Queensland Mining Approvals IndexMining Capital Funds

Data as at 14 September 2026 · from the Queensland EP Act public register

Minerals environmental authority

EPML00715513 · Mine

Minerals environmental authority EPML00715513 (Mine), Granted. 96 conditions indexed. Holds PRC plan P-PRCP-100790466.

Status
Granted
Holders
DINGO MINERALS PTY LTD
Tenures
ML2640
PRC plan
P-PRCP-100790466 · effective 2026-04-23
How it was read
Numbered conditions
Register
Register record · Instrument PDF

Conditions

96 numbered conditions read from the current instrument. Page numbers link into the register PDF.

  1. A1

    This environmental authority authorises environmental harm referred to in the conditions. Where there is no condition or this environmental authority holder is silent on a matter, the lack of a condition or silence does not authorise environmental harm.

  2. A2

    In carrying out the mining activity authorised by this environmental authority, the holder of this environmental authority must comply with Schedule I - Map 1 (Project Infrastructure Layout - Mine Area).

  3. A3

    In carrying out the mining activity authorised by this environmental authority, the holder of this environmental authority must comply with Schedule A - Table A1 - Authorised activities and disturbance areas. Table A1 - Authorised activities and disturbance areas Domain Infrastructure Type Maximum disturbance Area (ha) Void Open Cut Pit 5.26 Safety management disturbance 1.04 3.21 Exclusion area Potential Instability Zone 2.5 Waste Rock Dump Disturbed Area 6.07 Undisturbed Area (within exclusion zone)1 1.04 Waste Rock Dump 1.86 0.47 ROM Pad 0.88 0.33 Stockpile / Loading Areas 0.84 6.13 Workshop 0.9 0.37 Fuel Storage Area 0.86 0.91 Explosives Storage Area 1.56 0.86 Infrastructure Internal Access Roads 4.39 Offices / Ablutions 2.88 5.10 Heli Pad 0.4 2.50 Accommodation Camp 0.28 41.7 Camp Access Road 129.43 Laydown Area Batch Plant Dams South Sediment Dam Undisturbed Area (within exclusion zone)2 West Mine Water Dam STP Sewage Irrigation Area Stormwater Management Eastern Diversion Drain Water Management Infrastructure (sumps, bunds) TOTAL AREA OF LAND DISTURBANCE (ha) TOTAL MINE LEASE AREA (ha) 1 This area will remain undisturbed and will not require any rehabilitation activities, per Schedule I - Map 5. 2 This area will remain undisturbed and will not require any rehabilitation activities, per Schedule I - Map 6. OFFICIAL Permit

    page 5Rehabilitation, Surface water, Regulated structures, Waste, Land and soil
  4. A4

    The holder of this environmental authority must: a) Install all measures, plant and equipment necessary to ensure compliance with the conditions of this environmental authority; b) Maintain such measures, plant and equipment in proper condition; c) Operate such measures, plant and equipment in a proper and efficient manner; d) Ensure all instruments and devices used for the measurement or monitoring of any parameter under any condition of this environmental authority are properly calibrated. Monitoring

    page 6Monitoring and reporting
  5. A5

    Except where specified otherwise in another condition of this environmental authority, all monitoring records and reports required by this environmental authority must be kept for a period of not less than 5 years and be made available on request.

    page 6Monitoring and reporting
  6. A6

    Where monitoring is a requirement of this environmental authority, ensure that an appropriately qualified person conducts all monitoring.

    page 6Monitoring and reporting
  7. A7

    All analyses, monitoring and tests required to be conducted under this environmental authority must be carried out by a laboratory that has NATA certification for such analyses, monitoring and tests, except as otherwise authorised by the administering authority. Financial Assurance

    page 6Monitoring and reporting
  8. A8

    The activity must not be carried out until the environmental authority holder has given financial assurance to the administering authority as security for compliance with this environmental authority and any costs or expenses, or likely costs and expenses, mentioned in section 298 of the Act.

  9. A9

    The amount of the financial assurance must be reviewed by the holder of this environmental authority when a plan of operations is amended or replaced or the authority is amended. Risk Management

  10. A10

    The holder of this environmental authority must develop and implement a risk management system for mining activities which conforms to the Standard for Risk Management (ISO31000:2009) or the latest edition of the equivalently recognised Standard for Risk Management by 31 January 2014. Notification of Emergencies, Incidents and Exceptions

    page 6Monitoring and reporting
  11. A11

    The holder of this environmental authority must notify the administering authority by written notification as soon as practicable but within twenty-four (24) hours, after becoming aware of any emergency or incident which results in the release of contaminants not in accordance, or reasonably expected to be not in accordance with the conditions of this environmental authority.

    page 6Monitoring and reporting
  12. A12

    Within 10 days following the initial notification of an emergency or incident, or receipt of monitoring results, which is the latter, further written advice must be provided to the administering authority, including the following: a) Results and interpretation of any samples taken and analysed; b) Outcomes of any actions taken at the time to prevent or minimise unlawful environmental harm; c) Proposed action to prevent a recurrence of the emergency or incident. Complaints

    page 6Monitoring and reporting
  13. A13

    The holder of this environmental authority must record all environmental complaints received about the mining activities including the following details: a) Name, address and contact number for of the complainant; OFFICIAL Permit Environmental authority EPML00715513 b) Time and date of complaint; c) Reasons for the complaint; d) Investigations undertaken; e) Conclusions formed; f) Actions taken to resolve the complaint; g) Any abatement measures implemented; and, h) Person responsible for resolving the complaint.

    page 6Monitoring and reporting
  14. A14

    The holder of this environmental authority must, when requested by the administering authority, undertake relevant specified monitoring within a timeframe nominated by the administering authority to investigate any complaint of environmental harm. The results of the investigation (including an analysis and interpretation of the monitoring results) and abatement measures implemented must be provided to the administering authority within ten (10) business days of completion of the investigation, or no later than ten (10) business days after the end of the timeframe nominated by the administering authority to undertake the investigation. Third Party Audit

    page 7Monitoring and reporting
  15. A15

    The holder of this environmental authority must: a) Within one (1) year of the commencement of this authority, obtain from an appropriately qualified person a report on compliance with the conditions of this environmental authority; b) Obtain further such reports at regular intervals, not exceeding three (3) yearly intervals, from the completion of the report referred to above; and c) Provide each report to the administering authority within 90 days of its completion.

    page 7Monitoring and reporting
  16. A16

    Where a condition of this environmental authority requires compliance with a standard published externally to this authority and the standard is amended or changed subsequent to the issues of this authority the holder must: a) Comply with the amended or changed standard within 12 months of the amendment of change being made, unless a different period is specified in the amended standard or relevant legislation; and b) Until compliance with the amended or changed standard is achieved, continue to remain in compliance with the standard that was current immediately prior to the relevant amendment or change. Exploration

  17. A17

    All exploration activities carried out on the mining leases must comply with each of the Standard Environmental Conditions contained in the most recent version of the Code of Environmental Compliance for Exploration and Mineral Development Projects (the Code). Where there is a discrepancy between the Code and this environmental authority, the conditions of this environmental authority apply. Definitions

  18. A18

    Words and phrases used throughout this environmental authority are defined in Schedule H - Definitions. Where a definition for a term used in this environmental authority is sought and the term is not defined within this environmental authority, the definitions in the Environmental Protection Act 1994, its Regulations and Environmental Protection Policies must be used. END OF CONDITIONS FOR SCHEDULE A OFFICIAL Permit Environmental authority EPML00715513 Schedule B - Air Dust and Particulate Matter Monitoring

    page 7Air, Monitoring and reporting
  19. C1

    Contaminants that will, or have the potential to cause environmental harm must not be released directly or indirectly to any waters as a result of the authorised mining activities, except as permitted under the conditions of this environmental authority.

  20. C2

    The release of contaminants to waters must: a) only occur during flow events in the receiving waters; b) only occur from the release points specified in Table C1 - Release Points and depicted in Schedule I, Map 2 - Monitoring Sites for Surface Water and Sediments; and, c) be monitored at the release point and at the monitoring frequency specified in Table C1 - Release Points for the total daily volume of water released and for each parameter specified in Table C2 - Release Quality Objectives. Table C1 - Release Points Release Map Reference Mine Affected Monitoring Receiving Monitoring Frequency Point (GDA94, MGA, Zone 54) Water Source Point Water and Location Easting Northing Description West Mine 400830 7701831 Pit water, Dam Lunch Creek One sample must be taken Water Dam infrastructure spillway1 tributary within 12 hours of area, ROM commencement of release; pad When a release event has a duration of 24 hours or greater, samples must be South 401243 7701460 Waste rock Dam Lunch Creek taken daily for one week, Sediment dump spillway1 tributary and once a week thereafter Dam until release ceases. 1 All reasonable and practical measures must be taken to access sample location where it is safe to do so. Monitoring is subject to safe access. Table C2 - Release Quality Objectives Quality Units Contaminant Release Limit Characteristic1 pH pH 6.0 or 20th percentile of reference site concentration, whichever is lower 7.5 or 80th percentile of reference site concentration, whichever is higher. EC -S/cm 20 x 80th percentile of reference site concentration3 Sulphate mg/L 20 x 80th percentile of reference site concentration3 Aluminum mg/L 0.055 x 202 or 20 x 80th percentile of reference site concentration3 whichever is higher Arsenic4 mg/L 0.013 x 202 or Boron mg/L 20 x 80th percentile of reference site concentration3 whichever is higher Cadmium mg/L 0.37 x 202 or 20 x 80th percentile of reference site concentration3 whichever is higher 0.002 x 202 or 20 x 80th percentile of reference site concentration3 whichever is higher

    page 9Surface water, Regulated structures, Waste, Land and soil, Monitoring and reporting
  21. C3

    Release of contaminants to the receiving environment must not exceed the contaminant limits specified in Table C2 - Release Quality Objectives.

  22. C4

    At the time of release the water flow volume in the receiving water must be at least twenty (20) times the volume at which respective mine affected water are released. Receiving Environment Monitoring

    page 10Surface water, Monitoring and reporting
  23. C5

    The release of contaminants from the authorised activity to surface waters must not exceed the water quality objectives stated in Table C4 - Receiving Water and Sediment Quality Objectives when measured at the compliance point stated Table C3 - Receiving Water Monitoring Locations. Table C3 - Receiving Water Monitoring Locations Monitoring Receiving Waters Location Description Map Reference Point (GDA94, MGA, Zone 54) Easting Northing Reference* Monitoring Points

    page 10Surface water, Land and soil, Monitoring and reporting
  24. MC3

    5 km from the Project site, flows into Lunch Creek 396034 7699445

  25. MC5

    Drainage west of Project site which ultimately flows into 400407 7701273 Lunch Creek Upstream Monitoring Points

    page 10Monitoring and reporting
  26. MC7

    Drainage in the northwest portion of the site, ultimately flows 400969 7702645 into Lunch Creek Downstream Monitoring points

    page 10Monitoring and reporting
  27. MC4

    Lunch Creek, 3 km downstream of the project site 404281 7700975

  28. MC6

    Directly downstream of the mine infrastructure area 400527 7701876 *Reference sites must: a) be from the same bio-geographic and climatic region; b) have similar geology, soil types and topography; c) contain a range if habitats similar to those at the test sites; d) be of a similar follow regime; and e) not be so close to the test sites that any disturbances at the test site also results in a change at the reference site. The data from reference monitoring points must not be used where they are affected by releases from other mines. OFFICIAL Permit Environmental authority EPML00715513 Table C4 - Receiving Water and Sediment Quality Objectives Parameter1 Water Quality Objective Sediment Quality Objective2 (mg/L unless otherwise specified) (mg/kg dry wt, unless otherwise specified) pH (pH units) 6.0 - 7.53 EC (-S/cm) 2504 or 80th percentile of reference site Not applicable concentration7, whichever is higher Dissolved oxygen For interpretative purposes only Major cations For interpretive purposes only Not applicable Major anions Sulphate 80th percentile of reference site 2 x 80th percentile of reference site concentration7 concentration7 Aluminium 0.0553 or 80th percentile of reference 2 x 80th percentile of reference site site concentration7, whichever is higher concentration Arsenic5 0.0133 or 80th percentile of reference 706 or 2 x 80th percentile of reference site site concentration7, whichever is higher concentration7, whichever is higher Boron 0.0373 or 80th percentile of reference 2 x 80th percentile of reference site site concentration7, whichever is higher concentration7 Cadmium 0.00023 or 80th percentile of reference 106 or 2 x 80th percentile of reference site site concentration7, whichever is higher concentration7, whichever is higher Cobalt 80th percentile of reference site 2 x 80th percentile of reference site concentration7 concentration7 Copper 0.00143 or 80th percentile of reference 2706 or 2 x 80th percentile of reference site site concentration7, whichever is higher concentration7, whichever is higher Lead 0.00343 or 80th percentile of reference 2206 or 2 x 80th percentile of reference site site concentration7, whichever is higher concentration7, whichever is higher Manganese 1.93 o or 80th percentile of reference 2 x 80th percentile of reference site site concentration7, whichever is higher concentration7

    page 10Surface water, Land and soil, Biodiversity, Monitoring and reporting
  29. C6

    By 31 March 2014, the environmental authority holder must develop and implement a Receiving Environment Monitoring Program (REMP) to monitor, identify and describe any adverse impacts to surface water environmental values, quality and flows due to the authorised mining activity. This must include monitoring the effects of the mine on the receiving environment periodically (under natural flow conditions) and while mine affected water is being discharged from the site. The REMP must also include the condition of recording and monitoring the effects of the release of contaminants on the receiving environment and whilst the contaminants are being released from the licensed place. For the purposes of the REMP, the receiving environment is the waters of the Lunch Creek and connected or surrounding waterways within 10 km downstream of the release. The REMP should encompass any sensitive receiving waters or environmental values downstream of the authorised mining activity that will potentially be directly affected by an authorised release of mine affected water.

    page 12Surface water, Monitoring and reporting
  30. C7

    A REMP design document that addresses the requirements of the REMP must be prepared and made available to the administrating authority upon request.

  31. C8

    A report outlining the findings of the REMP, including all monitoring results and interpretations must be prepared annually and made available on request to the administrating authority. This must include an assessment of background reference water quality, the condition of downstream water quality compared against water quality objectives, and the suitability of current discharge limits to protect downstream environmental values. Water Management Plan

    page 12Monitoring and reporting
  32. C9

    A Water Management Plan must be developed by an appropriately qualified person and implemented. Stormwater, Sediment and Erosion Controls

    page 12Surface water, Land and soil
  33. C10

    An Erosion and Sediment Control Plan must be developed by an appropriately qualified person and implemented for all stages of the mining activities on the site to minimise erosion and the release of sediment to receiving waters and contamination of stormwater. Groundwater

    page 12Groundwater, Surface water, Land and soil
  34. C11

    The holder of this environmental authority must not release contaminants to groundwater.

    page 12Groundwater
  35. C12

    The extraction of groundwater must not cause environmental harm to any groundwater dependent ecosystems.

    page 12Groundwater
  36. C13

    Groundwater quality and levels must be monitored: a) at the locations specified in Table C5 (Groundwater Monitoring Locations and Frequency); and b) at the frequencies specified in Table C5 (Groundwater Monitoring Locations and Frequency); and c) for the quality characteristics identified in Table C6 (Groundwater Quality Objectives). OFFICIAL Permit Environmental authority EPML00715513 Table C5 - Groundwater Monitoring Locations and Frequency Monitoring Map Reference Surface Depth Screened Monitoring Frequency Point (GDA94, MGA, Zone 54) RL1 (m) RL1 (m) interval Easting Northing RL1 (m) MCWMB01 400450 7702066 490 72 66-72 Standing Groundwater Water Level Quality Monthly Quarterly MCWMB04 400424 7702533 484 100 94-100 Monthly Quarterly MCWMB05 400428 7702527 484 30 25-31 Monthly Quarterly MCWMB06 400930 7702230 449 100 94-100 Monthly Quarterly MCWMB07 400949 7702235 449 30 24-30 Monthly Quarterly MCWMB08 401292 7701396 406 30 24-30 Monthly Quarterly MCWMB09 401295 7701393 406 100 94-100 Monthly Quarterly (Observation bore) *Monitoring locations depicted in Schedule I Map 3 - Groundwater Monitoring Locations 1RL must be measured to the nearest 5cm from the top of the bore casing. Table C6 - Groundwater quality objectives MCWMB04, MCWMB05, MCWMB09 Limit A2 Limit B3 Contaminant1 Units MCWMB01 MCWMB06, MCWMB07, pH pH Limit type MCWMB08 Limit A2 Limit B3 Limit A2 Limit B3 Range - 6-8.5 - 6-8.5 Electrical -S/cm Maximum 1756 1791 1324 1425 conductivity (EC)

    page 12Groundwater, Monitoring and reporting
  37. C14

    Groundwater measured from any compliance bore specified in Table C5 - Groundwater Monitoring Locations and Frequency must not exceed the corresponding Limit A specified in Table C6 - Groundwater quality objectives on any five consecutive sampling occasions. OFFICIAL Permit Environmental authority EPML00715513

    page 13Groundwater, Monitoring and reporting
  38. C15

    Groundwater measured from any compliance bore specified in Table C5 - Groundwater Monitoring Locations and Frequency must not exceed the corresponding Limit B specified in Table C6 - Groundwater quality objectives on any three consecutive sampling occasions.

    page 14Groundwater, Monitoring and reporting
  39. C16

    If groundwater measured from any compliance bore specified in Table C5 - Groundwater Monitoring Locations and Frequency exceeds the corresponding Limit B specified in Table C6 - Groundwater quality objectives on any one sampling occasion the environmental authority holder must resample the groundwater within the compliance bore for all exceeding parameters within ten business days of receipt of results. Bore construction and maintenance and decommissioning

    page 14Groundwater, Monitoring and reporting
  40. C17

    The construction, maintenance and decommissioning of groundwater monitoring bores must be undertaken in a manner that: a) prevents contaminants entering the groundwater; and b) ensures the integrity of the bores to obtain representative groundwater samples from the target aquifer; and c) maintains the hydrogeological environment within the aquifer.

    page 14Groundwater, Monitoring and reporting
  41. C18

    A bore drill log must be kept for each reference, compliance and observation groundwater monitoring bore which includes: a) bore identification reference and geographic coordinate location; b) specific construction information including but not limited to depth of bore, depth and length of casing, depth and length of screening and bore sealing details; c) standing groundwater level and water quality parameters including physical parameters and results of laboratory analysis for the possible trigger parameters; d) lithological data and stratigraphic interpretation by an appropriately qualified person to identify important features associated with groundwater monitoring; and e) target aquifer formation of the bore. Groundwater Management Program

    page 14Groundwater, Monitoring and reporting
  42. C19

    A Groundwater Management Program must be developed, documented and implemented by appropriately qualified persons.

    page 14Groundwater
  43. C20

    The Groundwater Management Program required by Condition C19 must: a) identify potential sources of contamination to groundwater from the activity; and b) ensure that all potential groundwater impacts due to the activity are identified, monitored and mitigated; and c) document sampling and monitoring methodology; and d) ensure that adequate groundwater monitoring and data analysis is undertaken to achieve the following objectives: i. detect any impacts to groundwater levels due to the activity; ii. detect any impacts to groundwater quality due to the activity; OFFICIAL Permit Environmental authority EPML00715513 iii. determine compliance with condition C14 and C15; and iv. determine trends in groundwater quality; and e) include an appropriate quality assurance and quality control program; and f) include a conceptual groundwater model; and g) include a review process to identify improvements to the program that includes addresses any comments provided by the administering authority.

    page 14Groundwater, Monitoring and reporting
  44. C21

    The Groundwater Management Program must be reviewed on an annual basis by an appropriately qualified person to determine if it continues to meet the requirements stated in condition C20. Monitoring and Sampling

    page 15Groundwater, Monitoring and reporting
  45. C22

    Monitoring and sampling must be carried out in accordance with written procedures and must address the requirements of the latest version of the following documents unless otherwise approved by the administering authority: a) for waters and aquatic environments, the Queensland Government's Monitoring and Sampling Manual - Environmental Protection (Water) Policy; b) for groundwater, Groundwater Sampling and Analysis - A Field Guide (2009:27 GeoCat#6890.1) and Australian Standard AS/NZS 5667.11:1998 Water Quality - Sampling - Guidance on sampling of groundwaters; c) for subterranean aquatic fauna, the Guideline for the Environmental Assessment of Subterranean Aquatic Fauna. Sewage Treatment

    page 15Groundwater, Biodiversity, Monitoring and reporting
  46. C23

    The only contaminant permitted to be released to land is treated sewage effluent in compliance with the release limits stated in Table C7 - Treated Effluent Contaminant Release Limits to Land. Table C7 - Treated Effluent Contaminant Release Limits to Land Quality Characteristic Unit Release limit Limit Range Monitoring Frequency Monthly pH pH units 6.0 - 9.0 Range 5 day Biochemical mg/L 20 Maximum Oxygen Demand (BOD) Total Suspended solids mg/L 30 Maximum Nitrogen mg/L 30 Maximum Phosphorus mg/L 15 Maximum E-coli Colonies per 100 1,000 Maximum millilitres

    page 15Monitoring and reporting
  47. C24

    Treated sewage effluent may only be released to land in accordance with the conditions of this approval at the following locations: a) Within the nominated area(s) identified in Schedule I - Map 4, Sewage Treatment Plant and Effluent Disposal; b) Other land for the purpose of dust suppression and/or fire fighting.

  48. C25

    The application of treated effluent to land must be carried out in a manner such that: a) Vegetation is not damaged; b) There is no surface ponding of effluent; OFFICIAL Permit Environmental authority EPML00715513 c) There is no run-off of effluent.

    page 15Biodiversity
  49. C26

    If areas irrigated with effluent are accessible to employees or the general public, prominent signage must be provided advising that effluent is present and care should be taken to avoid consuming or otherwise coming into unprotected contact with the effluent.

  50. C27

    All sewage effluent released to land must be monitored at the frequency and for the parameters specified in Table C7 - Treated Effluent Contaminant Release Limits to Land.

    page 16Monitoring and reporting
  51. C28

    The daily volume of effluent release to land must be measured and records kept of the volumes of effluent released.

    page 16Monitoring and reporting
  52. C29

    When circumstances prevent the irrigation or beneficial reuse of treated sewage effluent such as during or following rain events, waters must be directed to a wet weather storage or alternative measures must be taken to store / lawfully dispose of effluent.

  53. C30

    A maximum area of 0.5ha of land, excluding any necessary buffer zones, may be utilised for the irrigation and / or beneficial reuse of treated sewage effluent.

  54. C31

    Treated sewage effluent must only be supplied to another person or organisation that has a written plan detailing how the user of the treated sewage effluent will comply with their general environmental duty under section 319 of the Act whilst using the treated sewage effluent. END OF CONDITIONS FOR SCHEDULE C OFFICIAL Permit Environmental authority EPML00715513 Schedule D - Noise and Vibration

    page 16Noise and vibration
  55. D1

    Noise and vibration from any mining activity must not cause environmental harm at any sensitive place or commercial place. Noise Limits

    page 17Noise and vibration
  56. D2

    The holder of this environmental authority must ensure that noise generated by the mining activities does not cause the criteria in Table D1 - Noise Limits to be exceeded at a sensitive place. Table D1 - Noise Limits, Sensitive Place Noise Level (d(b)A Monday to Saturday Sundays and Public Holidays measured as: 7am~6pm 6pm~10pm 10pm~7am 9am~6pm 6pm~10pm 10pm~9am LAeq, adj, 15 mins CV = 50 CV = 45 CV = 40 CV = 45 CV = 40 CV = 35 AV = 5 AV = 5 AV = 0 AV = 5 AV = 5 AV = 0 LA1, adj, 15 mins CV = 55 CV = 50 CV = 45 CV = 50 CV = 45 CV = 40 AV = 10 AV = 10 AV = 5 AV = 10 AV = 10 AV = 5 Notes: a) CV: Critical Value, AV: Adjustment Value b) To calculate noise limits; If bg (CV-AV): Noise limit = bg + AV If (CV-AV) < bg CV: Noise limit = CV If bg > CV: Noise limit = bg+0 c) In the event that measured bg (LA90,adj, 15 mins) is less than 30 dB(A), then 30 dB(A) can be substituted for the measured background level. d) Bg = background noise level (LA90, adj, 15 mins) measured over 3 - 5 days at the nearest sensitive receptor. e) If the project is unable to meet the noise limits as calculated above alternative limits may be calculated using the process outlined in the `Planning for Noise Control' guideline.

    page 17Noise and vibration
  57. D3

    The method of measurement and reporting of noise levels must comply with the most recent edition of the administering authority's Noise Measurement Manual or the most recent version of AS1055 Acoustics - Description and measurement of environmental noise. Air-blast Overpressure Nuisance

    page 17Noise and vibration, Monitoring and reporting
  58. D4

    The holder of this environmental authority must ensure that blasting does not cause the limits for peak particle velocity and air-blast overpressure in Table D2 - Blasting Noise Limits to be exceeded at sensitive or commercial places. Table D2 - Blasting Noise Limits Blasting Noise Sensitive or Commercial Blasting Noise Place limits Limits 7 am to 6 pm 6 pm to 7 am No blasting Air-blast 115 dB (linear) Peak for 9 out of 10 consecutive blasts initiated No blasting Overpressure and not greater than 120 dB (linear) Peak at any time. Ground Vibration 5mm/sec peak particle velocity for 9 out of 10 consecutive Peak Particle blasts and not greater than 10 mm/second peak particle Velocity velocity at any time. END OF CONDITIONS FOR SCHEDULE D OFFICIAL Permit Environmental authority EPML00715513 Schedule E - Waste Management Waste Management

    page 17Noise and vibration, Waste
  59. E1

    A Waste Management Plan, in accordance with the Environmental Protection (Waste Management) Policy 2000, must be included in the Plan of Operations. The Waste Management Plan must include re- using and recycling where possible, and a program for safe recycling or disposal of all wastes, and a disposal procedure for hazardous wastes.

    page 18Waste
  60. E2

    Unless otherwise permitted by the conditions of this Environmental Authority or with prior approval from the administering authority and in accordance with a relevant standard operating procedure, waste must not be burnt.

    page 18Waste
  61. E3

    The holder of this environmental authority may burn vegetation cleared in the course of carrying out extraction activities provided the activity does not cause environmental harm at any sensitive or commercial place. END OF CONDITIONS FOR SCHEDULE E OFFICIAL Permit Environmental authority EPML00715513 Schedule F - Land and Rehabilitation

    page 18Rehabilitation, Biodiversity
  62. F1

    Land disturbed by mining must be rehabilitated in accordance with Table F1 Rehabilitation Requirements. Table F1 Rehabilitation Requirements Mine Mine Feature Rehabilitation Rehabilitation Indicators Completion Criteria Objective Engineered Domain Names Goal Site safe for structures and Rehabilitation report: that human and signage to preclude all safety precautions Void Open Cut Safe animals humans and have been taken in animals (e.g., safety accordance with the Non-polluting Hazardous and bund wall and relevant legislation. Stable contaminated fencing) material Safety assessment Rehabilitation report: Waste Rock Waste rock Safe adequately of final landform by certification structurally Dump dump (including Non-polluting managed. suitably qualified sound and safe UG Laydown Minimal person. areas, UG mine probability of wall Rehabilitation report: water treatment failure or rock Geotechnical geotechnical studies to plant, PAF falls that will studies of final voids determine whether final stockpile area, cause significant landform is stable. crushing and environmental Risk assessment of concrete plants. harm. final landform Rehabilitation report: appropriate risk Stable Site safe for Safety assessment assessment and control humans and of final landform by measures undertaken. animals suitably qualified Rehabilitation report: person. certification structurally Hazardous and Engineers sound and safe contaminated assessment of material cover or final Engineers certification in adequately landform design rehabilitation report that managed. the waste disposal site Rehabilitation has been securely Minimal monitoring plan in covered to prevent any probability of place to monitor release or seepage of subsidence or downstream hazardous or rock falls that will surface/ground contaminated material. cause significant water Rehabilitation report: environmental monitoring data harm Geotechnical demonstrates the cover Vegetation cover studies of final is functioning in to minimise landforms preventing any release or seepage of hazardous or Vegetation contaminated material. assessment Rehabilitation report: geotechnical studies to determine whether final landform is stable. Rehabilitation report: revegetation meets the OFFICIAL Permit Environmental authority EPML00715513 Mine Mine Feature Rehabilitation Rehabilitation Indicators Completion Criteria Domain Names

    page 19Rehabilitation, Waste, Subsidence, Biodiversity, Monitoring and reporting
  63. F2

    Rehabilitation must commence progressively in accordance with the Plan of Operations. Contaminated Lands

    page 22Rehabilitation
  64. F3

    Before applying for surrend er of a mining lease, the holder must (if applicable) provide to the administering authority a site investigation report under the Act, in relation to any part of the mining lease which has been used for a notifiable activity or which the holder is aware is likely to be contaminated land, and also carry out any further work that is required as a result of that report to ensure that the land is suitable for its final land use.

    page 22Monitoring and reporting
  65. F4

    Before applying for progressive rehabilitation certification for an area, the holder must (if applicable) provide the administering authority a site investigation report under the Act, in relation to any part od the area the subject of the application which has been used for notifiable activities or which the holder is aware is likely to be contaminated land, and also carry out any further work that is required as a result of the report to ensure that the land is suitable for its final land use under condition F1.

    page 22Rehabilitation, Monitoring and reporting
  66. F5

    Minimise the potential for contamination of land by hazardous contaminants. Chemicals and Flammable or Combustible Liquids

    page 22Waste
  67. F6

    All explosives, hazardous chemicals, corrosive substances, toxic substances, gases, flammable or combustible liquids and dangerous goods must be stored and handled in accordance with the current, relevant Australian Standard where such is applicable.

    page 22Waste
  68. F7

    Notwithstanding the requirements of any Australian Standard, any liquids stored on site that have the potential to cause environmental harm must be stored in or serviced by an effective containment system that is impervious to the materials stored and managed to prevent the release of liquids to waters or land. OFFICIAL Permit Environmental authority EPML00715513

  69. F8

    Where no relevant Australian Standard is available, the following must be applied: a) Storage tanks must be bunded so that the capacity and construction of the bund is sufficient to contain at least 110% of a single storage tank or 100% of the largest storage tank plus 10% of the second largest storage tank in multiple storage areas; and b) Drum storages must be bunded so that the capacity and construction of the bund is sufficient to contain at least 25% of the maximum design storage volume within the bund.

  70. F9

    All containment systems must be designed to minimise rainfall collection within the system. Biodiversity offsets

    page 23Biodiversity
  71. F10

    Significant residual impacts to prescribed environmental matters, other than if the impacts were authorised by an existing authority issued before the commencement of the Environmental Offsets Act 2014 are not authorised under this environmental authority or the Environmental Offsets Act 2014 unless the impact is specified in Table F2 - Significant residual impacts to prescribed environmental matters. Table F2- Significant residual impacts to prescribed environmental matters Prescribed environmental matter Location of impact Maximum extent (GDA94 - Zone 54) of impact Protected wildlife habitat Habitat for an animal that is vulnerable wildlife - 401021mE; 7701806mN 1.5ha Purple-necked rock wallaby Petrogale purpuriecollis

    page 23Biodiversity
  72. F11

    Records demonstrating that each impact to a prescribed environmental matter not listed in Table F2 - Significant residual impacts to prescribed environmental matters did not, or is not likely to, result in a significant residual impact to that matter must be: a) Completed by an appropriately qualified person; and b) Kept for the life of the environmental authority

    page 23Monitoring and reporting
  73. F12

    An environmental offset made in accordance with the Environmental Offsets Act 2014 and Queensland Offsets Policy, as amended from time to time, must be undertaken for the maximum extent of impact to each prescribed environemtal matter authorised in Table 2 - Significant residual impacts to prescribed environmental matters.

    page 23Biodiversity
  74. F13

    The notice of election for the environmental offset required by condition F12 must be provided to the administering authority no less than (3) months before the proposed commencement of the significant residual impacts for which the environmental offset is required. END OF CONDITIONS FOR SCHEDULE F OFFICIAL Permit Environmental authority EPML00715513 Schedule G - Regulated Dams

    page 23Regulated structures, Biodiversity
  75. G1

    The Design Storage Allowance for Dams specified in the Code for Mining Lease Projects and this Environmental Authority are a minimum design storage requirement and any releases from any dams must meet the requirements set out under Schedule C - Water.

    page 24Regulated structures
  76. G2

    The hazard category of each dam must be determined by a suitably qualified and experienced person, prior to its construction and at least once every two years thereafter.

    page 24Regulated structures
  77. G3

    Construction of any dam determined to be in the significant or high hazard category (i.e., a regulated dam) must not be commenced unless the location, basic details, and hydraulic performance of that dam are specifically referenced in this environmental authority.

    page 24Regulated structures
  78. G4

    On cessation of operation of any dam, that dam must be maintained so as to avoid environmental harm until that dam is decommissioned.

    page 24Regulated structures
  79. G5

    Prior to the cessation of the environmentally relevant activity, each dam must be decommissioned such that it either: a) Becomes a stable landform, that no longer contains flowable substances, or b) Is approved or authorised under relevant legislation for a beneficial use, or c) Is a void authorised by the administering authority to remain after decommissioning; and d) Is compliant with the rehabilitation requirements of this environmental authority.

    page 24Rehabilitation, Regulated structures
  80. G6

    The following regulated dams must be wholly located within the control points defined in Table G1 - Location of Regulated Dams Containing Hazardous Waste below. Table G1 - Location of Regulated Dams Containing Hazardous Waste Name of Regulated Dam Map Reference Northing Containing Hazardous Waste (GDA94, MGA, Zone 54) Easting West Mine Water Dam 400990 7701870 South Sediment Dam 401218 7701500

    page 24Regulated structures, Waste, Land and soil
  81. G7

    The following regulated dams must be consistent with the basic details in Table G2 - Size and Purpose of Dams Containing Hazardous Waste below. Table G2 - Size and Purpose of Regulated Dams Containing Hazardous Waste Name of Regulated Maximum Surface Maximum Maximum Dam Containing Area of Contents Volume of Depth of Dam Purpose of Dam Hazardous Waste in Dam (ha) Dam (m3) (m) West Mine Water 1.6 112,330 12 Site water collection and storage Dam South Sediment 3.0 114,920 18 Site water collection and storage Dam

    page 24Regulated structures, Waste, Land and soil
  82. G8

    The following regulated dams must meet the hydraulic performance criteria specified in Table G3 - Hydraulic Performance of Regulated Dams. OFFICIAL Permit Environmental authority EPML00715513 Table G3 - Hydraulic Performance of Regulated Dams Dam Name Design Storage Allowance1 Spillway Mandatory 3 Design Storm2 Reporting Level West Mine Water Dam 1:20 AEP 1:100 AEP 1:10 AEP 72 hr duration South Sediment Dam 1:20 AEP 1:100 AEP 1:10 AEP 72 hour duration NOTE: Calculations are to be carried out in accordance with the "Manual for Assessing Hazard Categories and Hydraulic Performance of 1 A regulated dam must be designed and operated such that, (a) sufficient available storage is maintained to accommodate expected inputs and outputs during the year; and (b) the DSA is provided for at the 1 November for the coming wet season. 2 The spillway design storm has a duration that produces the peak discharge for the catchment. 3 The level below spillway crest that can accommodate runoff from a 72-hour storm or wave allowance of the nominated AEP, whichever is lower.

    page 24Regulated structures, Land and soil, Monitoring and reporting
  83. G9

    The spillway for any dam containing hazardous waste constructed within the operational land must be designed to withstand the peak flow from the spillway design storm in Table G3 - Hydraulic Performance of Regulated Dams.

    page 25Regulated structures, Waste
  84. G10

    Construction of a regulated dam must not be commenced unless: a) The licensee has submitted to the administering authority two copies of a design plan, together with the certification of a suitably qualified and experienced person that the design of the regulated dam will deliver the performance stated in that submitted design plan and that dam is compliant in all respects with this environmental authority, and b) At least twenty (20) business days has passed since the receipt of those documents, or the administering authority notifies the licensee that a design plan and certification has been submitted for that dam.

    page 25Regulated structures, Monitoring and reporting
  85. G11

    Every regulated dam must be constructed in accordance with a certified design plan that has been submitted to the administering authority, and such that the resulting dam will deliver the performance stated in that submitted design plan and that dam is compliant in all respects with this environmental authority.

    page 25Regulated structures
  86. G12

    When construction of any regulated dam is complete and prior to commencing operation of that dam, the licensee must submit to the administering authority two copies of a set of `as constructed' drawings, together with the certification of a suitably qualified and experienced person that the dam `as constructed' will deliver the performance stated in that submitted design plan and that dam is compliant in all respects with this environmental authority.

    page 25Regulated structures
  87. G13

    An operational plan must be kept current for each regulated dam.

    page 25Regulated structures
  88. G14

    Where an operational plan covers decommissioning and rehabilitation, those operations are to be consistent with the design plan for the dam and the rehabilitation requirements of this environmental authority.

    page 25Rehabilitation, Regulated structures
  89. G15

    The holder of the environmental authority must mark the mandatory reporting level (MRL) defined in Table G3 - Hydraulic Performance of Regulated Dams on the upstream side of the spillway of any dams containing hazardous waste within the operational land.

    page 25Regulated structures, Waste, Monitoring and reporting
  90. G16

    The licensee must notify the administering authority as soon as possible, but within twenty-four (24) hours, of the level in any regulated dam reaching the MRL; and must immediately act to prevent or minimize any actual or potential environmental harm. OFFICIAL Permit Environmental authority EPML00715513 Standards and Criteria

    page 25Regulated structures, Monitoring and reporting
  91. G17

    The holder of the environmental authority must design, construct, repair, maintain, operate and decommission the dams containing hazardous and non-hazardous waste in accordance with the criteria outlined in Appendix B of the Code of Environmental Compliance for Mining Lease Projects.

    page 26Regulated structures, Waste
  92. G18

    High hazard dams containing hazardous waste shall be inspected by a Registered Professional Engineer Queensland (RPEQ) during the month of September each year or at any time if alarming, unusual or otherwise unsatisfactory conditions are observed.

    page 26Regulated structures, Waste
  93. G19

    At each annual inspection, the condition and adequacy of each regulated dam must be assessed for dam safety and against the necessary structural, geotechnical and hydraulic performance criteria.

    page 26Regulated structures
  94. G20

    At each annual inspection, if a MRL is required, it must be determined and marked on each regulated dam.

    page 26Regulated structures
  95. G21

    For each annual inspection, two copies of a report on the condition and adequacy of each regulated dam, certified by the suitably qualified and experienced person and including any recommended actions to be taken to ensure the integrity of each regulated dam must be provided to the administering authority within ninety (90) days of the inspection.

    page 26Regulated structures, Monitoring and reporting
  96. G22

    The holder of the environmental authority must, promptly, but within one (1) month of receipt of the annual inspection report, formulate and implement actions to ensure that each regulated dam safely performs its intended functions. END OF CONDITIONS FOR SCHEDULE G OFFICIAL Permit Environmental authority EPML00715513 Schedule H - Definitions "AEP" means annual exceedance probability. "appropriately qualified person" means any person who conforms to the EPA operational policy for an "appropriately qualified person (analyst)" in accordance with Section 490(7) of the Environmental Protection Act 1994. "authority" means environmental authority (mining activities) under the Environmental Protection Act 1994. "blasting" means the use of explosive materials to fracture- a) rock, coal and other minerals for later recovery; or b) structural components or other items to facilitate removal from a site or for reuse. "commercial place" means a work place used as an office or for business or commercial purposes, which is not part of the mining activity and does not include employees accommodation or public roads. "contaminated land" means land contaminated by a hazardous contaminant. "dam" means a containment or proposed containment whether permanent or temporary, which is designed to contain, divert or control flowable substances. However this does not include a fabricated or manufactured tank or container designed to a recognised standard. "design plan" in the context of a dam design is the documentation required under the Code of Environmental Compliance for High Hazard Dams Containing Hazardous Waste to describe the physical dimensions of the dam, the materials and standards to be used for construction of the dam, the procedures and criteria to be used for operating the dam and the decommissioning and rehabilitation objectives in terms procedures, works and outcomes at the end of dam life, The documents can include design and investigation reports, drawings, specifications and certifications. "environmental authority holder" means the holder of this environmental authority. "environmental offset" has the meaning in section 7 of the Environmental Offsets Act 2014. "environmental value" means (a) a quality or physical characteristic of the environment that is conducive to ecological health or public amenity or safety; or, (b) another quality of the environment identified and declared to be an environmental value under an environmental protection policy or regulation. "existing authority" has the meaning in section 94 of the Environmental Offsets Act 2014. "flow event" means a flow event producing sufficient water to permit a monitoring creek bed flow of 30cm or more at the sampling station. "flowable substance" means matter or mixture of materials which can be forced to or otherwise flow under any conditions possible in a situation. It includes water, other liquids or a mixture that includes water or any other liquid or suspended solids. "hazardous contaminant" means a contaminant, other than an item of explosive ordnance, that, if improperly treated, stored, disposed of or otherwise managed, is likely to cause serious or material environmental harm because of--(a) its quantity, concentration, acute or chronic toxic effects, carcinogenicity, teratogenicity, mutagenicity, corrosiveness, explosiveness, radioactivity or flammability; or (b) its physical, chemical or infectious characteristics. "hazardous waste" means any substance, whether liquid, solid or gaseous, derived by or resulting from, the processing of minerals that tends to destroy life or impair or endanger health. "infrastructure" means water storage dams, roads and tracks, buildings and other structures built for the purpose of mining activities but does not include facilities required for the long terms management of mining impacts or the protection of potential resources. Such facilities include dams containing hazardous waste, waste OFFICIAL

    page 26Rehabilitation, Regulated structures, Noise and vibration, Waste, Biodiversity, Monitoring and reporting