial place.

    page 11Noise and vibration
  26. C8

    Airblast overpressure is not considered an environmental nuisance under condition C7 if monitoring shows that airblast overpressure does not exceed the levels specified in Table C3 (Airblast Overpressure Level).

    page 11Noise and vibration, Monitoring and reporting
  27. C9

    Vibration and/or airblast overpressure monitoring Vibration and/or airblast overpressure monitoring, undertaken in accordance with condition A11, must comply with the most recent version of the administering authority's Noise Measurement Manual, and must include the following descriptors, characteristics and conditions: a) location of the blast(s) within the mining area (including which bench level); b) atmospheric conditions including temperature, relative humidity and wind speed and direction; and c) location, date and time of recording.

    page 11Noise and vibration, Monitoring and reporting
  28. C10

    If monitoring, undertaken in accordance with condition A11, indicates exceedance of the relevant limits in Table C2 (Vibration Limits) or Table C3 (Airblast Overpressure Level), the environmental authority holder must immediately implement abatement measures so that emissions from the mining activities do not result in further environmental nuisance. Location Table C2 (Vibration Limits) Sensitive place or commercial place Vibration Measured 5 mm/s peak particle velocity for nine (9) out of ten (10) consecutive blasts and not greater than 10 mm/s peak particle velocity at any time. Table C3 (Airblast Overpressure Level) Location Airblast Overpressure Measured Sensitive place or commercial place 115 dB (Linear peak) for nine (9) out of ten (10) consecutive blasts and not greater than 120 dB (Linear peak) at any time. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine Schedule D: Waste Condition Condition number

    page 11Noise and vibration, Waste, Monitoring and reporting
  29. D1

    Waste management A Waste Management Plan must be developed by an appropriately qualified person and implemented. The Waste Management Plan must include, but is not limited to: a) a description of the mining activities that may generate waste; b) a description of all waste activities being carried out; c) the location/s (including GPS coordinates) of where all waste activities are, or have been, carried out, including: a) the type of waste disposed of, treated, or reprocessed; and b) the volume of waste disposed of, treated, or reprocessed; d) identification of the potential risks to the environment from all waste activities carried out; e) control measures to be implemented to minimise the potential for environmental harm associated with carrying out of the waste activities, including but not limited to: a) segregation of the wastes; b) storage of the wastes; c) transport of the wastes; and d) monitoring and reporting matters concerning the wastes; f) how the waste will be managed in accordance with the waste management hierarchy (that is, avoid, reuse, recycling, energy recovery, disposal); g) the hazardous characteristics of the wastes generated including disposal procedures for hazardous wastes; h) procedures for reprocessing waste in accordance with condition D4; i) procedures for managing accidents, spills and other incidents; j) the indicators or other criteria on which the performance of the waste management plan will be assessed; and k) staff training.

    page 12Waste, Monitoring and reporting
  30. D2

    The environmental authority holder must submit the Waste Management Plan required by condition D1 to the administering authority prior to commencing a new process, or varying an existing process, for reprocessing any waste.

    page 12Waste
  31. D3

    Waste receipt The only waste permitted to be received is: a) the types of waste specified in conditions D5 to D7 (inclusive); and b) sewage and sludge for treatment in accordance with Schedule H: Sewage Treatment; and c) from a BHP Billiton Mitsui Coal (BMC) or BHP Mitsubishi Alliance (BMA) site in Queensland. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

    page 12Waste
  32. D4

    Waste reprocessing The only waste permitted to be reprocessed is: a) spoil or overburden; a) vegetation; b) water or sediment containing hydrocarbons; c) fuels, oils, lubricants and coolants; d) bulk rubber; e) inert waste; f) poly-pipe and other plastic; g) fibreglass; h) treated and untreated timber; and i) asphalt.

    page 13Waste, Land and soil, Biodiversity
  33. D5

    Waste disposal Unless otherwise specified in conditions D6 and D7, waste, other than spoil or overburden or vegetation removed as part of the mining activity, must not be disposed of within the mining leases listed on this environmental authority and must be taken to a facility that is lawfully allowed to accept such waste under the provisions of the Environmental Protection Act 1994.

    page 13Waste, Biodiversity
  34. D6

    The following types of waste are permitted to be disposed of within the specified features for the waste type: a) rejects and sediment containing hydrocarbons: a) in spoil emplacements; and b) in regulated structures in accordance with Schedule G: Structures of this environmental authority; and c) in pits or voids; and d) in dedicated rejects emplacements; and b) tailings and water or sediment containing hydrocarbons: a) in regulated structures in accordance with Schedule G: Structures of this environmental authority; and b) in pits or voids that are not regulated structures, provided a consequence category assessment in accordance with condition G1 has been completed. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

    page 13Regulated structures, Waste, Land and soil
  35. D7

    The following types of waste are permitted to be disposed of within the mining leases listed on this environmental authority: a) bulk rubber; b) inert waste; c) poly-pipe and other plastic; d) fibreglass; e) treated and untreated timber; f) asphalt; and g) asbestos. These types of waste may be disposed of: a) in pits or voids; b) in spoil emplacements; and c) left in situ below ground level. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine Schedule E: Land Condition Condition number

    page 14Waste
  36. E1

    Topsoil Topsoil must be strategically stripped ahead of mining in accordance with a Topsoil Management Plan.

    page 15Land and soil
  37. E2

    A topsoil inventory, which identifies the topsoil requirements for rehabilitation and availability of suitable topsoil on site, must be provided with any Estimated Rehabilitation Cost application.

    page 15Rehabilitation, Land and soil
  38. E3

    PRCP schedule Progressive rehabilitation of the disturbed land must be carried out in accordance with the approved Progressive Rehabilitation and Closure Plan (PRCP) schedule P-PRCP-100733385_v1 for this environmental authority.

    page 15Rehabilitation
  39. E4

    Preventing contaminant release to land Contaminants must not be released to land in manner that constitutes a nuisance, material harm or serious environmental harm.

  40. E5

    Storage and handling of chemicals and flammable or combustible liquids All chemicals and flammable or combustible liquids must be stored and handled in accordance with the most recent version of an Australian Standard where such is applicable. Where no relevant Australian Standard exists, store such materials within an effective on-site containment system.

  41. E6

    Acid Rock Drainage and Leachate Management Subject to the release limits defined in Schedule F: Water, all reasonable and practicable measures must be implemented to prevent hazardous leachate being directly or indirectly released or likely to be released as a result of the activity to any groundwater or water course.

    page 15Groundwater, Waste
  42. E7

    Surrender The holder must meet the conditions and the rehabilitation milestones under the PRCP schedule P-PRCP-100733385_v1 prior to the surrender of the environmental authority. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine Schedule F: Water Condition Condition number

    page 15Rehabilitation
  43. F1

    Contaminant Release Contaminants that will or have the potential to cause environmental harm must not be released directly or indirectly to any waters as a result of the mining activities, except as permitted under the conditions of this environmental authority.

  44. F2

    Notwithstanding any other condition of this environmental authority, the environmental authority holder may commence the release of mine affected water to waters in accordance with a written approval provided by the administering authority.

    page 16Surface water
  45. F3

    Any release of mine affected water in accordance with condition F2 must comply with the conditions of the written approval.

    page 16Surface water
  46. F4

    Any release of mine affected water in accordance with condition F2 must cease immediately if directed to do so in writing by the administering authority.

    page 16Surface water
  47. F5

    Unless otherwise permitted under the conditions of this environmental authority, the release of mine affected water to waters must only occur from the release points specified in Table F1 (Mine Affected Water Release Points).

    page 16Surface water
  48. F6

    The release of mine affected water to internal water management infrastructure that is installed and operated in accordance with a Water Management Plan that complies with conditions F33 to

    page 16Surface water
  49. F34

    inclusive is permitted. Table F1 (Mine Affected Water Release Points) Release Easting Northing Mine Affected Water Monitoring Point Receiving Waters Point (GDA94) (GDA94) Source and Location Description (RP)

    page 16Surface water, Monitoring and reporting
  50. F7

    The release of mine affected water to waters in accordance with condition F5 must not exceed the release limits stated in Table F2 (Mine Affected Water Release Limits) when measured at the monitoring points specified in Table F1 (Mine Affected Water Release Points) for each quality characteristic. Table F2 (Mine Affected Water Release Limits) Quality Characteristic Release Limit Monitoring Frequency Electrical Conductivity 10,000 Real-time monitoring of pH, EC and flow during active release. (-S/cm) 6.5 (minimum) Where real time monitoring is not available, daily sampling during active pH 9.0 (maximum) (pH units) release as soon as possible after commencement of active release, when safe access permits^ Sulphate (SO42-) N/A - correlated with EC As soon as possible after commencement of active release, when safe access permits, and weekly thereafter. For successive releases from the same site under similar circumstances, only one sample per week is required^. NOTES: ^ Generally during daylight hours only

    page 17Surface water, Monitoring and reporting
  51. F8

    The release of mine affected water to waters from the release points must be monitored at the locations specified in Table F1 (Mine Affected Water Release Points) for each quality characteristic and at the frequency specified in Table F2 (Mine Affected Water Release Limits) and Table F3 (Release Contaminant Trigger Investigation Levels). NOTE: the administering authority will take into consideration any extenuating circumstances prior to determining an appropriate enforcement response in the event condition F8 is contravened due to a temporary lack of safe or practical access. The administering authority expects the environmental authority holder to take all reasonable and practicable measures to maintain safe and practical access to designated monitoring locations.

    page 17Surface water, Monitoring and reporting
  52. F9

    If quality characteristics of the release exceed any of the trigger levels specified in Table F3 (Release Contaminant Trigger Investigation Levels) during a release event, the environmental authority holder must compare the downstream results in the receiving waters to the trigger values specified in Table F3 (Release Contaminant Trigger Investigation Levels) and: (1) where the trigger values are not exceeded then no action is to be taken; or (2) where the downstream results exceed the trigger values specified in Table F3 (Release Contaminant Trigger Investigation Levels) for any quality characteristic, compare the results of the downstream site to the data from background monitoring sites and; (a) if the result is less than the background monitoring site data, then no action is to be taken; or (b) if the result is greater than the background monitoring site data, complete an investigation into the potential for environmental harm and provide a written report to the administering authority in the next annual return, outlining: i. details of the investigations carried out; and ii. actions taken to prevent environmental harm. NOTE: Where an exceedance of a trigger level has occurred and is being investigated, in accordance with condition F9(2)(b), no further reporting is required for subsequent trigger events for that quality characteristic. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine Table F3 (Release Contaminant Trigger Investigation Levels) Quality Characteristic Trigger Comment of Trigger Level Monitoring Level Frequency (-g/L) Aluminium 372 For aquatic ecosystem protection, based on 80th percentile of 42 upstream samples Chromium 1 For aquatic ecosystem protection, based on SMD guideline Copper 3 For aquatic ecosystem protection, based on 80th percentile of 42 upstream samples Iron 484 For aquatic ecosystem protection, based on 80th percentile of 42 Release Point: Nickel upstream samples Zinc Within one week Molybdenum Selenium 11 For aquatic ecosystem protection, based on SMD guideline prior to Silver commencement 8 For aquatic ecosystem protection, based on SMD guideline of release or as

    page 17Surface water, Monitoring and reporting
  53. F10

    If an exceedance in accordance with condition F9(2)(b) is identified, the environmental authority holder must notify the administering authority within twenty-four (24) hours of receiving the result.

    page 18Monitoring and reporting
  54. F11

    Mine Affected Water Release Events The environmental authority holder must ensure a stream flow gauging station(s) is installed, operated and maintained to determine and record stream flows at the locations and flow recording frequency specified in Table F4 (Mine Affected Water Release During Flow Events).

    page 18Surface water, Monitoring and reporting
  55. F12

    Notwithstanding any other condition of this environmental authority, the release of mine affected water to waters in accordance with condition F5 must only take place during periods of natural flow events in accordance with the receiving water flow criteria for discharge specified in Table

    page 18Surface water
  56. F4

    (Mine Affected Water Release During Flow Events) for the release point(s) specified in Table F1 (Mine Affected Water Release Points). Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

    page 18Surface water
  57. F13

    The 80th percentile of electrical conductivity (EC) values recorded at the downstream monitoring points specified in Table F6 (Receiving Waters Upstream Background and Downstream Monitoring Points) must not exceed 2,000 -S/cm at any time during the release influence period. The 80th percentile must be calculated using all EC values recorded by the monitoring station during the release influence period. Note: The release influence period is the period during which the downstream monitoring points are influenced by mine affected water and includes both the duration of release and any lag time between release point/s and downstream monitoring points.

    page 19Surface water, Monitoring and reporting
  58. F14

    The daily quantity of mine affected water released from each release point must be measured and recorded at the monitoring points in Table F1 (Mine Affected Water Release Points).

    page 19Surface water, Monitoring and reporting
  59. F15

    Releases to waters must be undertaken so as not to cause erosion of the bed and banks of the receiving waters or cause a material build-up of sediment in such waters. Table F4 (Mine Affected Water Release During Flow Events) Receiving Release Gauging Station Gauging Gauging Receiving Water Receiving waters Point Station Station Flow Criteria for Water Flow Easting Northing Recording (RP) Discharge# Frequency^ (GDA94) (GDA94) (m3/s) Scott Creek RP3 Scott Creek Downstream 653010 7492596

    page 19Surface water, Land and soil
  60. F16

    Notification of release event The environmental authority holder must notify the administering authority via WaTERS as soon as practicable and no later than twenty-four (24) hours after commencing to release mine affected water to the receiving environment. The release commencement notification must include the submission of written advice to the administering authority of the following information: a) release commencement date and time; b) expected release cessation date and time; c) release point(s); d) release rate; e) receiving water(s) including the natural flow rate; and f) any details (including available data) regarding likely impacts on the receiving water(s). Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

    page 19Surface water, Monitoring and reporting
  61. F17

    The environmental authority holder must notify the administering authority via WaTERS as soon as practicable and no later than twenty-four (24) hours after cessation of a release event notified under condition F16. The release cessation notification must include the submission of written advice to the administering authority of the following information: a) release cessation date and time; b) receiving water(s) including the natural flow rate; and c) volume of water released. NOTE: Successive or intermittent releases occurring within twenty-four (24) hours of the cessation of any individual release can be considered part of a single release event and do not require individual notification for the purpose of compliance with conditions F16 and F17 and F18 and F19, provided the relevant details of the release are included within the notification provided in accordance with conditions F16 and F17 and F18 and F19.

    page 20Surface water, Monitoring and reporting
  62. F18

    Within twenty-eight (28) days of notification under condition F17, the environmental authority holder must provide the administrating authority via WaTERS the following information in writing: a) confirmation of: a) the release commencement date and time; b) the release cessation date and time; c) receiving water(s) including the natural flow rate; d) volume of water released; b) all in-situ and laboratory water quality monitoring results; c) details regarding the compliance of the release with the conditions of Schedule F: Water of this environmental authority (i.e., contamination limits, natural flow, discharge volume); d) whether the release of water resulted in any impacts to the receiving environment; and e) any other matter(s) pertinent to the water release event.

    page 20Surface water, Monitoring and reporting
  63. F19

    Release notification - potentially affected stakeholder If written approval is given by the administering authority, the environmental authority holder must notify all potentially affected stakeholders on commencement (within 2 hours) of releasing mine affected water in accordance with the written approval as per condition F2. Notification must include the following information: a) release commencement date/time; b) release location (release point/s); c) release rate; d) receiving waters for the release; e) receiving water flow rate; f) water quality of the release including salinity and pH; and g) estimated duration of the release. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

    page 20Surface water, Monitoring and reporting
  64. F20

    Notification of release event exceedance If the release limits defined in Table F2 (Mine Affected Water Release Limits) are exceeded, the environmental authority holder must notify the administering authority within twenty-four (24) hours of receiving the results.

    page 21Surface water, Monitoring and reporting
  65. F21

    The environmental authority holder must, within twenty-eight (28) days of the notification provided in accordance with condition F20, provide a report to the administering authority via WaTERS detailing: a) the reason for the release; b) the location of the release; c) the total volume of the release and which (if any) part of this volume was non-compliant; d) the total duration of the release and which (if any) part of this period was non-compliant; e) all water quality monitoring results; f) any general observations; g) all calculations; and h) any other matters pertinent to the water release event.

    page 21Monitoring and reporting
  66. F22

    Receiving Environment Monitoring and Contaminant Trigger Levels The quality of the receiving waters must be monitored at the locations specified in Table F6 (Receiving Water Upstream Background and Downstream Monitoring Points) for each quality characteristic and at the monitoring frequency stated in Table F5 (Receiving Waters Contaminant Trigger Levels) and Table F3 (Release Contaminant Trigger Investigation Levels).

    page 21Surface water, Monitoring and reporting
  67. F23

    If quality characteristic(s) of the receiving water at the downstream monitoring point exceed any of the trigger levels specified in Table F5 (Receiving Waters Contaminant Trigger Levels) during a release event the environmental authority holder must compare the downstream results to the upstream results in the receiving waters and: (1) where the downstream result is the same or a lower value than the upstream value for the quality characteristic then no action is to be taken; or (2) where the downstream results exceed the upstream results, complete an investigation into the potential for environmental harm and provide a written report to the administering authority in the next annual return, outlining: (a) details of the investigations carried out; and (b) actions taken to prevent environmental harm. NOTE: Where an exceedance of a trigger level has occurred and is being investigated in accordance with F23(2) of this condition, no further reporting is required for subsequent trigger events for that quality characteristic. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine Table F5 (Receiving Waters Contaminant Trigger Levels) Quality Characteristic Trigger Level Monitoring Frequency pH 6.5 to 9.0 2,000 Real-time monitoring of pH, EC, and (pH units) flow during active or passive release. 1,000 Electrical Conductivity Where real time monitoring is not (-S/cm) available, daily sampling during active Sulphate (SO42-) or passive release as soon as possible after commencement of NOTES: release, when safe access permits^ ^ Generally during daylight hours only As soon as possible after commencement of active release, when safe access permits, and weekly thereafter Table F6 (Receiving Waters Upstream Background and Downstream Monitoring Points) Monitoring Point Receiving Waters Location Description Easting Northing (MP) (GDA94) (GDA94) Upstream Background Monitoring Points

    page 21Surface water, Monitoring and reporting
  68. F24

    Receiving Environment Monitoring Program (REMP) The environmental authority holder must develop and implement a Receiving Environment Monitoring Program (REMP) to monitor, identify and describe any adverse impacts to surface water environmental values, quality and flows due to the authorised mining activity. This must include monitoring the effects of the mine on the receiving environment periodically (under natural flow conditions) and while mine affected water is being discharged from the site. For the purposes of the REMP, the receiving environment is the waters of the Scott, Stephens and Rolf Creeks and connected or surrounding waterways within eight (8) kilometres downstream of the release. The REMP should encompass any sensitive receiving waters or environmental values downstream of the authorised mining activity that will potentially be directly affected by an authorised release of mine affected water.

    page 23Surface water, Monitoring and reporting
  69. F25

    The REMP must: a) assess the condition or state of receiving waters, including upstream conditions, spatially within the REMP area, considering background water quality characteristics based on accurate and reliable monitoring data that takes into consideration temporal variation (e.g., seasonality); b) be designed to facilitate assessment against water quality objectives for the relevant environmental values that need to be protected; c) include monitoring from background reference sites (e.g., upstream or background) and downstream sites from the release (as a minimum, the locations specified in Table F6 (Receiving Water Upstream Background and Downstream Monitoring Points)); d) specify the frequency and timing of sampling required in order to reliably assess ambient conditions and to provide sufficient data to derive site specific background reference values in accordance with the Queensland Water Quality Guidelines 2009. This should include monitoring during periods of natural flow irrespective of mine or other discharges; e) include monitoring and assessment of dissolved oxygen saturation, temperature and all water quality parameters listed in Table F2 (Mine Affected Water Release Limits) and Table F3 (Release Contaminant Trigger Investigation Levels)); f) include, where appropriate, monitoring of metals/metalloids in sediments (in accordance with ANZECC & ARMCANZ 2000, BATLEY and/or the most recent version of AS5667.1 Guidance on Sampling of Bottom Sediments); g) include, where appropriate, monitoring of macroinvertebrates in accordance with the AusRivas methodology, h) apply procedures and/or guidelines from ANZECC & ARMCANZ 2000 and other relevant guideline documents; i) describe sampling and analysis methods and quality assurance and control; and j) incorporate stream flow and hydrological information in the interpretations of water quality and biological data. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

    page 23Surface water, Land and soil, Monitoring and reporting
  70. F26

    A report outlining the findings of the REMP, including all monitoring results and interpretations in accordance with conditions F24 and F25 must be prepared annually. This report must include the following: a) an assessment of background reference water quality; b) the condition of downstream water quality compared against water quality objectives; and c) the suitability of current discharge limits to protect downstream environmental values.

    page 24Monitoring and reporting
  71. F27

    Water reuse Mine affected water may be piped or trucked or transferred by some other means that does not contravene the conditions of this environmental authority and deposited into artificial water storage structures, such as farm dams or tanks, or used directly at properties owned by the environmental authority holder or a third party for the purpose of: a) supplying stock water subject to compliance with the quality release limits specified in Table

    page 24Surface water, Regulated structures
  72. F7

    (Stock Water Release Limits); or b) supplying irrigation water subject to compliance with quality release limits in Table F8 (Irrigation Water Release Limits); or c) supplying water for construction and/or road maintenance in accordance with the conditions of this environmental authority. Table F7 (Stock Water Release Limits) Quality Characteristic Units Minimum Maximum pH pH units 6.5 8.5 -S/cm N/A 5000 Electrical Conductivity Table F8 (Irrigation Water Release Limits) Maximum Quality Characteristic 8.5 pH Units Minimum pH units 6.5 Site specific value Electrical Conductivity determined in accordance -S/cm N/A with ANZECC & ARMCANZ (2000) Irrigation Guidelines

  73. F28

    Mine affected water may be piped or trucked or transferred by some other means that does not contravene the conditions of this environmental authority and deposited into artificial water storage structures, such as dams or tanks, for the purpose of supplying water to any operation licensed for either ERA13 (mining black coal) or ERA31 (mineral processing). The volume, pH and electrical conductivity of water transferred must be monitored and recorded. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

    page 24Surface water, Regulated structures, Monitoring and reporting
  74. F29

    If the responsibility for mine affected water is given or transferred to another person in accordance with conditions F27 or F28: a) the responsibility for the mine affected water must only be given or transferred in accordance with a written agreement (the third-party agreement); and b) the third-party agreement must include a commitment from the person utilising the mine affected water to use it in such a way as to prevent environmental harm or public health incidents and specifically make the persons aware of the General Environmental Duty (GED) under section 319 of the Environmental Protection Act 1994, environmental sustainability of the water disposal and protection of environmental values of waters; and c) the third-party agreement must be signed by both parties to the agreement.

    page 25Surface water
  75. F30

    Water general All determinations of water quality and biological monitoring must be: a) performed by a person or body possessing appropriate experience and qualifications to perform the required measurements; b) made in accordance with methods prescribed in the latest edition of the administering authority's Monitoring and Sampling Manual; c) collected from the monitoring locations identified within this environmental authority, within ten hours of each other where possible; d) carried out on representative samples; and e) analysed at a laboratory accredited (e.g., NATA) for the method of analysis being used. Note: Condition F30 requires the Monitoring and Sampling Manual to be followed and where it is not followed because of exceptional circumstances this should be explained and reported with the results.

    page 25Monitoring and reporting
  76. F31

    The release of any contaminants as permitted by this environmental authority, directly or indirectly to waters, other than internal water management infrastructure that is installed and operated in accordance with a Water Management Plan that complies with conditions F33 to F34 inclusive: a) must not produce any visible discolouration of receiving waters; and b) must not produce any slick or other visible or odorous evidence of oil, grease or petrochemicals nor contain visible floating oil, grease, scum, litter or other objectionable matter. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

    page 25Surface water
  77. F32

    Annual water monitoring reporting The following information must be recorded in relation to all water monitoring required under the conditions of this environmental authority and submitted to the administering authority in the specified format with each annual return: a) the date on which the sample was taken; b) the time at which the sample was taken; c) the monitoring point at which the sample was taken; d) the measured or estimated daily quantity of mine affected water released from all release points; e) the release flow rate at the time of sampling for each release point; f) the results of all monitoring and details of any exceedances of the conditions of this environmental authority; and g) water quality monitoring data must be provided to the administering authority in the specified electronic format upon request.

    page 26Surface water, Monitoring and reporting
  78. F33

    Water Management Plan A Water Management Plan must be developed by an appropriately qualified person(s) and implemented for all mining activities. The Water Management Plan must address, as a minimum, the following: a) provide for effective management of actual and potential environmental impacts resulting from water management associated with the mining activity carried out under this environmental authority; and b) be developed in accordance with administering authority's guideline Preparation of water management plans for mining activities and include: a) a study of the source of contaminants; b) a water balance model for the site; c) a water management system for the site; d) measures to manage and prevent saline drainage; e) measures to manage and prevent acid rock drainage; f) contingency procedures for emergencies; and g) a program for monitoring and review of the effectiveness of the Water Management Plan.

    page 26Monitoring and reporting
  79. F34

    The Water Management Plan must be reviewed each calendar year by an appropriately qualified person(s).

  80. F35

    Saline drainage The environmental authority holder must ensure proper and effective measures are taken to avoid or otherwise minimise the generation and/or release of saline drainage. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

  81. F37

    The environmental authority holder must ensure proper and effective measures are taken to avoid or otherwise minimise the generation and/or release of acid rock drainage. F38 Stormwater and water sediment controls F39

    page 27Surface water, Land and soil
  82. F40

    An Erosion and Sediment Control Plan must be developed by an appropriately qualified person

    page 27Land and soil
  83. G1

    Assessment of consequence category The consequence category of any structure must be assessed by a suitably qualified and experienced person, in accordance with the Manual for Assessing Consequence Categories and a) prior to the design and construction of the structure, if it is not an existing structure; or b) prior to any change in its purpose or the nature of its stored contents.

    page 28Regulated structures
  84. G2

    A consequence assessment report and certification must be prepared for each structure assessed and the report may include a consequence assessment for more than one structure.

    page 28Monitoring and reporting
  85. G3

    Certification must be provided by the suitably qualified and experienced person who undertook the assessment, in the form set out in the Manual for Assessing Consequence Categories and

    page 28Regulated structures
  86. G4

    Design and construction of a regulated structure Conditions G5 to G9 inclusive do not apply to existing structures. NOTE: Construction of a dam includes modification of an existing dam - see definitions.

    page 28Regulated structures
  87. G5

    All regulated structures must be designed by, and constructed under the supervision of, a suitably qualified and experienced person in accordance with the requirements of the Manual for April 2014) (EM635). NOTE: Certification of design and construction may be undertaken by different persons.

    page 28Regulated structures
  88. G6

    Construction of a regulated structure is prohibited unless the environmental authority holder has submitted a consequence category assessment report and certification to the administering authority has been certified by a suitably qualified and experienced person for the design and design plan and the associated operating procedures in compliance with the relevant condition of this environmental authority.

    page 28Regulated structures, Monitoring and reporting
  89. G7

    Certification must be provided by the suitably qualified and experienced person who oversees the preparation of the design plan in the form set out in the Manual for Assessing Consequence must be recorded in the Register of Regulated Structures. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

    page 28Regulated structures
  90. G8

    Regulated structures must: a) be designed and constructed in accordance with and conform to the requirements of the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures b) be designed and constructed with due consideration given to ensuring that the design integrity would not be compromised on account of: a) floodwaters from entering the regulated dam from any watercourse or drainage line; and b) wall failure due to erosion by floodwaters arising from any watercourse or drainage line. c) for regulated dams associated with a failure to contain - seepage, have the floor and sides of the dam designed and constructed to prevent or minimise the passage of the wetting front and any entrained contaminants through either the floor or sides of the dam during the operational life of the dam and for any period of decommissioning and rehabilitation of the dam.

    page 29Rehabilitation, Surface water, Regulated structures, Land and soil
  91. G9

    Certification by the suitably qualified and experienced person who supervises the construction must be submitted to the administering authority on the completion of construction of the regulated structure, and state that: a) the 'as constructed' drawings and specifications meet the original intent of the design plan for that regulated structure; and b) construction of the regulated structure is in accordance with the design plan.

    page 29Regulated structures
  92. G10

    Operation of a regulated structure Operation of a regulated structure, except for an existing structure, is prohibited unless the environmental authority holder has submitted to the administering authority: a) one paper copy and one electronic copy of the design plan and certification of the `design plan' in accordance with condition G6; b) a set of `as constructed' drawings and specifications; c) certification of those `as constructed drawings and specifications' in accordance with condition G9; d) where the regulated structure is to be managed as part of an integrated containment system for the purpose of sharing the DSA volume across the system, a copy of the certified system design plan; e) the requirements of this environmental authority relating to the construction of the regulated structure have been met; f) the environmental authority holder has entered the details, required under this environmental authority, into the Register of Regulated Structures; and g) there is a current operational plan for the regulated structures. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

    page 29Regulated structures
  93. G11

    For existing structures that are regulated structures: a) where the existing structure that is a regulated structure is to be managed as part of an integrated containment system for the purpose of sharing the DSA volume across the system, the environmental authority holder must submit to the administering authority within twelve (12) months of the commencement of this condition a copy of the certified system design plan including that structure; and b) there must be a current operational plan for the existing structures.

    page 30Regulated structures
  94. G12

    Each regulated structure must be maintained and operated, for the duration of its operational life until decommissioned and rehabilitated, in a manner that is consistent with the current operational plan and, if applicable, the current design plan and associated certified `as constructed' drawings.

    page 30Rehabilitation, Regulated structures
  95. G13

    Mandatory Reporting Level Conditions G14 to G17 inclusive only apply to regulated structures which have not been certified as low consequence category for `failure to contain - overtopping'.

    page 30Regulated structures, Monitoring and reporting
  96. G14

    The Mandatory Reporting Level (the MRL) must be marked on a regulated dam in such a way that, during routine inspections of that dam, it is clearly observable.

    page 30Regulated structures, Monitoring and reporting
  97. G15

    The environmental authority holder must, as soon as practical and within forty-eight (48) hours of becoming aware, notify the administering authority when the level of the contents of a regulated dam reaches the MRL.

    page 30Regulated structures, Monitoring and reporting
  98. G16

    The environmental authority holder must immediately on becoming aware that the MRL has been reached, act to prevent the occurrence of any unauthorised discharge from the regulated dam.

    page 30Regulated structures
  99. G17

    The environmental authority holder must record any changes to the MRL in the Register of Regulated Structures.

    page 30Regulated structures, Monitoring and reporting
  100. G18

    Design Storage Allowance The environmental authority holder must assess the performance of each regulated dam or linked containment system over the preceding November to May period based on actual observations of the available storage in each regulated dam or linked containment system taken prior to 1 July of each year.

    page 30Regulated structures
  101. G19

    By 1 November of each year, storage capacity must be available in each regulated dam (or network of linked containment systems with a shared DSA volume), to meet the Design Storage Allowance (DSA) volume for the dam (or network of linked containment systems).

    page 30Regulated structures
  102. G20

    The environmental authority holder must notify the administering authority as soon as possible and within forty-eight (48) hours of becoming aware that the regulated dam (or network of linked containment systems) will not have the available storage to meet the DSA volume on 1 November of any year. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

    page 30Regulated structures, Monitoring and reporting
  103. G21

    The environmental authority holder must, immediately on becoming aware that a regulated dam (or network of linked containment systems) will not have the available storage to meet the DSA volume on 1 November of any year, act to prevent the occurrence of any unauthorised discharge from the regulated dam or linked containment systems.

    page 31Regulated structures
  104. G22

    Annual inspection report Each regulated structure must be inspected each calendar year by a suitably qualified and experienced person.

    page 31Regulated structures, Monitoring and reporting
  105. G23

    At each annual inspection, the condition and adequacy of all components of the regulated structure must be assessed and a suitably qualified and experienced person must prepare an annual inspection report containing details of the assessment and include recommended actions to ensure the integrity of the regulated structure.

    page 31Regulated structures, Monitoring and reporting
  106. G24

    The suitably qualified and experienced person who prepared the annual inspection report must certify the report in accordance with the Manual for Assessing Consequence Categories and

    page 31Regulated structures, Monitoring and reporting
  107. G25

    The environmental authority holder must: a) within twenty (20) business days of receipt of the annual inspection report, provide to the administering authority: a) the recommendations section of the annual inspection report; and b) if applicable, any actions being taken in response to those recommendations; and b) if, following receipt of the recommendations and (if applicable) actions, the administering authority requests a full copy of the annual inspection report from the environmental authority holder, provide this to the administering authority within ten (10) business days of receipt of the request.

    page 31Monitoring and reporting
  108. G26

    Transfer arrangements The environmental authority holder must provide a copy of any reports, documentation and certifications prepared under this environmental authority, including but not limited to any Register of Regulated Structures, consequence assessment, design plan and other supporting documentation, to a new holder on transfer of this authority.

    page 31Regulated structures, Monitoring and reporting
  109. G27

    Register of Regulated Structures A Register of Regulated Structures must be established and maintained by the environmental authority holder for each regulated structure.

    page 31Regulated structures
  110. G28

    The environmental authority holder must provisionally enter the required information in the Register of Regulated Structures when a design plan for a regulated structure is submitted to the administering authority.

    page 31Regulated structures
  111. G29

    The environmental authority holder must make a final entry of the required information in the Register of Regulated Structures once compliance with condition G10 and G11 has been achieved. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

    page 31Regulated structures
  112. G30

    The environmental authority holder must ensure that the information contained in the Register of Regulated Structures is current and complete on any given day.

    page 32Regulated structures
  113. G31

    All entries in the Register of Regulated Structures must be approved by the chief executive officer for the environmental authority holder, or their delegate, as being accurate and correct.

    page 32Regulated structures
  114. G32

    The environmental authority holder must, at the same time as providing the annual return, supply to the administering authority a copy of the records contained in the Register of Regulated Structures, in the electronic format required by the administering authority.

    page 32Regulated structures, Monitoring and reporting
  115. G33

    Transitional arrangements All existing structures that have not been assessed in accordance with either, the Manual or the former Manual for Assessing Hazard Categories and Hydraulic Performance of Dams, must be assessed and certified in accordance with the Manual within six (6) months of amendment of the environmental authority adopting this schedule.

    page 32Regulated structures
  116. G34

    All existing structures must subsequently comply with the timetable for any further assessments in accordance with the Manual specified in Table G1 (Transitional Requirements for Existing Structures), depending on the consequence category for each existing structure assessed in the most recent previous certification for that structure.

    page 32Regulated structures
  117. G35

    Table G1 (Transitional Requirements for Existing Structures) ceases to apply for a structure once any of the following events has occurred: a) it has been brought into compliance with the hydraulic performance criteria applicable to the structure under the Manual; or b) it has been decommissioned; or c) it has been certified as no longer being assessed as a regulated structure.

    page 32Regulated structures
  118. G36

    Certification of the transitional assessment required by G33 and G34 (as applicable) must be provided to the administering authority within six (6) months of amendment of the environmental authority adopting this schedule. Table G1 (Transitional Requirements for Existing Structures) Transition period required for existing structures to achieve the requirements of the Manual for Assessing Compliance with Criteria High Significant Low >90% and a history of good No transition required No transition required No transitional conditions compliance performance in apply. Review consequence assessment every 7 years. last 5 years >70% to 90% Within 7 years, unless Within 10 years, unless No transitional conditions otherwise agreed with the otherwise agreed with the apply. Review consequence assessment every 7 years. administering authority, administering authority, based on no history of based on no history of unauthorised releases. unauthorised releases. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine 50 to 70% Within 5 years unless Within 7 years unless Review consequence 50% otherwise agreed with the otherwise agreed with the assessment every 7 years. administering authority, administering authority, Review consequence based on no history of based on no history of assessment every 5 years. unauthorised releases. unauthorised releases. Within 5 years or as per Within 5 years or as per compliance requirements compliance requirements (e.g., TEP timing) (e.g., TEP timing) Innovation Permit Environmental authority EPML00865013 Norwich Park Mine Schedule H: Sewage Treatment Condition Condition number

  119. H1

    Treated sewage effluent The cumulative total daily peak design capacity of the sewage treatment plant/s must not exceed 1500 equivalent persons (EP). Small package plants and/or septic systems, each with a daily peak design capacity less than 21EP, are not included in the cumulative total daily peak design capacity.

  120. H2

    Treated sewage effluent must not be directly released from the sewage treatment plant/s to any waters. Note: `waters' does not include structures associated with the mine affected water management system.

    page 34Surface water
  121. H3

    Treated sewage effluent may be: a) released to the mine affected water management system for mixing with other mine affected water; b) released to land via a sub-surface infiltration trench; c) irrigated or sprayed for dust suppression or firefighting or evaporation; or d) removed as waste.

    page 34Surface water, Air, Waste
  122. H4

    Treated sewage effluent that is released in accordance with condition H3(a) and has mixed with other mine affected water must be managed as mine affected water in accordance with the conditions of this environmental authority.

    page 34Surface water
  123. H5

    Treated sewage effluent that is released in accordance with condition H3(b) or H3(c) must be carried out in a manner such that: a) vegetation is not damaged; b) there is no surface ponding of effluent; and c) there is no run-off of treated sewage effluent to waters.

    page 34Biodiversity
  124. H6

    Treated sewage effluent released in accordance with condition H3(a) or H3(b) or H3(c) from any sewage treatment plant that has a daily peak design capacity of greater than 21EP must be monitored: a) at the point where the treated sewage effluent is released from the sewage treatment plant/s; b) for the quality characteristics specified in Table H1 (Treated Sewage Effluent Monitoring Requirements); and c) at the frequency specified in Table H1 (Treated Sewage Effluent Monitoring Requirements). Innovation Permit Environmental authority EPML00865013 Norwich Park Mine Table H1 (Treated Sewage Effluent Monitoring Requirements) Quality Characteristic Units Monitoring Frequency 5-day Biochemical Oxygen Demand (uninhibited) mg/L pH pH units Monthly Colonies per 100mL Monthly Thermotolerant coliforms Monthly Total nitrogen mg/L Monthly mg/L Monthly Total phosphorus

    page 34Monitoring and reporting
  125. H7

    If treated sewage effluent is being released in accordance with condition H3(c): a) the results of monitoring in accordance with condition H6 must not exceed the release limits specified in Table H2 (Treated Sewage Effluent Contaminant Release Limits); and b) the release must not cause spray drift or over spray to any sensitive place or commercial place.

    page 35Monitoring and reporting
  126. H8

    If the release limits specified in Table H2 (Treated Sewage Effluent Contaminant Release Limits) are exceeded in accordance with condition H7(a), the environmental authority holder must notify the administering authority in accordance with conditions A7 and A8. Table H2 (Treated Sewage Effluent Contaminant Release Limits) Quality Characteristic Release Limit Units Limit Type 5-day Biochemical Oxygen Demand (uninhibited) 50 mg/L Maximum pH units pH 6.0 to 9.0 Range Colonies per 100mL Thermotolerant coliforms, based on the average of a 1000 Maximum minimum of five samples collected Innovation Permit Environmental authority EPML00865013 Norwich Park Mine Schedule I: Groundwater Condition Condition number

    page 35Groundwater, Monitoring and reporting
  127. I1

    Groundwater The holder of this environmental authority must not release contaminants to groundwater.

    page 36Groundwater
  128. I2

    Groundwater Monitoring and Management Program A Groundwater Monitoring and Management Program must be: a) developed by an appropriately qualified person; and b) implemented by the environmental authority holder for all stages of mining activities.

    page 36Groundwater, Monitoring and reporting
  129. I3

    The Groundwater Monitoring and Management Program required by condition I2 must: a) identify potential groundwater impacts due to the mining activities; b) include a site conceptual groundwater model; c) describe the sampling and monitoring methodology; d) detail an appropriate quality assurance and quality control program; and e) provide the process for notifying the administering authority and investigating exceedances in accordance with conditions I4-I5.

    page 36Groundwater, Monitoring and reporting
  130. I4

    Groundwater monitoring Groundwater quality and standing water levels must be monitored: a) at the locations and at the frequencies specified in Table I1 (Groundwater Monitoring Program); and b) for the characteristics specified in Table I2 (Groundwater Trigger Levels).

    page 36Groundwater, Monitoring and reporting
  131. I5

    If the groundwater contaminant trigger levels defined in Table I2 (Groundwater Trigger Levels) are exceeded on three (3) consecutive monitoring occasions, the environmental authority holder must complete an investigation into the potential for environmental harm and notify the administering authority within twenty (20) business days of receiving the analysis results. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine

    page 36Groundwater, Monitoring and reporting
  132. I6

    The Groundwater Monitoring and Management Program must be reviewed by 31 November 2023 and thereafter every two (2) years by an appropriately qualified person. The review report must: a) analyse the results of groundwater monitoring to: i. describe any impacts to groundwater levels and groundwater quality due to the mining activity; ii. determine trends in groundwater levels and groundwater quality; b) assess the adequacy of the Groundwater Monitoring and Management Program; and c) provide recommendations to the environmental authority holder to address the findings of parts (a) and (b) of the review.

    page 37Groundwater, Monitoring and reporting
  133. I7

    Within twenty (20) business days of receiving the review report, the environmental authority holder must provide to the administering authority: a) the review report; b) if applicable, any actions being taken by the environmental authority holder to address the recommendations of the review report; and c) if action is not being taken to address a recommendation, the environmental authority holder must provide justification for not taking action.

    page 37Monitoring and reporting
  134. I8

    Annual groundwater monitoring data must be submitted to the administering authority via WaTERS by 30 September each calendar year.

    page 37Groundwater, Monitoring and reporting
  135. I9

    Bore construction The construction, management, maintenance, and decommissioning of groundwater monitoring bores must be undertaken in a manner that: a) prevents contaminants entering the groundwater; b) ensures the integrity of the bores to obtain representative groundwater samples from the target aquifer; and c) maintains the hydrogeological environment within the aquifer. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine Table I1 (Groundwater Monitoring Program) Monitoring Location Easting Northing Monitoring (GDA94) (GDA94) Frequency Interpretation Bores

    page 37Groundwater, Monitoring and reporting
  136. P3

    649758 7489756.3 6 monthly Compliance Bores 6 monthly 6 monthly P2A_R1, 2 650914.1 7483162.7 6 monthly RN 43060 6 monthly 663843.4 7482400.7 6 monthly P6R3 RN 38547 650218.3 7496665.8 RN 43062 654266.62 7494832.06 658070.4 7487766.1 NOTES: 1. Replaces bore P2. 2. Bore P2A_R was installed in March 2021. Trigger values have not yet been developed due to limited available data set. The replacement bore will continue to be monitored and trigger levels will be developed where applicable once an adequate data set is obtained. 3. Replaces bore P6. Table I2 (Groundwater Trigger Levels) Quality Units Trigger Levels Characteristic P2A_R RN43060 P6R RN38547

    page 38Groundwater, Monitoring and reporting
  137. P3

    RN 43062 Water Level RL Fluctuations in excess of 2m per year excluding changes from pumping of licenced bores pH pH units 6.5 - 8.5 6.5 - 8.5 6.5 - 8.5 6.5 - 8.5 Electrical Conductivity -S/cm 15,820 7,450 7,450 11,520 Sulphate Dissolved mg/L Monitored 318 520 520 520 Aluminium mg/L for Dissolved mg/L TBC1 0.41 0.055 0.078 0.48 Antimony interpretive Dissolved purposes 0.0090 0.0090 0.0090 0.0090 Arsenic only - no Dissolved Iron triggers Dissolved Mercury apply mg/L 16 7.2 0.7 4.9 mg/L 0.00060 0.00060 0.00060 0.00060 Innovation Permit Environmental authority EPML00865013 Norwich Park Mine Quality Trigger Levels Characteristic Units

    page 38Groundwater, Monitoring and reporting
  138. P3

    P2A_R RN43060 P6R RN38547 RN 43062 Dissolved mg/L 0.034 0.034 0.034 0.034 Molybdenum mg/L mg/L 0.020 0.011 0.011 0.011 Dissolved g/L 0.056 0.0010 0.0010 0.39 Selenium g/L 20 20 20 20 Dissolved Silver 100 100 100 100 Total recoverable hydrocarbons C6-C10 Total recoverable hydrocarbons >C10 - C40 END OF CONDITIONS Innovation Permit Environmental authority EPML00865013 Norwich Park Mine Definitions Key terms and/or phrases used in this document are defined in this section. Environmental authority holders should note that where a term is not defined, the definition in the Environmental Protection Act 1994, its regulations or environmental protection policies must be used. If a word remains undefined it has its ordinary meaning. Acid rock drainage means any contaminated discharge emanating from a mining activity formed through a series of chemical and biological reactions, when geological strata is disturbed and exposed to oxygen and moisture as a result of mining activity. Administering authority is the agency or department that administers the environmental authority provisions under the Environmental Protection Act 1994. Airblast overpressure means energy transmitted from the blast site within the atmosphere in the form of pressure waves. The maximum excess pressure in this wave, above ambient pressure is the peak airblast overpressure measured in decibels linear (dBL). Alternative arrangement in relation to a sensitive place or a commercial place, means: a) A written agreement: i. between the environmental authority holder and a third party; ii. that identifies a particular type(s) of environmental nuisance; iii. about the way in which the particular environmental nuisance impact(s) will be dealt with; iv. at a particular location; and v. for a defined period of time. b) An alternative arrangement must make clear to the third party that by entering into the agreement that: i. their place will be excluded as a sensitive place or commercial place; and ii. the consequences of exclusion as a sensitive place or commercial place. Note: An alternative arrangement may include, but is not limited to, details of the nuisance abatement measures to be implemented, provision of alternative accommodation, or agreement between the parties that the location will not be considered a sensitive place or commercial place for the purposes of the Environmental Authority, for the duration of the

    page 39Noise and vibration
  139. F1

    of the environmental authority and is determined by the environmental authority holder to be potentially impacted by mine affected water releases; or b) a landholder or other party nominated by the administering authority; and c) the relevant local government authority; and d) the operator of a downstream water storage that supplies raw water to a local government or any other water user located between the nearest monitoring location listed in Table F1 or Table F2 of the operational policy and the release points specified in Table F1 of the environmental authority; and e) does not include a landholder or other party who by written agreement with the environmental authority holder has declined to be notified for the purpose of this condition. Prescribed environmental matters has the meaning in section 10 of the Environmental Offsets Act 2014, limited to the matters of State environmental significant listed in schedule 2 of the Environmental Offsets Regulation 2014. Protected area means a) a protected area under the Nature Conservation Act 1992; or b) a marine park under the Marine Parks Act 1992; or c) a World Heritage Area. Receiving environment, in relation to an activity that causes or may cause environmental harm, means the part of the environment to which the harm is, or may be, caused. The receiving environment includes (but is not limited to): a) a watercourse; b) groundwater; c) land; and d) sediments. Receiving waters means the waters into which this environmental authority authorises releases of mine affected water. Reference site (or analogue site) may reflect the original location, adjacent area or another area where rehabilitation success has been completed for a similar biodiversity. Details of the reference site may be as photographs, computer generated images and vegetation models etc. Innovation Permit Environmental authority EPML00865013 Norwich Park Mine Register of Regulated Structures includes: a) date of entry in the register; b) name of the dam, its purpose and intended/actual contents; c) the consequence category of the dam as assessed using the Manual for Assessing Consequence Categories and d) dates, names, and reference for the design plan plus dates, names, and reference numbers of all document(s) lodged as part of a design plan for the dam; e) name and qualifications of the suitably qualified and experienced person who certified the design plan and 'as constructed' drawings; f) for the regulated dam, other than in relation to any levees - i. the dimensions (metres) and surface area (hectares) of the dam measured at the footprint of the dam; ii. coordinates (latitude and longitude in GDA94) within five metres at any point from the outside of the dam including its storage area iii. dam crest volume (megalitres); iv. spillway crest level (metres AHD). v. maximum operating level (metres AHD); vi. storage rating table of stored volume versus level (metres AHD); vii. design storage allowance (megalitres) and associated level of the dam (metres AHD); viii. mandatory reporting level (metres AHD); g) the design plan title and reference relevant to the dam; h) the date construction was certified as compliant with the design plan; i) the name and details of the suitably qualified and experienced person who certified that the constructed dam was

    page 49Rehabilitation, Groundwater, Surface water, Regulated structures, Land and soil, Biodiversity, Monitoring and reporting